STEEL WORLD CO., LTD
ONE-STOP SHOP FOR ALL KINDS OF PIPINGS MATERIALS
STEEL WORLD CO., LTD WILL CONTINUOUSLY DO ALL IT S BEST IN ORDER TO PROVIDE YOU WITH MOST
SATISFACTORY SERVICE FROM THE TIME OF RECEMING ENQUIRY TO THE PERFECT MANAGEMENT OF LOGISTICS.
No | PROJECT | CLIENT/CONTRACTOR | SUPPLIED ITEM | MATERIAL | QUANTITY/ COUNTRY |
YEAR |
208 | EDC PROJECT | ENERGY DEVELOPMENT CORPORATION | SMLS/SAW PIPE | CARBON STEEL | 1700 TON PHILIPPINES |
2010 |
209 | GUMUSUT-KAKAP PROJECT | MASTEK OIL TOOLS SDN BHD | SMLS PIPE | F65 | 40TONS SINGAPORE |
2010 |
210 | THIRD ANGLE PROJECT | EIMCO WATER TECHNOLOGY | ROUND BAR | UNS S31803 | 10TONS SINGAPORE |
2010 |
211 | KINABALU NAG | MSET ENGINEERING CORPORATION SDN BHD | FLANGES | SA105N | 20TONS MALAYSIA |
2010 |
212 | JZINK-2NOS T.O THAILAND PROJECT | JAPMAS STEEL SDN.BHD | FLANGES | SA105N/F310 | 40TONS MALAYSIA |
2010 |
213 | TRAIN 3 AND TRAIN 4 PROJECT | BLNG BRUNEI | EFW PIPE | A672 C65 CL.22 | 155TONS BRUNEI |
2010 |
214 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS INTERNATIONAL B.V | FLANGES | A105/A516 GR.70 | 70TONS BRUNEI |
2010 |
215 | DULANG PROJECT | NORSKAR ARENA RESOURCES | PIPE/FITTING/FLANGE | API 5L B/A106 B/A105 | 40TON MALAYSIA |
2010 |
216 | FPSO CIDADE DE SAO PAULO MV-23 | AIBEL(THAILAND) LTD | FORGED PIPE | A182 F316/316L | 10TONS THAILAND |
2010 |
217 | TUPI PROJECT | AIBEL(THAILAND) LTD | FITTINGS/PIPES | WHPY52/WPL6/WPC/API 5L X52/A105N/A516 GR.70/S31803 | 40TONS THAILAND |
2010 |
218 | GUARA-PETROBRAS FPSO CIDADE DE SAO PAULO MV-23 | AIBEL(THAILAND) LTD | FITTINGS | A403 WP316L | 15TONS THAILAND |
2010 |
219 | TGTU1&ARU-2 PROJECT | IRPC COMPANY LIMITED | FLANGES | A105N | 10TONS THAILAND |
2010 |
220 | TUPI PROJECT | AIBEL(THAILAND) LTD | FLANGES/FORGED FITTINGS/SPACER RING | A694 F52/A860 WHPY52/F316L | 40TONS THAILAND |
2010 |
221 | TUPI PROJECT | AIBEL(THAILAND) LTD | FITTINGS | A420 WPL6 | 10TONS THAILAND |
2010 |
222 | MELAKA REFINERY PSR2 REVAMP PROJECT | FOSTER WHEELER ENERGY LIMITED | FLANGES/FORGED FITTINGS | A105N/A185 GR.C/A182 F11 | 15TONS MALAYSIA |
2010 |
223 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS INTERNATIONAL B.V | FLANGES | F51/F316L/S31803/A516 GR.70 | 40TONS MALAYSIA |
2010 |
224 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS INTERNATIONAL B.V | FLANGES | A694 F65/F51/F316L/LF2/A105 | 10TONS MALAYSIA |
2010 |
225 | ONGC OPAL DAHEJ PIPE PREFABRICATION WORKS | UNKNOWN | FLANGES | F22 | 10TONS MALAYSIA |
2010 |
226 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS INTERNATIONAL B.V | SPECTACLE BLINE,SPACER RING | LF2/A516 GR.60/A240 TP316 | 25TONS MALAYSIA |
2010 |
