STEEL WORLD CO., LTD

ONE-STOP SHOP FOR ALL KINDS OF PIPINGS MATERIALS

STEEL WORLD CO., LTD WILL CONTINUOUSLY DO ALL IT S BEST IN ORDER TO PROVIDE YOU WITH MOST
SATISFACTORY SERVICE FROM THE TIME OF RECEMING ENQUIRY TO THE PERFECT MANAGEMENT OF LOGISTICS.

2008~2014

2008

No PROJECT CLIENT/CONTRACTOR SUPPLIED ITEM MATERIAL QUANTITY/
COUNTRY
YEAR
377 KASHAGAN FIELD DEVELOPMENT PROJECT AGIP KCO SOUR/NON SOUR PIPE A671 CC60 CL.22  1000TON
KAZAKHSTAN 
2008
378 OXY MUKHAIZNA CPFS PROJECT DOSAL CO. WELDED PIPE A672 CL12 C65  1400TON
OMAN 
2008
379 SAUDI KAYAN OLEFINS PROJECT SAUDI KAYAN PETROCHEMICAL COMPANY FLANGE A105/A182F11 50TON
SAUDI ARABIA 
2008
380 CHILLER PETROKIMIA PROJECT PT. PAL INDONESIA U-TUBE A179  10TON
INDONESIA

2008
381 FLAMANVILLE & HAZELWOOD PROJECT PT. PAL INDONESIA PLATE SA516-60N  140TON
INDONESIA
2008
382 OYONG PROJECT PHASE 2 PT. PAL INDONESIA PIPE A106-B  250TON
INDONESIA
2008
383 OYONG PROJECT SANTOS(SAMPANG)PTY.LTD FITTING,TUBE A234 WPB/A105  40TON
INDONESIA
2008
384 FPSO CONVERSION PROJECT   FLANGE A182 F316  50TON
SINGAPORE
2008
385 PNOC OILFIELD DEVELOPMENT PNOC PIPE API 5L-B  3700TON
PHILIPPINE
2008
386 JAMBI MERANG DEVELOPMENT PROJECT PERTAMINA-HESS JAMBI MERANG FITTING A234 WPB/A403 WP304 400TON
INDONESIA
2008
387 MARAFIQ DESALINATION PLANT PROJECT   PIPE A672 B60 CL.22  132TON
SINGAPORE
2008
388 BOJONEGARA STATION PROJECT PT.PERUSAHAAN GAS NEGARA PIPE API 5L-B  13TON
SINGAPORE
2008
389 JABUNG GAS BOOSTER STATION PROJECT PT. TRANSPORTASI GAS INDONESIA PIPE API 5L-B  300TON
INDONESIA
2008
390 FUJAIRAH REFINERY PROJECT FUJAIRAH REFINERY CO. LTD 3D BEND A234 WPB  70TON
U.A.E
2008
391 FATIMA FERTILIZER PROJECT FATIMA FERTILIZER COMPANY PIPE A139-B 25TON
JAPAN
2008
392 QUEENSLAND WATER PROJECT TRANSARLE PTY LIMITED FLANGE A105N  20TON
AUSTRALIA
2008
393 PETRONET LNG AHEJ EXPANSION PROJECT TOYO ENGINEERING CORPORATION FITTING A403WP304  21TON
INDIA
2008
394 PANGKAH LIQUID DEVELOPMENT PROJECT (UPD PROJECT) HESS(INDONESIA-PANGKAH) LIMITED, PT.TRIPATRA SPEC BLIND&SPACER A285 GR.C/A403 200TON
INDONESIA
2008
395 SIDI KRIR SIMPLE CYCLE PROJECT WEST DELTA ELECTRICITY PRODUCTION COMPANY PIPE/FITTING/FLANGE A106 GR.B/A105 250TON
EGYPT
2008
396 EL ATF SIMPLE CYCLE PROJECT MIDDLE DELTA ELECTRICITY PRODUCTION COMPANY PIPE/FITTING/FLANGE A106 GR.B/A105 250TON
EGYPT
2008
397 DBNGP STAGE 5A
EXPANSION PROJECT
DBNGP(WA) NOMINESS P/L FLANGE A105N/A694F52 50TON
AUSTRALIA
2008
398 CONDAMINE PROJECT VISAVAKIT PATANA CORP.LTD PIPE/FITTING A106 GR-B/WPB 121TON
THAILAND
2008
399 MOC PROJECT MAP TA PHUT OLEFINS FITTING/FLANGE/BOLTNUT A403 WP304/A106-B 650TON
THAILAND
2008
400 WORSLEY MULTI-FUEL COGEN
PROJECT
PROPERTY OF AUSTRAIN ENERGY FITTING/PIPE/PLATE SA234 WPC 130TON
THAILAND
2008
401 SINO IRON PROJECT PROPERTY OF AUSTRAIN ENERGY FITTING/FORGING A105/A182 F22  20TON
THAILAND
2008
402 HEAT EXCHANGER
PRESSURE VESSEL
KURTIS KELLY FLANGE SA182 F304/304L  55TON
USA
2008
403 POWER PROJECT BRUNEI LNG SDN BHD FLANGE A182 F11  15TON
BRUNEI
2008
404 JAMNAGAR EXTENSIOIN PROJECT EMERSON PROCESS MANAGEMENT PIPE/FITTING/FLANGE A671 CB60 CL13 20TON
SINGAPORE
2008
405 RELIANCE EWPP 3
GAS METERING PROJECT
EMERSON PROCESS MANAGEMENT FLANGE A694 F52  11TON
SINGAPORE
2008
406 UJUNG PANGKAH
PROJECT
EMERSON PROCESS FLANGE A105  15TON
SINGAPORE
2008
407 REFINERY METERING
PROJECT
EMERSON PROCESS FLANGE A350 LF2  11TON
SINGAPORE
2008
408 RELIANCE EWPP 4
METERING PROJECT
EMERSON PROCESS PIPE/FITTING/FLANGE A106-B/WPB/A105N  25TON
SINGAPORE
2008
409 BGME PROJECT MANAGEMENT COMPANY HOT INDUCTION BEND API 5L-B  23TON
SINGAPORE
2008
410 RABIGH DEVELOPMENT PROJECT MITSUI ENGINEERING FLANGE A105/A182 F11  24TON
SAUDI ARABIA
2008
411 RABIGH DEVELOPMENT
PROJECT
SUMITOMO CHEMICAL FITTING/FORGED FITTING A105/LF2/F11 10TON
SAUDI ARABIA
2008
412 COOGEE RESOURCES
MONTARA PROJECT
CLOUGH(THAILAND) FITTING/FLANGE A182 F51/A350 LF2  13TON
THAILAND
2008
413 NDD-12 PROJECT CHEVRON INDONESIA FITTING A234 WPB  15TON
INDONESIA
2008
414 KRAKATAU PROJECT KRAKATAU ENGINEERING HOT INDUCTION BEND A53-B/A312 TP304L  70TON
INDONESIA
2008
415 SCG INTERCONNECTION
PIPELINES PROJECT
MAP TA PHUT OLEFINS CO., LTD FITTING A234 WPB  20 TON
THAILAND
2008
416 NORTHERN FIELDS DEVELOPMENT PROJECT TAILSMAN MALAYSIA COMPANY/SIME DARBY ENGINEERING FORGED FITTING,FITTING A105N/A403 WP316L 20TON
SINGAPORE
2008
417 PTTPE LDPE PLANT PROJECT PTT POLYETHYLENE COMPANY FITTING A304 WP304/A234 WPB  58TON
THAILAND
2008
418 PPCL BPA PROJECT PTT PHENOLCOMPANY FLANGE A105-GAL/A105  10TON
THAILAND
2008
419 PTTPE LDPE PLANT PROJECT PTT POLYETHYLENE COMPANY FITTING A234 WPB  10TON
THAILAND
2008
420 PPCL BPA PROJECT PTT PHENOLCOMPANY FITTING/FLANGE A234 WPB/A105 250TON
THAILAND
2008
421 MMA NO.2 PROJECT THAI MMA COMPANY LTD FITTING A403 WP304  15TON
THAILAND
2008
422 PPCL BPA PROJECT PTT POLYETHYLENE COMPANY FITTING A403 WP304  20TON
THAILAND
2008
423 PTTPE LDPE PLANT PROJECT PTT POLYETHYLENE COMPANY FLANGE A182 F304  10TON
THAILAND
2008
424 PIPELINE PROJECT HUP STEEL LTD 3D BEND API 5L X42  17TON
THAILAND
2008
425 JDA BLOCK B 17 DEVELOPMENT JUTASAMA FLANGE SA105N/F316L  15TON
MALAYSIA
2008
426 JDA BLOCK B 17 DEVELOPMENT JUTASAMA FORGING SA105N/F316L  11TON
MALAYSIA
2008
427 STEAM DRUM JUTASAMA NOZZLE SA266 GR.2  10TON
MALAYSIA
2008
428 C208 DUMAI JUTASAMA FLANGE A105N/A266 CL.4  15TON
MALAYSIA
2008
429 400 KTA HDPE UNIT YANBU NATIONAL PETROCHEMICAL CO. BOLT&NUT A307 GR.B/B7 2H  15TON
DUBAI
2008
430 400 KTA HDPE UNIT YANBU NATIONAL PETROCHEMICAL CO. BOLT&NUT A307 GR.B/B7/L7 B8  19TON
DUBAI
2008
431 E&PM PROJECT JUBAIL INDUSTRIAL CITY,K.S.A FLANGE A516 GR.70/F304/LF2  20TON
DUBAI
2008
432 MOC CRACKER PROJECT SIAM CEMENT GROUP FLANGE/FIG-8 BLANK A105-GAL/A182 F304  30TON
THAILAND
2008
433 MOC CRACKER PROJECT SIAM CEMENT GROUP FLANGE/SPACER&BLANK A105-GAL/A182 F304 90TON
THAILAND
2008
434 RAYONG OLEFINS PROJECT RAYONG OLEFINS CO./TOYO ENGINEERING FITTING A234 WPB  15TON
THAILAND
2008
435 SHELL GLOBAL SOLUTION SHELL MALAYSIA FITTING UNS31803  20TON
MALAYSIA
2008
436 SHELL GLOBAL SOLUTION SHELL MALAYSIA FLANGE A350 LF2/A105N/A182 F51 40TON
MALAYSIA
2008
437 PETRONAS METHANOL AIR SEPARATION PLANT PROJECT   FLANGE A105N  10TON
MALAYSIA
2008
438 MOQ16 MAERSK OIL QATAR FITTING A403 WP316L  10TON
MALAYSIA
2008
439 MOQ16 MAERSK OIL QATAR FITTING/FORGED FITTING A234 WPL6/A350 LF2  30TON
MALAYSIA
2008
440 MOQ16 MAERSK OIL QATAR FLANGE A350 LF2  15TON
MALAYSIA
2008
441 KUMANG CLUSTER DEVELOPMENT PROJECT PETRONAS CARIGALI SDN BHD FLANGE/ FITTING A516 GR.60/A240 UNS S31803/TP316/WP316L  11TON
MALAYSIA
2008
442 HO CHI MINH PROJECT HO CHI MINH GAS PIPELINE FLANGE A694 F52  10TON
VIETNAM
2008
443 MAERSK OIL QATAR BE&BG PLATFORM MAERSK OIL QATAR FITTING A403 WP316L  20TON
MALAYSIA
2008
444 SAUDI KAYAN PROJECT DAYIM PUNJ LLOYD CONSTUCTION CONTRACTING CO., LTD PIPE A312 TP304L   100TON
SAUDI ARABIA
2008
445 MARAFIQ DESALINATION PLANT PROJECT SIDEM SAUDI LTD KSA PIPE API 5L GR.B  1600TON
SAUDI ARABIA
2008
446 MARAFIQ DESALINATION PLANT PROJECT SIDEM SAUDI LTD KSA FITTING(INTERNAL/EXTERNAL COATING) A234 WPB 900TON
SAUDI ARABIA
2008
447 FISIA FOR RAS ABU FONTAS PROJECT ALLIED INTERNATIONAL SRL LOC. ERW/SAW PIPE API 5L GR.B  900TON
QATAR
2008
448 SAUDI KAYAN PETROCHEMICAL COMPLEX (HDPE) PROJECT SAUDI KAYAN /HQCEC 3 LAYER POLYPROPELENE COATING PIPE A671 CC60/A106-B  90TON/
SAUDI ARABIA 
2008
449 NORTHERN FIELDS BUNGA ORKID DEVELOPMENT PROJECT AKER KAERNER/SIME DARBY SAW PIPE API 5L GR.B  300TON
MALAYSIA
2008
450 PSR2 REVEMP PROJECT FOOSTER WHEELER SAW PIPE API 5L GR.B  250TON
MALAYSIA
2008
451 MELAKA REFINERY PSR2 REVAMP PROJECT MALAYSIAN REFINING COMPANY WELDED ERW PIPE A672 GR.60/API 5L GR.B  1000TON
MALAYSIA
2008

2009

No PROJECT CLIENT/CONTRACTOR SUPPLIED ITEM MATERIAL QUANTITY/
COUNTRY
YEAR
299 RABIGH PC2 PROJECT MITSUI ENGINEERING & SHIPBUILDING CO.,LTD
FITTING A234 WPB SAUDI ARABIA 2009
300 NESTOR OIL TUAS POWER SCOP PROJECT JACOBS ENGINEERING SINGAPORE PTE LTD FITTING A234 WPB/A403 WP316L SINGAPORE 2009
301 SAKHALIN II PROJECT SAKHALIN ENERGY INVESTMENT CO.,LTD FLANGE/GASKET A182 F316/A350 LF2/SOFT IRON 40 TON
RUSSIA
2009
302 SOHAR FERTILISER PROJECT MITSUBISHI HEAVY INDUSTRIES FITTING/FORGED FITTING/FLANGE A403 WP316L/A182 F316L OMAN 2009
303 JAMBI MERANG PROJECT PERTAMINA-HESS/PT.TRIPATRA FLANGE A240 S32760/A182 F51 SINGAPORE 2009
304 JAMBI MERANG PROJECT PERTAMINA-HESS/PT.TRIPATRA FITTING A234 WPB/A105 20 TON
SINGAPORE
2009
305 JAMBI MERANG PROJECT PERTAMINA-HESS/PT.TRIPATRA FITTING A403 WP316L/A182 F51/A815 S31803 25 TON
SINGAPORE
2009
306 SA17780-CWLH REDEVELOPMENT PROJECT DYNA MAC ENGINEERING SERVICES PTE LTD FITTING A694 F52/A860 WPHY52 SINGAPORE 2009
307 CURTIS KELLY USA PROJECT CURTIS KELLY FLANGE A182 F304/304L 55 TON
USA
2009
308 SIDI KRIR&EL ATF POWER STATION PROJECT TOYOTA TSUSHO CORPORATION BOLT/NUT A193 B7/A194 2H 15 TON
EGYPT
2009
309 SPT OLEFINS FURNACES PROJECT EXXONMOBIL CHEMICAL ASIA PACIFIC FITTING/FLANGE A105 10 TON
THAILAND
2009
310 HAZELWOOD-ALSTOM POWER PROJECT PT PAL INDONESIA PIPE/FITTING/FLANGE A106/DIN 2605 T1 BA3 INDONESIA 2009
311 OYONG DEVELOPMENT PROJECT PT PAL INDONESIA FITTING A234 WPB/A105 INDONESIA 2009
312 ROPP PROJECT PT REKAYASA FITTING A182 F304/A403 WP304 SINGAPORE 2009
313 DBNGP EXPANSION PROJECT DBNGP WA NOMINEES PTY LTD FLANGE A694 F60 AUSTRALIA 2009
314 SINO IRON PROJECT VISAVAKIT PATANA CORP.,LTD NOZZLE/LWN FLANGE SA182 F22 CL1 THAILAND 2009
315 WORSLEY MULTI-FUEL COTEN PROJECT AE&E (AUST) PTY LTD FITTING SA234 WP91/WP22 CHINA 2009
316 TPO PROJECT FOSTER WHEELER FITTING/FORGED FITTING/FLANGE A403 WP304A105/A182 F304 35 TON
THAILAND
2009
317 DEVIL CREEK DEVELOPMENT PROJECT CLOUGH THAILAND CO.LIMITD FLANGE A105/A350 LF2 30 TON
INDONESIA
2009
318 PERTAMINA BALONGAN PROJECT KRAKATAU ENGINEERING SMLS/ERW PIPE/FITTING A106 GR.B/A234 WPB 210 TON
INDONESIA
2009
319 JUBILEE FPSO MODEC FITTING/FORGED FITTING/FLANGE A860 WPHY52/A234 WPC/A694 F52 50 TON
SINGAPORE
2009
320 DUBAI WORLD CENTRAL INTERNATIONAL AIRPORT GOVERNMENT OF DUBAI FITTING A234 WPB 30 TON
DUBAI
2009
321 UZTRANSGAS KUNGRAD GAS DEHYDRATION PROJECT CW SINGAPORE BOLT/NUT A193 GR.B7/A194 GR.2H 20 TON
UZBEKISTAN
2009
322 UZTRANSGAS KUNGRAD GAS DEHYDRATION PROJECT CW SINGAPORE SAW PIPE/FITTING API 5L-B(PSL1)/A671 CC60 C22 S2/WPL6 200 TON
UZBEKISTAN
2009
323 JAMBI MERANG PROJECT PERTAMINA-HESS/PT.TRIPATRA EFW PIPE A312 TP316L SINGAPORE 2009
324 JAMBI MERANG PROJECT PERTAMINA-HESS/PT.TRIPATRA SMLS PIPE A106 GR-B 50 TON
SINGAPORE
2009
325 TPO PROJECT MTP HPPO MANUFACTURING CO.,LTD EFW PIPE A672 C70 CL.12 200 TON
THAILAND
2009
326 BM PROJECT MITSUBISHI HEAVY INDUSTRIES LTD EFW PIPE A358 304-CL2 BRUNEI 2009
327 SPOX PROJECT EXXONMOBIL CHEMICAL ASIA PACIFIC SMLS/ERW PIPE A106 GR-B/API 5L-B 30 TON
SINGAPORE
2009
328 RABIAH DEVELOPMENT PROJECT MITSUI ENGINEERING & SHIPBUILDING CO.,LTD SAW PIPE API 5L-B (PSL1) SAUDI ARABIA 2009
329 SINGAPORE LOCAL PROJECT VAN LEEUWEN PIPE AND TUBE SINGAPORE ERW PIPE ASTM A53B 20 TON
SINGAPORE
2009
330 SINGA PIPELINE PROJECT PT MEDCO E&P INDONESIA ERW PIPE API 5L-X65 1020 TON
INDONESIA
2009
331 MAIN NORTH DURI DEVELOPMENT PROJECT BP MIGAS FOR CHEVRON INDONESIA ERW PIPE API 5L-B(PSL1) 110 TON
INDONESIA
2009
332 RABIGH PC2 PROJECT MITSUI ENGINEERING & SHIPBUILDING CO.,LTD ERW PIPE/FLANGE API 5L-B (PSL1) / A105 SAUDI ARABIA 2009
333 NNGPF-PAD M1&M2 PROJECT PNOC/EDC ERW/SAW PIPE API 5L-B (PSL1) 10 TON
PHILIPPINE
2009
334 LGPF-PAD MG-F WELLS PROJECT PNOC/EDC ERW/SAW PIPE API 5L-B(PSL1) 320 TON
PHILIPPINE
2009
335 WORSLEY MULTI FUEL COGEN PROJECT AE&E NANJING BOILER CO.,LTD FLANGE/FITTING/GASKET SA234 WP22 CHINA 2009
336 M3-232 DULANG PROJECT PETRONAS FLANGE, FORGED FITTING SA694 F60 10 TONS
MALAYSIA
2009
337 SMDS JETTY UPGRADE PHASE1 SHELL MDS FITTING A182 F321/A403 WP321 8 TONS
MALAYSIA
2009
338 PSR-2 REVAMP PROJECT FOSTER WHEELER ENERGY LIMITED FITTING/FLANGE F321/F5/F304L/A285 GR.C/A105 23 TONS
MALAYSIA
2009
339 MELAKA REFINERY PSR2 REVAMP PROJECT TUAH NUSA SDN BHD FITTING/FLANGE F5,F9,F11,F316L, F321,F304L,A105 12 TONS
MALAYSIA
2009
340 KUMANG&TANGGA BARAT CLUSTER DEVELOPMENT PROJECT PETRONAS CARIGALI SDN BHD FLANGE/FORGED FITTING LF2/A105N/A182 F316L/A694 F65 13 TONS
MALAYSIA
2009
341 FOSTER WHEELER PROJECT FOSTER WHEELER E&C SDN BHD FLANGE/FITTING F321/A105N/F316/A285 GR.C/F9/F11/F5 20 TONS
MALAYSIA
2009
342 CARIGALI HEESS MRU PROJECT TUAH NUSA SDN. BHD FITTING/FLANGE WP316L/WPL6/ WPB/A105N/F316L 306 TONS
MALAYSIA
2009
343 PSR-2 REVAMP PROJECT FORSTER WHEELER SDN. BHD FITTING/FLANGE F11/F9/A285 GR.C/F321/F304H 15 TONS
MALAYSIA
2009
344 PSR-2 REVAMP PROJECT FOSTER WHEELER E&C SDN BHD FLANGEOLET/SPACER RING A182 F51/A815 UNS S31803 20 TONS
MALAYSIA
2009
345 CARIGALI HEESS MRU PROJECT TUAH NUSA SDN BHD FITTING/FLANGE WPL6/A234 WPB/A240 TP316 294 TONS
MALAYSIA
2009
346 MAINTENANCE MALAYSIAN FEFINING COMPANY SDN BHD FITTING/FLANGE A105N/F321/A182 F11/F5/A387 GR.5 12 TONS
MALAYSIA
2009
347 MAINTENANCE PETRONAS FITTING/FLANGE A182 F316 / A240 TP316 16TONS
MALAYSIA
2009
348 MAINTENANCE SHELL GLOBAL SOLUTIONS INTERNATIONAL FITTING/FLANGE A105/F65/F51/ S31803 14 TONS
MALAYSIA
2009
349 MAINTENANCE BRUNEI SHELL PETROLEUM CO. SDN.BHD. FLANGE A240 TP316/A105NA182 F304L 6 TONS
MALAYSIA
2009
350 FOSTER WHEELER PROJECT FOSTER WHEELER FLANGE/FITTING LF2/A105N/A182 F321 50 TONS
MALAYSIA
2009
351 FOSTER WHEELER PROJECT FOSTER WHEELER FLANGE A240 GR.321/A516 GR.70/A182 F9 12 TONS
MALAYSIA
2009
352 FOSTER WHEELER PROJECT FOSTER WHEELER E&C SDN BHD SPACER RING A285 GR.C/A387 GR.11/GR.9/GR.5 10 TONS
MALAYSIA
2009
353 PPCL BPA PROJECT (BOI PROJECT) PTT PHENOL COMPANY LIMITED FITTING A403 WP304L 21 TONS
THAILAND