227 | SAND MANAGEMENT PROJECT | CARIGALI HESS OPERATING COMPANY SDN.BHD | FITTINGS/FLANGES | WPL6/ WPB/UNS S31803/A182F51/F316L/ A105N/A516 GR.70/65 |
80TONS MALAYSIA |
2010 |
228 | MEW/C/3656 | EPC OF SHUAIBA NORTH | FLAGNE AWWA | A105N LINED F316L C207 | 40TON DUBAI |
2010 |
229 | MAHSHAHR PIPELINE PROJECT | HILBOD NIROO CO. | ERW/SMLS PIPE | TP316L/A106 GR.B/TP304L | 100TONS IRAN |
2010 |
230 | NF3 PLANT OF BIPC | DARYA PALA EPCC CONTRACTOR | SMLS PIPE | A312 TP304L/A335 P11 | 60 TONS IRAN |
2010 |
231 | NF3 PLANT OF BIPC | DARYA PALA EPCC CONTRACTOR | EFW/SMLS PIPE | A691 GR.11/A335 P11 | 300 TON IRAN |
2010 |
232 | NF3 PLANT OF BIPC | DARYA PALA EPCC CONTRACTOR | ERW/SMLS PIPE | API 5L GR.B/A106B,A333-6 | 400 TON IRAN |
2010 |
233 | BOI PROJECT | AJINOMOTO CO.,LTD | FITTINGS | SUS 304 JIS B2313 | 30 TONS THAILAND |
2010 |
234 | HEXANEDIOL PROJECT | UBE FINE CHEMICALS CO., LTD | FITTINGS,FLANGES | WPB,F316,F347,F304,F316L | 60 TONS THAILAND |
2010 |
235 | BASF PETRONAS CHEMICAL PROJECT | DIALOG OTEC SDN.BHD | TUBE SHEET,FLANGES, | LF2 | 13TONS MALAYSIA |
2010 |
236 | EPCC LANGSAT TERMINAL | LANGSAT TERMINAL SDN.BHD | FITTINGS,FLANGES | WPB | 80TONS MALAYSIA |
2010 |
237 | SURIYA B DEVELOPMENT PROJECT | DIALOG OTEC SDN.BHD | FLANGES, FITTINGS, PIPE | F51,F31803 | 45TONS MALAYSIA |
2010 |
238 | BASF HEAT EXCHANGER | DIALOG OTEC SDN.BHD | FLANGES | F304 | 20TONS MALAYSIA |
2010 |
239 | LANGSAT TERMINAL PHASE 3 | DIALOG OTEC SDN.BHD | FITTINGS,FLANGES | A105,WPB | 47TONS MALAYSIA |
2010 |
240 | SAND MANAGEMENT PROJECT | CARIGALI HESS OPERATING CO.SDN.BHD | FITTINGS,FLANGES | LF2,A105B,A516 GR.70,F316,WPL6,S310803 | 100TONS MALAYSIA |
2010 |
241 | WAYANG WINDU GEOTHERMAL PROJECT | STAR ENERGY | PIPE | API 5L-B | 200 TON INDONESIA |
2010 |
242 | PEQUIVEN MORON FERTILIZER PROJECT | TECNO FRONTIER CO., LTD | PIPE | API 671 CC60,70 / API 5L-B | 100 TON VENEZUELA |
2010 |
243 | LIHIR GOLD PROJECT | AIR PRODUCTS | PIPE | API 5L-B | 70 TON PAPUA NEW GUINEA |
2010 |
244 | EDC PROJECT | ENERGY DEVELOPMENT CORPORATION | PIPE | API 5L-B | 20 TON PHILLIPPINE |
2010 |
245 | JAMBI MERANG PROJECT | PERTAMINA-HESS/PT.TRIPATRA | PIPE | A312 TP316L | 45TON SINGAPORE |
2010 |
246 | TANJUNG PRIOK GAS FIELD POWER PLANT EXTENSION PROJECT | PT. PLN (PERSERO) | PIPE | API 5L-B | 20 TON INDONESIA |
2010 |
247 | UNKNOWN | PT. WAKA MAGMA ENGINEERING | PIPE | API 5L-B | 60 TON SINGAPORE |
2010 |
248 | ROP PROJECT | PT. PERTAMINA (PERSERO) | PIPE | API 5L-B | 10 TON INDONESIA |
2010 |
249 | BALONGAN PROJECT | PT. PERTAMINA (PERSERO) | PIPE | A53-B | 150 TON INDONESIA |
2010 |