2009
354 PPCL BPA PROJECT (BOI PROJECT) PTT PHENOL COMPANY LIMITED FITTING/FLANGE A403 WP304/A105 81 TONS
THAILAND
2009
355 BOI PROJECT PTT POLYETHYLENE COMPANY LIMITED FLANGE A105N/A182 F304L/F316L 90 TONS
THAILAND
2009
356 BOI PROJECT PTT PHENOL COMPAY LIMITED. FITTING A403 WP304 33 TONS
THAILAND
2009
357 ENERFLEX BP PROJECT SPECIAL TECHNICAL SERVICES LLC FLANGE SA350 LF2 6.8 TONS
OMAN
2009
358 KANSAI-30 VESSELS&HEAT EXCHANGE KANSAI CHEMICAL ENGINEERING TUBE/U-TUBE A213 TP304/304L 7 TONS
MALAYSIA
2009
359 LANGSAT TERMINAL PROJECT LANGSAT TERMINAL SDN BHD FORGED FITTING A105 16 TONS
MALAYSIA
2009
360 LANGSAT TERMINAL PROJECT LANGSAT TERMINAL SDN BHD FITTING/FLANGE A234 WPB/A105 438 TONS
MALAYSIA
2009
361 TUPI PROJECT AIBEL LIMITED FITTING A403 WP316L 14 TON
THAILAND
2009
362 TUPI PROJECT AIBEL LIMITED FORGED BAR A694 F52 7 TON
THAILAND
2009
363 TUPI PROJECT AIBEL LIMITED FORGED PIPE A671 GR.CC65 CL.22 30 TON
THAILAND
2009
364 PSR2 REVAMP PROJECT FORSTER WHELLER SAW PIPE API 5L GR.B PSL 2 50 TON
MALAYSIA
2009
365 MELAKA REFINERY PSR2 RAVAMP PROJECT MALAYSIAN REFINING COMPANY ERW/SAW PIPE A672 CC60 CL.22/API 5L GR.B 65 TON
MALAYSIA
2009
366 KUMANG&TANGGA BARAT CLUSTER DEVELOPMENT PROJECT SIME DARBY ENGINEERING SDN BHD ERW PIPE A671 GR.CC65 CL.22 600 TON
MALAYSIA
2009
367 ARTHIT PROJECT PANTECH SAW PIPE A671 CL.22 S2 40 TON
MALAYSIA
2009
368 SAUDI KAYAN HDPE PROJECT DAELIM SMLS PIPE A106-B 3 LAYER PE COATING 60 TON
MALAYSIA
2009
369 LANGSAT TERMINAL PROJECT LANGSAT TERMINAL SDN BHD ERW/SAW PIPE API 5L GR.B PSL 1 2,750 TON
MALAYSIA
2009
370 LANGSAT TERMINAL PROJECT LANGSAT TERMINAL SDN BHD ERW PIPE API 5L GR.B 500 TON
MALAYSIA
2009
371 DE&C PUNJ-LLOYD SSGP PROJECT DIALOG OTEC SDN BHD SAW PIPE API 5L X70 PSL2 108 TON
MALAYSIA
2009