250 | BALONGAN PROJECT | PT. PERTAMINA (PERSERO) | FITTING/FORGED FITTING | A234 WPB / A105 | 30 TON INDONESIA |
2010 |
251 | AR RAZI PLANT-V PROJECT | SAUDI METHANOL COMPANY | FLANGE/FITING | A182 F304 / A403 WP304 | SAUDI ARABIA | 2010 |
252 | SAKHALIN II PROJECT | SAKHALIN ENERGY INVESTMENT | FLANGE | A105 / A182 F304 | 15 TON RUSSIA |
2010 |
253 | ZAMZAMA GAS PLANT PROJECT | BHP PETROLEUM (PAKISTAN) | INDUCTION BEND/FITTING | UNS 31803 | PAKISTAN | 2010 |
254 | BLOCK 12W FIELD DEVELOPJMENT FPSO | PREMIER OIL VIETNAM OFFSHORE SV | SE 2:1 HEAD | SA240 TP316/316L | 20 TON SINGAPORE |
2010 |
255 | JAMBI MERANG PROJECT | PERTAMINA-HESS/PT.TRIPATRA | FITTING/FORGED FITTING | A234 WPB / A105 | 50 TON SINGAPORE |
2010 |
256 | JAMBI MERANG PROJECT | PERTAMINA-HESS/PT.TRIPATRA | FITTING/FORGED FITTING | A403 WP304,316/UNS 31803 / A182 F51 | 50 TON SINGAPORE |
2010 |
257 | JAMBI MERANG PROJECT | PERTAMINA-HESS/PT.TRIPATRA | SPECTACLE BLIND/BLIND/SPACER | A283 Gr.C/A240 316L/A182 F51 | 12 TON SINGAPORE |
2010 |
258 | JAMBI MERANG PROJECT | PERTAMINA-HESS/PT.TRIPATRA | BLEED RING | UNS 32760 | SINGAPORE | 2010 |
259 | AMMONIUM NITRATE PRILL PLANT PROJECT | PT. KALTIM NITRATE INDONESIA | FITTING | A403 WP304,316/UNS 31803 / A182 F51,F321 | JAKARTA | 2010 |
260 | CB&I PROJECT | FABRICATOR-PROCESS EQUIPMENT | NOZZLE/FLANGE | A182 F304/304L | 45 TON USA |
2010 |
261 | UNKNOWN | FABRICATOR-PROCESS EQUIPMENT | RING FLANGE | A182 F304/304L | 10 TON USA |
2010 |
262 | MINAS SURFACTANT PROJECT | PETRECO PROCESS SYSTEMS CAMERON | FITTING/FORGED FITTING | A403 WP316,304/ A182 F316,304 | JAKARTA | 2010 |
263 | UNKNOWN | CHEVRON NIGERIA LTD | FLANGE | A105 | 30 TON BELGIUM |
2010 |
264 | UNKNOWN | UNKNOWN | FLANGE | A694 F42, F52 | 20 TON USA |
2010 |
265 | PTTAR CLEAN FUEL PROJECT | SK ENGINEERING & CONSTRUCTION | FITTING | A420 WPL6 | SINGAPORE | 2010 |
266 | UPD-A MODIFICATION EPCC PROJECT | UNKNOWN | FITTING/FLANGE/BOLTNUT/PIPE | A105N/A234 WPB/A193B7,2H | CANADA | 2010 |
267 | ACTEW PROJECT | UNKNOWN | FLANGE | A105N | 20 TON SYDNEY |
2010 |
268 | SABA PROJECT | UNKNOWN | PIPE | API 5L-B / A139-B/ A53-B | 250 TON IRAN |
2010 |
269 | INDONESIAN BURIED PIPE PROJECT | UNKNOWN | PIPE | API 5L X52 | 770 TON INDONESIA |
2010 |
270 | WAYANG WINDU GEOTHERMAL PROJECT | STAR ENERGY | PIPE | API 5L-B | 200 TON INDONESIA |
2010 |
271 | PEQUIVEN MORON FERTILIZER PROJECT | TECNO FRONTIER CO., LTD | PIPE | API 671 CC60,70 / API 5L-B | 100 TON VENEZUELA |
2010 |
272 | LIHIR GOLD PROJECT | AIR PRODUCTS | PIPE | API 5L-B | 70 TON PAPUA NEW GUINEA |
2010 |
273 | EDC PROJECT | ENERGY DEVELOPMENT CORPORATION | 4D BEND | A234 WPB | 20 TON PHILLIPPINE |
2010 |