2010

No PROJECT CLIENT/CONTRACTOR SUPPLIED ITEM MATERIAL QUANTITY/
COUNTRY
YEAR
212 EDC PROJECT ENERGY DEVELOPMENT CORPORATION SMLS/SAW PIPE CARBON STEEL 1700 TON
PHILIPPINES
2010
213 GUMUSUT-KAKAP PROJECT MASTEK OIL TOOLS SDN BHD SMLS PIPE F65 40TONS
SINGAPORE
2010
214 THIRD ANGLE PROJECT EIMCO WATER TECHNOLOGY ROUND BAR UNS S31803 10TONS
SINGAPORE
2010
215 KINABALU NAG MSET ENGINEERING CORPORATION SDN BHD FLANGES SA105N 20TONS
MALAYSIA
2010
216 JZINK-2NOS T.O THAILAND PROJECT JAPMAS STEEL SDN.BHD FLANGES SA105N/F310 40TONS
MALAYSIA
2010
217 TRAIN 3 AND TRAIN 4 PROJECT BLNG BRUNEI EFW PIPE A672 C65 CL.22 155TONS
BRUNEI
2010
218 SHELL PROJECT SHELL GLOBAL SOLUTIONS INTERNATIONAL B.V FLANGES A105/A516 GR.70 70TONS
BRUNEI
2010
219 DULANG PROJECT NORSKAR ARENA RESOURCES PIPE/FITTING/FLANGE API 5L B/A106 B/A105 40TON
MALAYSIA
2010
220 FPSO CIDADE DE SAO PAULO MV-23 AIBEL(THAILAND) LTD FORGED PIPE A182 F316/316L 10TONS
THAILAND
2010
221 TUPI PROJECT AIBEL(THAILAND) LTD FITTINGS/PIPES WHPY52/WPL6/WPC/API 5L X52/A105N/A516 GR.70/S31803 40TONS
THAILAND
2010
222 GUARA-PETROBRAS FPSO CIDADE DE SAO PAULO MV-23 AIBEL(THAILAND) LTD FITTINGS A403 WP316L 15TONS
THAILAND
2010
223 TGTU1&ARU-2 PROJECT IRPC COMPANY LIMITED FLANGES A105N 10TONS
THAILAND
2010
224 TUPI PROJECT AIBEL(THAILAND) LTD FLANGES/FORGED FITTINGS/SPACER RING A694 F52/A860 WHPY52/F316L 40TONS
THAILAND
2010
225 TUPI PROJECT AIBEL(THAILAND) LTD FITTINGS A420 WPL6 10TONS
THAILAND
2010
226 MELAKA REFINERY PSR2 REVAMP PROJECT FOSTER WHEELER ENERGY LIMITED FLANGES/FORGED FITTINGS A105N/A185 GR.C/A182 F11 15TONS
MALAYSIA
2010
227 SHELL PROJECT SHELL GLOBAL SOLUTIONS INTERNATIONAL B.V FLANGES F51/F316L/S31803/A516 GR.70 40TONS
MALAYSIA
2010
228 SHELL PROJECT SHELL GLOBAL SOLUTIONS INTERNATIONAL B.V FLANGES A694 F65/F51/F316L/LF2/A105 10TONS
MALAYSIA
2010
229 ONGC OPAL DAHEJ PIPE PREFABRICATION WORKS UNKNOWN FLANGES F22 10TONS
MALAYSIA
2010
230 SHELL PROJECT SHELL GLOBAL SOLUTIONS INTERNATIONAL B.V SPECTACLE BLINE,SPACER RING LF2/A516 GR.60/A240 TP316 25TONS
MALAYSIA
2010
231 SAND MANAGEMENT PROJECT CARIGALI HESS OPERATING COMPANY SDN.BHD FITTINGS/FLANGES WPL6/ WPB/UNS S31803/A182F51/F316L/
A105N/A516 GR.70/65
80TONS
MALAYSIA
2010
232 MEW/C/3656 EPC OF SHUAIBA NORTH FLAGNE AWWA A105N LINED F316L C207 40TON
DUBAI
2010
233 BOI PROJECT AJINOMOTO CO.,LTD FITTINGS SUS 304 JIS B2313 30 TONS
THAILAND
2010
234 HEXANEDIOL PROJECT UBE FINE CHEMICALS CO., LTD FITTINGS,FLANGES WPB,F316,F347,F304,F316L 60 TONS
THAILAND
2010
235 BASF PETRONAS CHEMICAL PROJECT DIALOG OTEC SDN.BHD TUBE SHEET,FLANGES, LF2 13TONS
MALAYSIA
2010
236 EPCC LANGSAT TERMINAL LANGSAT TERMINAL SDN.BHD FITTINGS,FLANGES WPB 80TONS
MALAYSIA
2010
237 SURIYA B DEVELOPMENT PROJECT DIALOG OTEC SDN.BHD FLANGES, FITTINGS, PIPE F51,F31803 45TONS
MALAYSIA
2010
238 BASF HEAT EXCHANGER DIALOG OTEC SDN.BHD FLANGES F304 20TONS
MALAYSIA
2010
239 LANGSAT TERMINAL PHASE 3 DIALOG OTEC SDN.BHD FITTINGS,FLANGES A105,WPB 47TONS
MALAYSIA
2010
240 SAND MANAGEMENT PROJECT CARIGALI HESS OPERATING CO.SDN.BHD FITTINGS,FLANGES LF2,A105B,A516 GR.70,F316,WPL6,S310803 100TONS
MALAYSIA
2010
241 WAYANG WINDU GEOTHERMAL PROJECT STAR ENERGY PIPE API 5L-B 200 TON
INDONESIA
2010
242 PEQUIVEN MORON FERTILIZER PROJECT TECNO FRONTIER CO., LTD PIPE API 671 CC60,70 / API 5L-B 100 TON
VENEZUELA
2010
243 LIHIR GOLD PROJECT AIR PRODUCTS PIPE API 5L-B 70 TON
PAPUA NEW GUINEA
2010
244 EDC PROJECT ENERGY DEVELOPMENT CORPORATION PIPE API 5L-B 20 TON
PHILLIPPINE
2010
245 JAMBI MERANG PROJECT PERTAMINA-HESS/PT.TRIPATRA PIPE A312 TP316L 45TON
SINGAPORE
2010
246 TANJUNG PRIOK GAS FIELD POWER PLANT EXTENSION PROJECT PT. PLN (PERSERO) PIPE API 5L-B 20 TON
INDONESIA
2010
247 UNKNOWN PT. WAKA MAGMA ENGINEERING PIPE API 5L-B 60 TON
SINGAPORE
2010
248 ROP PROJECT PT. PERTAMINA (PERSERO) PIPE API 5L-B 10 TON
INDONESIA
2010
249 BALONGAN PROJECT PT. PERTAMINA (PERSERO) PIPE A53-B 150 TON
INDONESIA
2010
250 BALONGAN PROJECT PT. PERTAMINA (PERSERO) FITTING/FORGED FITTING A234 WPB / A105 30 TON
INDONESIA
2010
251 AR RAZI PLANT-V PROJECT SAUDI METHANOL COMPANY FLANGE/FITING A182 F304 / A403 WP304 SAUDI ARABIA 2010
252 SAKHALIN II PROJECT SAKHALIN ENERGY INVESTMENT FLANGE A105 / A182 F304 15 TON
RUSSIA
2010
253 ZAMZAMA GAS PLANT PROJECT BHP PETROLEUM (PAKISTAN) INDUCTION BEND/FITTING UNS 31803 PAKISTAN 2010
254 BLOCK 12W FIELD DEVELOPJMENT FPSO PREMIER OIL VIETNAM OFFSHORE SV SE 2:1 HEAD SA240 TP316/316L 20 TON
SINGAPORE
2010
255 JAMBI MERANG PROJECT PERTAMINA-HESS/PT.TRIPATRA FITTING/FORGED FITTING A234 WPB / A105 50 TON
SINGAPORE
2010
256 JAMBI MERANG PROJECT PERTAMINA-HESS/PT.TRIPATRA FITTING/FORGED FITTING A403 WP304,316/UNS 31803 / A182 F51 50 TON
SINGAPORE
2010
257 JAMBI MERANG PROJECT PERTAMINA-HESS/PT.TRIPATRA SPECTACLE BLIND/BLIND/SPACER A283 Gr.C/A240 316L/A182 F51 12 TON
SINGAPORE
2010
258 JAMBI MERANG PROJECT PERTAMINA-HESS/PT.TRIPATRA BLEED RING UNS 32760 SINGAPORE 2010
259 AMMONIUM NITRATE PRILL PLANT PROJECT PT. KALTIM NITRATE INDONESIA FITTING A403 WP304,316/UNS 31803 / A182 F51,F321 JAKARTA 2010
260 CB&I PROJECT FABRICATOR-PROCESS EQUIPMENT NOZZLE/FLANGE A182 F304/304L 45 TON
USA
2010
261 UNKNOWN FABRICATOR-PROCESS EQUIPMENT RING FLANGE A182 F304/304L 10 TON
USA
2010
262 MINAS SURFACTANT PROJECT PETRECO PROCESS SYSTEMS CAMERON FITTING/FORGED FITTING A403 WP316,304/ A182 F316,304 JAKARTA 2010
263 UNKNOWN CHEVRON NIGERIA LTD FLANGE A105 30 TON
BELGIUM
2010
264 UNKNOWN UNKNOWN FLANGE A694 F42, F52 20 TON
USA
2010
265 PTTAR CLEAN FUEL PROJECT SK ENGINEERING & CONSTRUCTION FITTING A420 WPL6 SINGAPORE 2010
266 UPD-A MODIFICATION EPCC PROJECT UNKNOWN FITTING/FLANGE/BOLTNUT/PIPE A105N/A234 WPB/A193B7,2H CANADA 2010
267 ACTEW PROJECT UNKNOWN FLANGE A105N 20 TON
SYDNEY
2010
268 INDONESIAN BURIED PIPE PROJECT UNKNOWN PIPE API 5L X52 770 TON
INDONESIA
2010
269 WAYANG WINDU GEOTHERMAL PROJECT STAR ENERGY PIPE API 5L-B 200 TON
INDONESIA
2010
270 PEQUIVEN MORON FERTILIZER PROJECT TECNO FRONTIER CO., LTD PIPE API 671 CC60,70 / API 5L-B 100 TON
VENEZUELA
2010
271 LIHIR GOLD PROJECT AIR PRODUCTS PIPE API 5L-B 70 TON
PAPUA NEW GUINEA
2010
272 EDC PROJECT ENERGY DEVELOPMENT CORPORATION 4D BEND A234 WPB 20 TON
PHILLIPPINE
2010
273 JAMBI MERANG PROJECT PERTAMINA-HESS/PT.TRIPATRA PIPE A312 TP316L 45TON
SINGAPORE
2010
274 TANJUNG PRIOK GAS FIELD POWER PLANT EXTENSION PROJECT PT. PLN (PERSERO) PIPE API 5L-B 20 TON
INDONESIA
2010
275 UNKNOWN PT. WAKA MAGMA ENGINEERING PIPE API 5L-B 60 TON
SINGAPORE
2010
276 ROP PROJECT PT. PERTAMINA (PERSERO) PIPE API 5L-B 10 TON
INDONESIA
2010
277 BALONGAN PROJECT PT. PERTAMINA (PERSERO) PIPE A53-B 150 TON
INDONESIA
2010
278 BALONGAN PROJECT PT. PERTAMINA (PERSERO) FITTING,FORGED FITTING A234 WPB / A105 30 TON
INDONESIA
2010
279 AR RAZI PLANT-V PROJECT SAUDI METHANOL COMPANY FLANGE,FITING A182 F304 / A403 WP304 SAUDI ARABIA 2010
280 SAKHALIN II PROJECT SAKHALIN ENERGY INVESTMENT FLANGE A105 / A182 F304 15 TON
RUSSIA
2010
281 ZAMZAMA GAS PLANT PROJECT BHP PETROLEUM (PAKISTAN) INDUCTION BEND,FITTING UNS 31803 PAKISTAN 2010
282 BLOCK 12W FIELD DEVELOPJMENT FPSO PREMIER OIL VIETNAM OFFSHORE SV SE 2:1 HEAD SA240 TP316/316L 20 TON
SINGAPORE
2010
283 JAMBI MERANG PROJECT PERTAMINA-HESS/PT.TRIPATRA FITTING/FORGED FITTING A234 WPB / A105 50 TON
SINGAPORE
2010
284 JAMBI MERANG PROJECT PERTAMINA-HESS/PT.TRIPATRA FITTING/FORGED FITTING A403 WP304,316/UNS 31803 / A182 F51 50 TON
SINGAPORE
2010
285 JAMBI MERANG PROJECT PERTAMINA-HESS/PT.TRIPATRA SPECTACLE BLIND,BLIND/SPACER A283 Gr.C/A240 316L/A182 F51 12 TON
SINGAPORE
2010
286 JAMBI MERANG PROJECT PERTAMINA-HESS/PT.TRIPATRA BLEED RING UNS 32760 SINGAPORE 2010
287 AMMONIUM NITRATE PRILL PLANT PROJECT PT. KALTIM NITRATE INDONESIA FITTING A403 WP304,316/UNS 31803 / A182 F51,F321 JAKARTA 2010
288 CB&I PROJECT FABRICATOR-PROCESS EQUIPMENT NOZZLE/FLANGE A182 F304/304L 45 TON
USA
2010
289 UNKNOWN FABRICATOR-PROCESS EQUIPMENT RING FLANGE A182 F304/304L 10 TON
USA
2010
290 MINAS SURFACTANT PROJECT PETRECO PROCESS SYSTEMS CAMERON FITTING,FORGED FITTING A403 WP316,304/ A182 F316,304 JAKARTA 2010
291 UNKNOWN CHEVRON NIGERIA LTD FLANGE A105 30 TON
BELGIUM
2010
292 UNKNOWN UNKNOWN FLANGE A694 F42, F52 20 TON
USA
2010
293 PTTAR CLEAN FUEL PROJECT SK ENGINEERING & CONSTRUCTION FITTING A420 WPL6 SINGAPORE 2010
294 UPD-A MODIFICATION EPCC PROJECT UNKNOWN FITTING,FLANGE,BOLTNUT,PIPE A105N/A234 WPB/A193B7,2H CANADA 2010
295 ACTEW PROJECT UNKNOWN FLANGE A105N 20 TON
SYDNEY
2010

2011

No PROJECT CLIENT/CONTRACTOR SUPPLIED ITEM MATERIAL QUANTITY/
COUNTRY
YEAR
160 FPSO CIDADE DE SAO PAULO MV-23 MODEC FLANGES,FORGED PIPE A105N,A694 F52,A312 TP316L 160TONS THAILAND 2011
161 GUARA PROJECT AIBEL LIMITED FLANGES,FIITTINGS A516 70,A350 LF2, A240 316L,
A234 WPB
40TONS THAILAND  2011
162 GUARA PETROBRAS FPSO DIDADE DE SAO PAULO MV-23 AIBEL LIMITED FITTINGS, FLANGES A403 WP316L, A234 WPB,
A516 GR.70
30TONS THAILAND 2011
163 GUARA PETROBRAS FPSO DIDADE DE SAO PAULO MV-23 AIBEL LIMITED FORGED FITTINGS A182 F51 20TONS THAILAND 2011
164 TANGGA BARAI CLUSTER PROJECT PETRONAS CALIGARI SDN.BHD SPACER A350 LF2, A182 F316 20TONS MALAYSIA 2011
165 PLANT REJUVENATION & REVAMP 2 PROJECT PETRONAS FORGED FITTINGS,FITTINGS A403 WP304L, A105N,A350 LF2 30TONS MALAYSIA 2011
166 PLANT REJUVENATION & REVAMP 2 PROJECT PETRONAS SAW PIPES API 5LB PSL1 170TONS MALAYSIA 2011
167 SHELL PROJECT SHELL GLOBAL SOLUTIONS INTERNATIONAL FLANGES A182 F51,F316L A350 LF2,A105 40TONS MALAYSIA 2011
168 SHELL PROJECT SHELL GLOBAL SOLUTIONS INTERNATIONAL FITTINGS A403 WP316L,A815 S31803,WPL6 65TONS MALAYSIA 2011
169 PLANT REJUVENATION & REVAMP 2 PROJECT PETRONAS FORGED FITTINGS,FITTINGS A105N 25TONS MALAYSIA 2011
170 SHELL PROJECT SHELL GLOBAL SOLUTIONS INTERNATIONAL FLANGES A516 60 SPACER RING 20TONS MALAYSIA 2011
171 MAINTENANCE PT. PETROKIMIA SEAMLESS PIPE API 5L-B 335TON
INDONESIA
2011
172 SUBAN 12 - COPI PROJECT UNKNOWN FLANGE,BLANK,SPACER,
BLEED RING
A105N/A182F51/A516-60 INDONESIA 2011
173 SABAH OIL AND GAS TERMINAL PROJECT ASTURI METAL BUILDERS(M) SDN.BHD FORGING SA350LF3/LF2/SA105N/
SA182F304L
102TON
MALAYSIA
2011
174 UNKNOWN UNKNOWN FORGING SA965/SA336 F304/304L 355TON
BELGIUM
2011
175 UNKNOWN UNKNOWN FORGING SA350 LF2 20TON
USA
2011
176 UNKNOWN UNKNOWN NOZZLE,FLANGE SA182F304L/F316L USA 2011
177 UNKNOWN UNKNOWN FITTING A234 WPB 37TON
USA
2011
178 UNKNOWN UNKNOWN FORGING,FLANGE,NOZZLE SA105 USA 2011
179 UNKNOWN UNKNOWN FLANGE,PADDLE BLIND A105/A697-F70 34TON
USA
2011
180 PETRONAS PROJECT SAIM DARBY SAW PIPE API 5L-B PSL1 140TON
MALAYSIA
2011
181 UNKNOWN UNKNOWN SE 2:1 HEAD SA516 GR 70N 18TON
SINGAPORE
2011
182 SOUTH SUMATRA NGL PROJECT PT. E1-PERTAGAS WELDED PIPE A53-B 415TON
INDONESIA
2011
183 SOUTH SUMATRA NGL PROJECT PT. E1-PERTAGAS WELDED PIPE A312 TP304 32TON
INDONESIA
2011
184 SOUTH SUMATRA NGL PROJECT PT. E1-PERTAGAS FITTING,FORGED FITTING A403WP304/A182F304/
A234WPB/A105
20TON
INDONESIA
2011
185 SOUTH SUMATRA NGL PROJECT PT. E1-PERTAGAS NOZZLE,FLANGE,BLANK
/SPACER
SA350LF2/SA182F304/
SA516 GR.70
20TON
INDONESIA
2011
186 SOUTH SUMATRA NGL PROJECT PT. E1-PERTAGAS 5D BEND API 5L.B PSL2 ERW INDONESIA 2011
187 UNKNOWN PT. SULPHINDO ADIUSAHA PIPE,FITTING,FLANGE B861 WPT2/B363 WPT2/B381 GR.F2/A53-B/A234WPB/A105 22TON
INDONESIA
2011
188 PERTAMINA BALONGAN PROJECT PT. PERTAMINA (PERSERO) FLANGE A182 F321 INDONESIA 2011
189 MT1&HT1 PROJECT UNKNOWN FORGED PIPE/FITTING/
FLANGE
A182F51/S31803 VIETNAM 2011
190 NS1 PROJECT UNKNOWN NOZZLE A182F91/F22CL.1/A105 VIETNAM 2011
191 TUPI3 PROJECT UNKNOWN FITTING,FLANGE A860 WPHY52/A420 WPL6/A403 WP316L/UNS32750 20TON
SINGAPORE
2011
192 NINGBO LNG PROJECT UNKNOWN FLANGE,GASKET,
FITTING,PIPE
A182 F316L/A312 TP316L CHINA 2011
193 CILIPADI GAS FIELD DEVELOPMENT PROJECT CONTRUCTION OF TOPSIDE SARAWAK SHELL BHD 3D PIPE BEND A182 F51 MALAYSIA 2011
194 UNKNOWN TRANS THAI MALAYSIA (THAILAND) LIMITED FORGING A3SA350 LF2 CL.1 MALAYSIA 2011
195 KHARYAGA PROJECT KNM FORGED FITTINGS A350 LF2 MALAYSIA 2011
196 UNKNOWN HYUNDAI HEAVY INSTUSTRIES CO. ERW PIPE API 5L-B THAILAND 2011
197 CCG HDS PROJECT TECHNIP SPECTACLE BLIND,BLIND/SPACER A240 TP321/TP316/A387-11 CL.2 THAILAND 2011
198 PLATFORM COMPRESSION FACILITIES PROJECT THAI OIL FLANGE,FITTING,SPADE
/SPACER
A105N (GALV.) THAILAND 2011
199 UNKNOWN UNKNOWN BOLTNUT A193 B7/2H THAILAND 2011
200 FIONA STANLY HOSPITAL UNKNOWN AS2129 FLANGE A105N AUSTRALIA 2011
201 UNKNOWN UNKNOWN AS4087 FLANGE A105N 43TON
AUSTRALIA
2011
202 ACTEW PROJECT UNKNOWN AWWA FLANGE A105N AUSTRALIA 2011
203 RABIGH RABIGH REFINING AND PETROCHEMICAL COMPANY SAW PIPE, FLANGE API 5L-GR.B/A105N SAUDI ARABIA 2011
204 PHASE-III REFINERY PROJECTS ENGINEERS INDIA LIMITED FLANGE, SPACER/BLIND A182 F11/A105 INDIA 2011
205 PHASE-III REFINERY PROJECTS MANGALORE REFINERY AND PETROCHEMICALS LIMITED FLANGE, SPACER/BLIND A182 F11/A105N INDIA 2011