274 | JAMBI MERANG PROJECT | PERTAMINA-HESS/PT.TRIPATRA | PIPE | A312 TP316L | 45TON SINGAPORE |
2010 |
275 | TANJUNG PRIOK GAS FIELD POWER PLANT EXTENSION PROJECT | PT. PLN (PERSERO) | PIPE | API 5L-B | 20 TON INDONESIA |
2010 |
276 | UNKNOWN | PT. WAKA MAGMA ENGINEERING | PIPE | API 5L-B | 60 TON SINGAPORE |
2010 |
277 | ROP PROJECT | PT. PERTAMINA (PERSERO) | PIPE | API 5L-B | 10 TON INDONESIA |
2010 |
278 | BALONGAN PROJECT | PT. PERTAMINA (PERSERO) | PIPE | A53-B | 150 TON INDONESIA |
2010 |
279 | BALONGAN PROJECT | PT. PERTAMINA (PERSERO) | FITTING,FORGED FITTING | A234 WPB / A105 | 30 TON INDONESIA |
2010 |
280 | AR RAZI PLANT-V PROJECT | SAUDI METHANOL COMPANY | FLANGE,FITING | A182 F304 / A403 WP304 | SAUDI ARABIA | 2010 |
281 | SAKHALIN II PROJECT | SAKHALIN ENERGY INVESTMENT | FLANGE | A105 / A182 F304 | 15 TON RUSSIA |
2010 |
282 | ZAMZAMA GAS PLANT PROJECT | BHP PETROLEUM (PAKISTAN) | INDUCTION BEND,FITTING | UNS 31803 | PAKISTAN | 2010 |
283 | BLOCK 12W FIELD DEVELOPJMENT FPSO | PREMIER OIL VIETNAM OFFSHORE SV | SE 2:1 HEAD | SA240 TP316/316L | 20 TON SINGAPORE |
2010 |
284 | JAMBI MERANG PROJECT | PERTAMINA-HESS/PT.TRIPATRA | FITTING/FORGED FITTING | A234 WPB / A105 | 50 TON SINGAPORE |
2010 |
285 | JAMBI MERANG PROJECT | PERTAMINA-HESS/PT.TRIPATRA | FITTING/FORGED FITTING | A403 WP304,316/UNS 31803 / A182 F51 | 50 TON SINGAPORE |
2010 |
286 | JAMBI MERANG PROJECT | PERTAMINA-HESS/PT.TRIPATRA | SPECTACLE BLIND,BLIND/SPACER | A283 Gr.C/A240 316L/A182 F51 | 12 TON SINGAPORE |
2010 |
287 | JAMBI MERANG PROJECT | PERTAMINA-HESS/PT.TRIPATRA | BLEED RING | UNS 32760 | SINGAPORE | 2010 |
288 | AMMONIUM NITRATE PRILL PLANT PROJECT | PT. KALTIM NITRATE INDONESIA | FITTING | A403 WP304,316/UNS 31803 / A182 F51,F321 | JAKARTA | 2010 |
289 | CB&I PROJECT | FABRICATOR-PROCESS EQUIPMENT | NOZZLE/FLANGE | A182 F304/304L | 45 TON USA |
2010 |
290 | UNKNOWN | FABRICATOR-PROCESS EQUIPMENT | RING FLANGE | A182 F304/304L | 10 TON USA |
2010 |
291 | MINAS SURFACTANT PROJECT | PETRECO PROCESS SYSTEMS CAMERON | FITTING,FORGED FITTING | A403 WP316,304/ A182 F316,304 | JAKARTA | 2010 |
292 | UNKNOWN | CHEVRON NIGERIA LTD | FLANGE | A105 | 30 TON BELGIUM |
2010 |
293 | UNKNOWN | UNKNOWN | FLANGE | A694 F42, F52 | 20 TON USA |
2010 |
294 | PTTAR CLEAN FUEL PROJECT | SK ENGINEERING & CONSTRUCTION | FITTING | A420 WPL6 | SINGAPORE | 2010 |
295 | UPD-A MODIFICATION EPCC PROJECT | UNKNOWN | FITTING,FLANGE,BOLTNUT,PIPE | A105N/A234 WPB/A193B7,2H | CANADA | 2010 |
296 | ACTEW PROJECT | UNKNOWN | FLANGE | A105N | 20 TON SYDNEY |
2010 |
297 | SABA PROJECT | UNKNOWN | PIPE | API 5L-B / A139-B/ A53-B | 250 TON IRAN |
2010 |