2012

No PROJECT CLIENT/CONTRACTOR SUPPLIED ITEM MATERIAL QUANTITY/
COUNTRY
YEAR
67 CONTRACT 32/5395/QR-01/2012
(NEW DRY GAS POWER STATION PROJECT)
SCOP
(STATE COMPANY FOR OIL PROJECT)
ERW PIPE API 5L X60 PSL2 ERW PIPE
(DEALING IN COMMISSION BASE)
6062TON
IRAQ
2012
68 CONTRACT 32/5395/QR-01/2012
(NEW DRY GAS POWER STATION PROJECT)
SCOP
(STATE COMPANY FOR OIL PROJECT)
SAW PIPE API 5L X60 PSL2 LSAW
PIPE (DEALING IN COMMISSION BASE)
5192TON
IRAQ
2012
69 CHANA COMBINED CYCLE POWER
PLANT BLOCK 2/ TRAIN 1&2
ELECTRICITY GENERATING AUTHORITY OF THAILAND FLANGES, FITTINGS A105 GAL,A182 F316L,F304L,A403 WP304L 50TONS
THAILAND
2012
70 PTTAR IRPC MULTIPRODUCT PIPELINE PROJECT IRPC PUBLIC COMPANY FLANGES, SPECTACLE BLIND A105, A516 GR.70 20TONS THAILAND 2012
71 RUNG TAWAN PROJECT NONE FLANGES A182 F304, A105 24TONS
THAILAND
2012
72 AYT PROJECT AJINOMOTO CO., LTD FITTINGS JIS B2313 S304,S316L 33TONS THAILAND 2012
73 TOPIS R TOPSIDE EXXON MOBILE FITTINGS,FLANGES A815 S31803, A182 F51 20TONS
MALAYSIA
2012
74 TALISMAN
RO304-2010
PTSC FLANGES A182 F53 40TONS
MALAYSIA
2012
75 KBB NORTHERN HUB PROJECT KPOC HANGER,COMPACT FLANGES A694 F65, F70 65TONS
MALAYSIA
2012
76 BIEN DONG 1 PROJECT BIEN DONG PETROLEUM OPERATION COMPANY FORGED FITTINGS A105N 24TONS
MALAYSIA
2012
77 FPSO CENDOR NONE FLANGES SS400 30TONS
MALAYSIA
2012
78 SABAH OIL AND
GAS TERMINAL PROJECT
PETRONAS CARIGALI SDN BHD SAW PIPES API 5L B PSL.1 180TONS
MALAYSIA
2012
79 PLANT REJUVENATION & REVAMP 2 PROJECT PETRONAS LATERAL A403 WP304 20TONS
MALAYSIA
2012
80 PENINSULAR GAS UTILIZATION PROJECT PERONAS GAS BERHAD FLANGE, SPACER BLANK A105, A516 GR.70 30TONS
MALAYSIA
2012
81 TOPIS R TOPSIDE EXXON MOBILE EXPLORATION & PRODUCTION MALAYSIA EFW PIPES API 5L X52, A671 GR CC65 360TONS
MALAYSIA
2012
82 BOOSTER COMPERESSION PROJECT CARIGALI HESS OPERATING COMPANY SDN.BHD FITTINGS,FLANGES A182 F51, A420 WPL6 20TONS
MALAYSIA
2012
83 BOOSTER COMPERESSION PROJECT CARIGALI HESS OPERATING COMPANY SDN.BHD FITTINGS,FLANGES, A234 WPB,A420 WL6,A105N,A350 LF2,A516 70,A182 F51 570TONS MALAYSIA 2012
84 BOOSTER COMPERESSION PROJECT CARIGALI HESS OPERATING COMPANY SDN.BHD FORGED FITTINGS,
PADDLE SPACER
A182 F51,A815 S31803,A240 TP316 320TONS
MALAYSIA
2012
85 INDEPENDENT DEEPWATER PETROLEUM TERMINAL AT PENGERANG PENGERANG INDEPENDENT TERMINALS SDN BHD FITTINGS A234 WPB 190TONS
MALAYSIA
2012
86 INDEPENDENT DEEPWATER PETROLEUM TERMINAL AT PENGERANG PENGERANG INDEPENDENT TERMINALS SDN BHD ERW PIPES API 5L GR.B PSL2 3,150TONS
MALAYSIA
2012
87 TOPIS R TOPSIDE EXXON MOBILE EXPLORATION & PRODUCTION MALAYSIA SPECTACLE BLIND FLANGES A516 GR.60, A240 TP316L,
A182 F51
48TONS
MALAYSIA
2012
88 BORF CENTRIFUGAL COMPRESSOR PROJECT MURPHY SARAWAK OIL CO., LTD FORGED FITTINGS,FLANGES A105N,A182 F316L,
A234 WPB
65TONS
MALAYSIA
2012
89 CHANA COMBINED CYCLE POWER
PLANT BLOCK 2
ELECTRICITY GENERATING AUTHORITY OF THAILAND FORGED FITTINGS,FLANGES A694 F65, A182 F316L,
A182 F51
70TONS
MALAYSIA
2012
90 TOPIS R TOPSIDE EXXON MOBILE EXPLORATION & PRODUCTION MALAYSIA FORGED FITTINGS,FLANGES A182 F316L,A105N,
A182 F51
20TONS
MALAYSIA
2012
91 EIP / PSA3 PROJECT THAI OIL PUBLIC COMPANY LIMITED SAW PIPES API 5L B PSL.1 100 TONS
THAILAND
2012
92 OSX 3 FPSO AIBEL LIMITED FITTINGS,FLANGES A105N,A350 LF2,A182 F316L,A403 WP316L 35TONS THAILAND 2012
93 BORF CENTRIFUGAL COMPRESSOR PROJECT MURPHY SARAWAK OIL CO., LTD FITTINGS,FLANGES A403 WP316L,A694 F52 50TONS
MALAYSIA
2012
94 SABAH OIL AND
GAS TERMINAL PROJECT
PETRONAS CARIGALI SDN BHD FITTINGS,FLANGES A350 LF2,A105N,A516 GR70,A403 WP321 80TONS
MALAYSIA
2012
95 WANG NOI CCPP BLOCK 4 ELECTRICITY
GENERATING
AUTHORITY OF THAILAND
FORGED FITTINGS A182 F316L 20TONS THAILAND 2012
96 SABAH OIL AND
GAS TERMINAL PROJECT
PETRONAS CARIGALI
SDN BHD
FITTINGS,FLANGES A350 LF2,A182 F316L, F304L105N,
A516 GR70,A403 WP321
30TONS
MALAYSIA
2012
97 SHELL PROJECT SHELL GLOBAL
SOLUTIONS INTERNATIONAL
FITTINGS,FLANGES,FORGED FITTINGS A105N,A182 F304L,
A283 GR.C,A403 WP304L,
A420 WPL6
45TONS
MALAYSIA
2012
98 OSX 3 FPSO AIBEL LIMITED FITTINGS,FLANGES,FORGED FITTINGS,FLANGOLET A105N,A350 LF2,
A182 F316L,A403 WP316L,
A420 WPL6
55TONS THAILAND 2012
99 BORF CENTRIFUGAL COMPRESSOR PROJECT MURPHY SARAWAK OIL CO., LTD FLANGES A182 F316L,A516 GR.70,
A182 F51,A240 TP316L
,A694 F52,A105N,
A350 LF2
180TONS
MALAYSIA
2012
100 JG SUMMIT PE CAPACITY EXPANSION PROJECT   FITTINGS,FLANGES,FORGED FITTINGS A105,A182 F304,F316L,
A234 WPB,A403 WP304
60TONS PHILIPPINES 2012
101 BORF CENTRIFUGAL COMPRESSOR PROJECT MURPHY SARAWAK OIL CO., LTD FITTINGS A403 WP316L,A815 UNS S31803 90TONS
MALAYSIA
2012
102 BOOSTER COMPERESSION PROJECT CARIGALI HESS OPERATING COMPANY SDN.BHD FITTINGS,FLANGES,
SPECTACLE BLIND,
FLANGOLET
A815 S31803,A182 F51,A240 TP316L 50TONS
MALAYSIA
2012
103 BYPRODUCTS VALUE ADDED PROJECT PTT GLOBAL CHEMICAL PUBLIC COMPANY
LIMITED
SPECTACLE BLIND FLANGES A516 GR.70 25TONS THAILAND 2012
104 SHELL PROJECT SHELL GLOBAL
SOLUTIONS
FITTINGS, FLANGES WP316L,A815 S31803,A182 F51,A105,A316L 90TONS SINGAPORE 2012
105 KAMELIA-A WELLHEAD PLATFORM&
PIPELINE PROJECT
PERUNDING RANHILL WORLEY SDN BHD BLEED RING A182 F51 45TONS
MALAYSIA
2012
106 D12 FIELD DEVELOPMENT SHELL SARAWAK PIPES,FITTINGS,FLANGES SA790 S31803, A815 S31803,
A182 F51,F316L,
A403 WP316L
130TONS
MALAYSIA
2012
107 TOPIS R TOPSIDE EXXONMOBIL EXPLORATION & PRODUCTION MALAYSIA INC FITTINGS A815 S31803 80TONS
MALAYSIA
2012
108 SHELL PROJECT SHELL GLOBAL
SOLUTIONS
PIPES,FITTINGS,FLANGES A790 S31803,WPB,
WPL6,LF2
110TONS SINGAPORE 2012
109 SHELL PROJECT SHELL GLOBAL
SOLUTIONS
FLANGE, FITTING A105,A182 F51,
A516 GR.60,A240 S31803,
A815 31803
200TONS
MALAYSIA
2012
110 SHELL PROJECT SHELL GLOBAL
SOLUTIONS
FLANGES A182 F51,A350 LF2 A182 F316/316L 130TONS
MALAYSIA
2012
111 UNKNOWN ORIGIN ENERGY ORIFICE FLANGE,PLATE A105N, SS316 100TONS
MALAYSIA
2012
112 TOPIS R TOPSIDE EXXONMOBIL EXPLORATION & PRODUCTION
MALAYSIA INC
FLANGES A694 F65,A105N 180TONS
MALAYSIA
2012
113 WANG NOI CCPP BLOCK 4 ELECTRICITY
GENERATING AUTHORITY OF THAILAND
FITTING,FORGED FITTING,
FLANGE
A182 F304L,316L,A105 35TONS THAILAND 2012
114 CHANA COMBINED CYCLE POWER PLANT BLOCK 2/ TRAIN 1&2 ELECTRICITY GENERATING AUTHORITY OF THAILAND FLANGE, FITTING,
FORGED FITTING
A105 GAL,A182 F316L,F304L,A403 WP304L 70TONS
THAILAND
2012
115 MICCO AN PROJECT 200,000 MTPY UNKNOWN FITTINGS A403 WP 304L VIETNAM 2012
116 SHELL PROJECT SHELL GLOBAL
SOLUTIONS
FORGED FITTING A105N,A350 LF2,A182 F304,A182 F316 MALAYSIA 2012
117 SHELL PROJECT SHELL GLOBAL
SOLUTIONS
SPECTACLE BLIND FLANGES A516 GR 70 MALAYSIA 2012
118 SHELL PROJECT SHELL GLOBAL
SOLUTIONS
FLAGES,FTTINGS A350 LF2,A182 F51,A815 S31803 MALAYSIA 2012
119 SABAH OIL AND GAS TERMINAL PROJECT SHELL GLOBAL
SOLUTIONS
FLANGE, FORGED FITTING A105N,A350 LF2,A182 F304,A694 F65 MALAYSIA 2012
120 BORF CENTRIFUGAL COMPRESSOR PROJECT MURPHY SARAWAK OIL CO., LTD FLANGES A105N, A350 LF2, A182 F316/316L,
A516 GR.70N
MALAYSIA 2012
121 UNKNOWN SEMBAWANG SHIPBUILDING SAW PIPE API 5L-B 180TON
SINGAPORE
2012
122 UNKNOWN   SAW PIPE,FITTING API 5L-B/A234WPB 45TON
SINGAPORE
2012
123 UNKNOWN ASTURI METAL BUILDERS(M) SDN.BHD FITTING A403 WP316L MALAYSIA 2012
124 INDONESIAN GAS PRODUCTION FACILITIES DEVELOPMENT PROJECT KALILA (BENTU) LIMITED SMLS PIPE API 5L X52 PSL1 4300TON
INDONESIA
2012
125 UNKNOWN VIETNAM OIL FITTING,FLANGE,SPECTACLE BLIND,SMLS PIPE A182F316L/A403WP316L/
A106-B/A312TP316L
VIETNAM 2012
126 FGRU PROJECT PETRONAS GAS BERHAD SAW/EFW PIPE API 5L-B 130TON
MALAYSIA
2012
127 HSD / HST CHEMICAL & METHANOL INJECTION PUMPS SKID PETROVIETNAM GAS CORPORATION FITTING,FLANGE A182F316/316L VIETNAM 2012
128 WELLHEAD PLATFORM 8 & 9 DEVELOPMENT CARIGALI HESS OPERATING COMPANY FLANGEOLET,BLEEDRING A182F51/S31803 SINGAPORE 2012
129 UNKNOWN QUEENSLAND NITRATES PTY LTD HEAT EXCHANGER TUBE A179 30TON
AUSTRALIA
2012
130 UNKNOWN PT. PROFAB INDONESIA FITTING,FLANGE A182F316/L INDONESIA 2012
131 WORSLEY FACILITIES PROJTECT ENERFLEX PROCESS PTY LTD FORGED FITTING/FLANGE A105N/A350LF2/A694F52 AUSTRALIA 2012
132 THAI NATIONAL POWER 2 SPP POWER PROJECT UNKNOWN FITTING,FLANGE A234WPB/A105N THAILAND 2012
133 PNG LNG EPC4 (FUEL GAS CONDITIONING SYSTEM) UNKNOWN FITTING,FLANGE A182F316L/A105N/A350LF2 SINGAPORE 2012
134 HOPE DOWN'S 4 PROJECT MONADELPHOUS AS2129 FLANGE A105N 20TON
AUSTRALIA
2012
135 MODIFICATION PIPELINE PROJECT PT. PERTAMINA BALONGAN ERW PIPE,FITTING API 5L-B/A234WPB/A105N 60TON
JAKARTA
2012
136 PERTAMINA GAS-PERTAGAS PROJECT PT. WIJAYA KARYA PIPE BEND API 5L-B 30TON
SINGAPORE
2012
137 SBM OSX2 TOP SIDE UNKNOWN FLANGE,FITTING,
FORGED FITTING
A105N/A403-WP316L/A815 S81803/A182F51/A182F53 SINGAPORE 2012
138 CROSS COUNTRY PROJECT PT. PERTAMINA RU IV Cilacap DSAW PIPE API 5L-B PSL1 WITH 3LPP COATING 730TON
INDONESIA
2012
139 BANYU URIP PROJECT MOBIL CEPU INDONESIA SAW PIPE API 5L-B PSL2 SOUR/NON SOUR 320TON
INDONESIA
2012
140 BANYU URIP PROJECT MOBIL CEPU INDONESIA CLAD/SOLID TUBE SHEET SA266Gr.2N+A240TP316L/ SA182F316L INDONESIA 2012
141 BANYU URIP PROJECT MOBIL CEPU INDONESIA CLAD TUBE SHEET SA266Gr.2N+SB-424 UNS N08825 30TON
INDONESIA
2012
142 TYPE E'BOOSTER COMPRESSOR PACKAGE CHEVRON THAILAND EXPLORATION & PRODUCTION LTD SE 2:1 HEADS SA516 GR.70N THAILAND 2012
143 LPG REFRIGERATED STORAGE PETROVIETNAM GAS CORPORATION FITTING,FLANGE,
BOLT/NUT,GASKET
A234WPB/A105N 30TON
VIETNAM
2012
144 MAIBARARA GEOTHERMAL POWER PLANT MAIBARARAGEOTHERMAL, INC SEAMLESS/ERW/LSAW PIPE,FITTING,FLANGE API 5L-B/A234WPB/A105N 190TON
PHILIPPINE
2012
145 HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT PETROVIETNAM TECHNICAL SERVICES FITTING,FLANGE,
FORGED FITTING
A234WPB/A420WPL6/A105/
A182F316L/A403WP304
40TON
VIETNAM
2012
146 MAINTENANCE CONOCO PHILIPS U-TUBE A789 TP31803 50TON
INDONESIA
2012
147 MAINTENANCE CONOCO PHILIPS TUBESHEET,NOZZLE,
FLANGE
SA266 GR 4N/SA105N/SA182F316L 45TON
INDONESIA
2012

2013

No PROJECT CLIENT/CONTRACTOR SUPPLIED ITEM MATERIAL QUANTITY/
COUNTRY
YEAR
1 CONTRACT 68/5437/QR-01/2012
(AL-MOUSEL POWER STATION PROJECT)
SCOP
(STATE COMPANY FOR OIL PROJECT)
SAW PIPE API 5L X60 PSL2 LSAW PIPE
(DEALING IN COMMISSION BASE)
7332TON
IRAQ
2013
2 JG SUMMIT PE CAPACITY EXPANSION PROJECT UNKNOWN FITTINGS,FLANGES A105,A234 WPB,A403 WP304L PHILIPPINES 2013
3 SMPC3 RX PROJECT SIAM MITSUI PTA CO., LTD. (SMPC) FITTINGS,FORGED FITTINGS A105,A182 F304,A182 F316L,A403 WP316L THAILAND 2013
4 SHELL PROJECT SHELL GLOBAL SOLUTIONS FITTINGS,FLANGES A105N,A350 LF2,A182 F51,A182 F316L,A815 S31803 MALAYSIA 2013
5 JG SUMMIT PE CAPACITY EXPANSION PROJECT UNKNOWN BEND A312 TP304 BEND PHILIPPINES 2013
6 SBM PRODUCTION CONTRACTORS SIAKAP NORTH-PETAI DEVELOPMENT EPCIC FITTING,FLANGE,BEND,FORGED FITTING A815 S31803,A403 WP316L,A105N,A182 F53,A182 F316L,A106 GR.B, MALAYSIA 2013
7 SBM PRODUCTION CONTRACTORS SIAKAP NORTH-PETAI DEVELOPMENT EPCIC FITTING,FLANGE,FORGED FITTING A694 F60,A240 GR.316,A516 GR.70,A403 WP316L,A105N,A694 F52,182 F316 MALAYSIA 2013
8 SBM PRODUCTION CONTRACTORS SIAKAP NORTH-PETAI DEVELOPMENT EPCIC FLANGE A/SA105N,A182 F316/316L,A350 LF2,A516 GR70N MALAYSIA 2013
9 JG SUMMIT PE CAPACITY EXPANSION PROJECT UNKNOWN FLANGE,FORGED FITTING A105,A182 F316L,A182 F304/L THAILAND 2013
10 ETHANOL PROJECT UNKNOWN FLANGES A105 THAILAND 2013
11 SMPC3 RX PROJECT SIAM MITSUI PTA CO., LTD. (SMPC) EFW PIPES A312 TP316L THAILAND 2013
12 TOYOBO VYLON PROJECT TOYO-THAI CORPORATION PUBLIC CO., LTD FLANGES A182 F304 THAILAND 2013
13 BOOSTER COMPERESSION PROJECT CARIGALI HESS OPERATING COMPANY SDN.BHD FLANGES A182 F51,A350 LF2 MALAYSIA 2013
14 Design & Supply of Gas & Condensate Metering System for D12, Laila, F14,F29 Project SHELL SARAWAK BERHAD PIPES A790/A928 S31803 PIPES SINGAPORE 2013
15 PCEMSB-BOILER FEED WATER COOLER PETRONAS CHEMICAL ETHYLENE MALAYSIA SDN BHD BAFFLE PLATE A36 MALAYSIA 2013
16 MICCO AN PROJECT UNKNOWN FITTINGS,FORGED FITTINGS A420 WPL6,F304L,105 THAILAND 2013
17 SHELL PROJECT SHELL GLOBAL SOLUTIONS FITTINGS A420 WPL6 SOUR MALAYSIA 2013
18 JG SUMMIT PE CAPACITY EXPANSION PROJECT UNKNOWN FORGED FITTINGS A105 THAILAND 2013
19 SHELL PROJECT SHELL GLOBAL SOLUTIONS FLANGES A182 F51 MALAYSIA 2013
20 BOOSTER COMPERESSION PROJECT CARIGALI HESS OPERATING COMPANY SDN.BHD FLANGES, FLANGOLET A240 UNS S31803,A182 F316L,A182 F51 MALAYSIA 2013
21 SBM PRODUCTION CONTRACTORS SIAKAP NORTH-PETAI DEVELOPMENT EPCIC FITTING,FLANGE,FORGED FITTING A403 WP316L,A815 S31803,A182 WP316L,A350 LF2,A694 F52,A105N,A182 F53,A694 F60 MALAYSIA 2013
22 SHELL PROJECT SHELL GLOBAL SOLUTIONS FITTINGS A403 WP316L,A815 S31803, A694 F65 MALAYSIA 2013
23 TURKMENISTAN BLOCK 1 PROJECT PETRONAS CARIGALI SDN. BHD FLANGES,FITTINGS A815 UNS S31803,A182 F51 MALAYSIA 2013
24 SHELL PROJECT SHELL GLOBAL SOLUTIONS FLANGE, FITTING A403 WP316L,A815 S31803,A182 F51, A350 LF2,A105N MALAYSIA 2013
25 JG SUMMIT PE CAPACITY EXPANSION PROJECT UNKNOWN FITTINGS A234 WPB,A403 WP304L THAILAND 2013
26 FOSTER SPRC PROJECT UNKNOWN VALVE A217 C5, A351 CF8C THAILAND 2013
27 SBM PRODUCTION CONTRACTORS SIAKAP NORTH-PETAI DEVELOPMENT EPCIC FITTING,FLANGE A815 S32750,A105,A240 GR316,A694 F52,A182 F316L MALAYSIA 2013
28 TAPIS PROJECT EXXONMOBIL EXPLORATION & PRODUCTION MALAYSIA FITTINGS A815 UNS S31803, A815 S32760 MALAYSIA 2013
29 SBM PRODUCTION CONTRACTORS SIAKAP NORTH-PETAI DEVELOPMENT EPCIC FITTING,FLANGE A815 S31803,A403 WP316LA105N, A350 LF2,A240 S32750,A694 F52,182 F51 MALAYSIA 2013
30 TAPIS PROJECT EXXONMOBIL EXPLORATION & PRODUCTION MALAYSIA FITTINGS A403 WP316L MALAYSIA 2013
31 GAS PIPELINE AND GAS METERING AND REGULATING STATION PROJECT SIAMRAJATHANEE JOINT VENTURE FORGED FITTINGS A105, A106 B THAILAND 2013
32 UNKNOWN PETRONAS FLANGES, FORGED FITTIGNS A182 F51, A240 S318103 MALAYSIA 2013
33 THE EPC SERVICES FOR PIPING AND E&I CABLE REROUTE PROJECT PTT PUBLIC CO., LTD 3LPE SMLS, ERW PIPE/FITTING,FORGED FITTING API 5L B,A106 GR.B,A333 GR.6,A234 WPB,A420 WPL6,A105 THAILAND 2013
34 OGT PTSM 184 PROJECT UNKNOWN FITTINGS, FLANGES A350 LF2, A105N MALAYSIA 2013
35 TALISMAN PROJECT TALISMAN FITTINGS, FLANGES A815 UNS S32750, A182 F53 MALAYSIA 2013
36 F14-DRA PROJECT SHELL GLOBAL SOLUTIONS FLANGE, FITTING A403 WP316L,A182 F316/316L, A350 LF2, A420 WPL6 MALAYSIA 2013
37 SHELL PROJECT SHELL GLOBAL SOLUTIONS FLANGE, FITTING A182 F316,A694 F65,A182 F51, A350 LF2, A420 WPL6 MALAYSIA 2013
38 DPCU-2 PROJECT PETRONAS GAS SDN BHD FLANGES A105 BLANK, SPACER MALAYSIA 2013
39 ZUHAL EAST DEVEPROJECT PETRONAS CARIGALI SDN. BHD BLEED RING,SPECTACLE BL A105N, A516 GR.60 MALAYSIA 2013
40 CHESS-BULAN-C PROJECT THAI NIPPON STEEL&SUMIKIN ENGINEERING&CONSTRUCTION FORGED FITTINGS A105N, A350 LF2 THAILAND 2013
41 JKC ICHTHYS PROJECT JKC AUSTRALIA LNG PTY LTD FORGED FITTINGS,FLANGES A105 THAILAND 2013
42 PCML-NEW-MAINTENANCE SERVICE CONTRACT THAI NIPPON STEEL&SUMIKIN ENGINEERING&CONSTRUCTION PIPE,FITING,FLANGE,FORGED FITTING A928 S31803,A182 F316L,F51,A403 WP316L THAILAND 2013
43 ARUN LNG RECEIVING HUB & REGASIFICATION TERMINAL PT PERTAMINA FITTING, FORGED FITTING A182 F304, A403 WP304 INDONESIA 2013
44 BULAN C WELLHEAD PLATFORM GAS DEVELOPMENT CARIGALI HESS OPERATING COMPANY SDN.BHD FLANGES A182 F51, A350 LF2, A105, A516 GR.70 MALAYSIA 2013
45 THE EPC SERVICES FOR PIPING AND E&I CABLE REROUTE PROJECT PTT PUBLIC CO., LTD FLANGES A105 THAILAND 2013
46 SBM PRODUCTION CONTRACTORS SIAKAP NORTH-PETAI DEVELOPMENT EPCIC FLANGE A694 F52 MALAYSIA 2013
47 NONE PTT THAILAND 2:1 HEAD SA516-GR.70N TAIILAND 2013
48 NONE PT. PERTAMINA PATRA NIAGA ERW PIPE API 5L-B JAKARTA 2013
49 NONE SOUTHWEST FILTERS FLANGE SA350 LF2 CL.1 USA 2013
50 NONE CURTIS KELLY Q-LIP FORGING/FLANGE SA350 LF2 CL.1/A182F304L USA 2013
51 CROSS COUNTRY PIPELINE PROJECT PERTAMINA RU IV-CILACAP HOT INDUCTION BEND A106GR.B JAKARTA 2013
52 BARU NIRU PROJECT KRAKATAU ENGINEERING FITTING,FLANGE A234WPB,A105 JAKARTA 2013
53 BP MINI LNG TANGGUH PROJECT JGC INDONESIA EFW PIPE A358 TP304CL1 JAKARTA 2013
54 BANYU URIP PROJECT MOBIL CEPU LTD. NOZZLE FORGING /FLANGE SA105N/ASA350LF2CL.1 JAKARTA 2013
55 BANYU URIP PROJECT MOBIL CEPU LTD. SAW PIPE API5LGR.B PSL2 (SOUR/NON-SOUR) JAKARTA 2013
56 SENORO GAS DEVELOPMENT PROJECT PERTAMINA MEDCO E&P TOMORI SULAWESI NOZZLE FORGING SA105N/ASA350LF2CL.1 JAKARTA 2013
57 SENORO GAS DEVELOPMENT PROJECT PERTAMINA MEDCO E&P TOMORI SULAWESI SAW PIPE API5LGR.B PSL2 (SOUR/NON-SOUR) JAKARTA 2013
58 M.H.I TAIWAN LIN KOU TUBESHEET SA266GR.2 TAIWAN 2013
59 AI-MOUSEL POWER
STATION PROJECT
S.C.O.P COATED HOT
INDUCTION BEND
API 5L X60 PSL2 300 TONS
IRAQ
2013
60 TAJI-NINAWA POWER
STATION PROJECT
S.C.O.P COATED HOT
INDUCTION BEND
API 5L X60 PSL2 200 TONS
IRAQ
2013
61 NONE THAI NIPPON STEEL&SUMIKIN ENGINEERING&CONSTRUCTION FLANGE A182 F51 THAILAND 2013
62 MHI/GUT PROJECT NONE FITTING,FORGED FITTING,PIPE A105, A182 F304,A182 F316,A312 TP316 THAILAND 2013
63 FLOWLINE OIL&GAS NONE FITTING A815 UNS S32750 MALAYSIA 2013
64 EPCIC OF JDA GAS BALANCING EVACUATION PROJECT TRANS THAI MALAYSIA FLANGES A350 LF2, A516 GR.70 MALAYSIA 2013
65 BUTADIENE TRANSFER LINE FROM T-3 TO R1 TITAN PETCHEM PASIR GUDANG HDPE PU FORM,3LPE COATING PIPE SMLS A333 GR.6 MALAYSIA 2013
66 POLYBUTYLENE SUCCINATE PLANT PROJECT PTT MCC BIOCHEM BEND A53 GR.B THAILAND 2013

2014

No PROJECT CLIENT/CONTRACTOR PRODUCT MATERIAL QUANTITY/
COUNTRY
YEAR
1 PCD -II PROJECT UBE GROUP(THAILAND) JACKETED FLANGE 2019
2 JG SUMMIT PE CAPACITY EXPANSION PROJECT UNKNOWN FITTINGS,FLANGES A105,A234 WPB,A403 WP304L PHILIPPINES 2013
3 SMPC3 RX PROJECT SIAM MITSUI PTA CO., LTD. (SMPC) FITTINGS,FORGED FITTINGS A105,A182 F304,A182 F316L,A403 WP316L THAILAND 2013
4 SHELL PROJECT SHELL GLOBAL SOLUTIONS FITTINGS,FLANGES A105N,A350 LF2,A182 F51,A182 F316L,A815 S31803 MALAYSIA 2013
5 JG SUMMIT PE CAPACITY EXPANSION PROJECT UNKNOWN BEND A312 TP304 BEND PHILIPPINES 2013
6 SBM PRODUCTION CONTRACTORS SIAKAP NORTH-PETAI DEVELOPMENT EPCIC FITTING,FLANGE,BEND,FORGED FITTING A815 S31803,A403 WP316L,A105N,A182 F53,A182 F316L,A106 GR.B, MALAYSIA 2013
7 SBM PRODUCTION CONTRACTORS SIAKAP NORTH-PETAI DEVELOPMENT EPCIC FITTING,FLANGE,FORGED FITTING A694 F60,A240 GR.316,A516 GR.70,A403 WP316L,A105N,A694 F52,182 F316 MALAYSIA 2013
8 SBM PRODUCTION CONTRACTORS SIAKAP NORTH-PETAI DEVELOPMENT EPCIC FLANGE A/SA105N,A182 F316/316L,A350 LF2,A516 GR70N MALAYSIA 2013
9 JG SUMMIT PE CAPACITY EXPANSION PROJECT UNKNOWN FLANGE,FORGED FITTING A105,A182 F316L,A182 F304/L THAILAND 2013
10 ETHANOL PROJECT UNKNOWN FLANGES A105 THAILAND 2013
11 SMPC3 RX PROJECT SIAM MITSUI PTA CO., LTD. (SMPC) EFW PIPES A312 TP316L THAILAND 2013
12 TOYOBO VYLON PROJECT TOYO-THAI CORPORATION PUBLIC CO., LTD FLANGES A182 F304 THAILAND 2013
13 BOOSTER COMPERESSION PROJECT CARIGALI HESS OPERATING COMPANY SDN.BHD FLANGES A182 F51,A350 LF2 MALAYSIA 2013
14 Design & Supply of Gas & Condensate Metering System for D12, Laila, F14,F29 Project SHELL SARAWAK BERHAD PIPES A790/A928 S31803 PIPES SINGAPORE 2013
15 PCEMSB-BOILER FEED WATER COOLER PETRONAS CHEMICAL ETHYLENE MALAYSIA SDN BHD BAFFLE PLATE A36 MALAYSIA 2013
16 MICCO AN PROJECT UNKNOWN FITTINGS,FORGED FITTINGS A420 WPL6,F304L,105 THAILAND 2013
17 SHELL PROJECT SHELL GLOBAL SOLUTIONS FITTINGS A420 WPL6 SOUR MALAYSIA 2013
18 JG SUMMIT PE CAPACITY EXPANSION PROJECT UNKNOWN FORGED FITTINGS A105 THAILAND 2013
19 SHELL PROJECT SHELL GLOBAL SOLUTIONS FLANGES A182 F51 MALAYSIA 2013
20 BOOSTER COMPERESSION PROJECT CARIGALI HESS OPERATING COMPANY SDN.BHD FLANGES, FLANGOLET A240 UNS S31803,A182 F316L,A182 F51 MALAYSIA 2013
21 SBM PRODUCTION CONTRACTORS SIAKAP NORTH-PETAI DEVELOPMENT EPCIC FITTING,FLANGE,FORGED FITTING A403 WP316L,A815 S31803,A182 WP316L,A350 LF2,A694 F52,A105N,A182 F53,A694 F60 MALAYSIA 2013
22 SHELL PROJECT SHELL GLOBAL SOLUTIONS FITTINGS A403 WP316L,A815 S31803, A694 F65 MALAYSIA 2013
23 TURKMENISTAN BLOCK 1 PROJECT PETRONAS CARIGALI SDN. BHD FLANGES,FITTINGS A815 UNS S31803,A182 F51 MALAYSIA 2013
24 SHELL PROJECT SHELL GLOBAL SOLUTIONS FLANGE, FITTING A403 WP316L,A815 S31803,A182 F51, A350 LF2,A105N MALAYSIA 2013
25 JG SUMMIT PE CAPACITY EXPANSION PROJECT UNKNOWN FITTINGS A234 WPB,A403 WP304L THAILAND 2013
26 FOSTER SPRC PROJECT UNKNOWN VALVE A217 C5, A351 CF8C THAILAND 2013
27 SBM PRODUCTION CONTRACTORS SIAKAP NORTH-PETAI DEVELOPMENT EPCIC FITTING,FLANGE A815 S32750,A105,A240 GR316,A694 F52,A182 F316L MALAYSIA 2013
28 TAPIS PROJECT EXXONMOBIL EXPLORATION & PRODUCTION MALAYSIA FITTINGS A815 UNS S31803, A815 S32760 MALAYSIA 2013
29 SBM PRODUCTION CONTRACTORS SIAKAP NORTH-PETAI DEVELOPMENT EPCIC FITTING,FLANGE A815 S31803,A403 WP316LA105N, A350 LF2,A240 S32750,A694 F52,182 F51 MALAYSIA 2013
30 TAPIS PROJECT EXXONMOBIL EXPLORATION & PRODUCTION MALAYSIA FITTINGS A403 WP316L MALAYSIA 2013
31 GAS PIPELINE AND GAS METERING AND REGULATING STATION PROJECT SIAMRAJATHANEE JOINT VENTURE FORGED FITTINGS A105, A106 B THAILAND 2013
32 UNKNOWN PETRONAS FLANGES, FORGED FITTIGNS A182 F51, A240 S318103 MALAYSIA 2013
33 THE EPC SERVICES FOR PIPING AND E&I CABLE REROUTE PROJECT PTT PUBLIC CO., LTD 3LPE SMLS, ERW PIPE/FITTING,FORGED FITTING API 5L B,A106 GR.B,A333 GR.6,A234 WPB,A420 WPL6,A105 THAILAND 2013
34 OGT PTSM 184 PROJECT UNKNOWN FITTINGS, FLANGES A350 LF2, A105N MALAYSIA 2013
35 TALISMAN PROJECT TALISMAN FITTINGS, FLANGES A815 UNS S32750, A182 F53 MALAYSIA 2013
36 F14-DRA PROJECT SHELL GLOBAL SOLUTIONS FLANGE, FITTING A403 WP316L,A182 F316/316L, A350 LF2, A420 WPL6 MALAYSIA 2013
37 SHELL PROJECT SHELL GLOBAL SOLUTIONS FLANGE, FITTING A182 F316,A694 F65,A182 F51, A350 LF2, A420 WPL6 MALAYSIA 2013
38 DPCU-2 PROJECT PETRONAS GAS SDN BHD FLANGES A105 BLANK, SPACER MALAYSIA 2013
39 ZUHAL EAST DEVEPROJECT PETRONAS CARIGALI SDN. BHD BLEED RING,SPECTACLE BL A105N, A516 GR.60 MALAYSIA 2013
40 CHESS-BULAN-C PROJECT THAI NIPPON STEEL&SUMIKIN ENGINEERING&CONSTRUCTION FORGED FITTINGS A105N, A350 LF2 THAILAND 2013
41 JKC ICHTHYS PROJECT JKC AUSTRALIA LNG PTY LTD FORGED FITTINGS,FLANGES A105 THAILAND 2013
42 PCML-NEW-MAINTENANCE SERVICE CONTRACT THAI NIPPON STEEL&SUMIKIN ENGINEERING&CONSTRUCTION PIPE,FITING,FLANGE,FORGED FITTING A928 S31803,A182 F316L,F51,A403 WP316L THAILAND 2013
43 ARUN LNG RECEIVING HUB & REGASIFICATION TERMINAL PT PERTAMINA FITTING, FORGED FITTING A182 F304, A403 WP304 INDONESIA 2013
44 BULAN C WELLHEAD PLATFORM GAS DEVELOPMENT CARIGALI HESS OPERATING COMPANY SDN.BHD FLANGES A182 F51, A350 LF2, A105, A516 GR.70 MALAYSIA 2013
45 THE EPC SERVICES FOR PIPING AND E&I CABLE REROUTE PROJECT PTT PUBLIC CO., LTD FLANGES A105 THAILAND 2013
46 SBM PRODUCTION CONTRACTORS SIAKAP NORTH-PETAI DEVELOPMENT EPCIC FLANGE A694 F52 MALAYSIA 2013
47 NONE PTT THAILAND 2:1 HEAD SA516-GR.70N TAIILAND 2013
48 NONE PT. PERTAMINA PATRA NIAGA ERW PIPE API 5L-B JAKARTA 2013
49 NONE SOUTHWEST FILTERS FLANGE SA350 LF2 CL.1 USA 2013
50 NONE CURTIS KELLY Q-LIP FORGING/FLANGE SA350 LF2 CL.1/A182F304L USA 2013
51 CROSS COUNTRY PIPELINE PROJECT PERTAMINA RU IV-CILACAP HOT INDUCTION BEND A106GR.B JAKARTA 2013
52 BARU NIRU PROJECT KRAKATAU ENGINEERING FITTING,FLANGE A234WPB,A105 JAKARTA 2013
53 BP MINI LNG TANGGUH PROJECT JGC INDONESIA EFW PIPE A358 TP304CL1 JAKARTA 2013
54 BANYU URIP PROJECT MOBIL CEPU LTD. NOZZLE FORGING /FLANGE SA105N/ASA350LF2CL.1 JAKARTA 2013
55 BANYU URIP PROJECT MOBIL CEPU LTD. SAW PIPE API5LGR.B PSL2 (SOUR/NON-SOUR) JAKARTA 2013
56 SENORO GAS DEVELOPMENT PROJECT PERTAMINA MEDCO E&P TOMORI SULAWESI NOZZLE FORGING SA105N/ASA350LF2CL.1 JAKARTA 2013
57 SENORO GAS DEVELOPMENT PROJECT PERTAMINA MEDCO E&P TOMORI SULAWESI SAW PIPE API5LGR.B PSL2 (SOUR/NON-SOUR) JAKARTA 2013
58 M.H.I TAIWAN LIN KOU TUBESHEET SA266GR.2 TAIWAN 2013
59 AI-MOUSEL POWER
STATION PROJECT
S.C.O.P COATED HOT
INDUCTION BEND
API 5L X60 PSL2 300 TONS
IRAQ
2013
60 TAJI-NINAWA POWER
STATION PROJECT
S.C.O.P COATED HOT
INDUCTION BEND
API 5L X60 PSL2 200 TONS
IRAQ
2013
61 NONE THAI NIPPON STEEL&SUMIKIN ENGINEERING&CONSTRUCTION FLANGE A182 F51 THAILAND 2013
62 MHI/GUT PROJECT NONE FITTING,FORGED FITTING,PIPE A105, A182 F304,A182 F316,A312 TP316 THAILAND 2013
63 FLOWLINE OIL&GAS NONE FITTING A815 UNS S32750 MALAYSIA 2013
64 EPCIC OF JDA GAS BALANCING EVACUATION PROJECT TRANS THAI MALAYSIA FLANGES A350 LF2, A516 GR.70 MALAYSIA 2013
65 BUTADIENE TRANSFER LINE FROM T-3 TO R1 TITAN PETCHEM PASIR GUDANG HDPE PU FORM,3LPE COATING PIPE SMLS A333 GR.6 MALAYSIA 2013
66 POLYBUTYLENE SUCCINATE PLANT PROJECT PTT MCC BIOCHEM BEND A53 GR.B THAILAND 2013