No | PROJECT | CLIENT/CONTRACTOR | SUPPLIED ITEM | MATERIAL | QUANTITY/ COUNTRY |
YEAR |
377 | KASHAGAN FIELD DEVELOPMENT PROJECT | AGIP KCO | SOUR/NON SOUR PIPE | A671 CC60 CL.22 | 1000TON KAZAKHSTAN |
2008 |
378 | OXY MUKHAIZNA CPFS PROJECT | DOSAL CO. | WELDED PIPE | A672 CL12 C65 | 1400TON OMAN |
2008 |
379 | SAUDI KAYAN OLEFINS PROJECT | SAUDI KAYAN PETROCHEMICAL COMPANY | FLANGE | A105/A182F11 | 50TON SAUDI ARABIA |
2008 |
380 | CHILLER PETROKIMIA PROJECT | PT. PAL INDONESIA | U-TUBE | A179 | 10TON INDONESIA |
2008 |
381 | FLAMANVILLE & HAZELWOOD PROJECT | PT. PAL INDONESIA | PLATE | SA516-60N | 140TON INDONESIA |
2008 |
382 | OYONG PROJECT PHASE 2 | PT. PAL INDONESIA | PIPE | A106-B | 250TON INDONESIA |
2008 |
383 | OYONG PROJECT | SANTOS(SAMPANG)PTY.LTD | FITTING,TUBE | A234 WPB/A105 | 40TON INDONESIA |
2008 |
384 | FPSO CONVERSION PROJECT | FLANGE | A182 F316 | 50TON SINGAPORE |
2008 | |
385 | PNOC OILFIELD DEVELOPMENT | PNOC | PIPE | API 5L-B | 3700TON PHILIPPINE |
2008 |
386 | JAMBI MERANG DEVELOPMENT PROJECT | PERTAMINA-HESS JAMBI MERANG | FITTING | A234 WPB/A403 WP304 | 400TON INDONESIA |
2008 |
387 | MARAFIQ DESALINATION PLANT PROJECT | PIPE | A672 B60 CL.22 | 132TON SINGAPORE |
2008 | |
388 | BOJONEGARA STATION PROJECT | PT.PERUSAHAAN GAS NEGARA | PIPE | API 5L-B | 13TON SINGAPORE |
2008 |
389 | JABUNG GAS BOOSTER STATION PROJECT | PT. TRANSPORTASI GAS INDONESIA | PIPE | API 5L-B | 300TON INDONESIA |
2008 |
390 | FUJAIRAH REFINERY PROJECT | FUJAIRAH REFINERY CO. LTD | 3D BEND | A234 WPB | 70TON U.A.E |
2008 |
391 | FATIMA FERTILIZER PROJECT | FATIMA FERTILIZER COMPANY | PIPE | A139-B | 25TON JAPAN |
2008 |
392 | QUEENSLAND WATER PROJECT | TRANSARLE PTY LIMITED | FLANGE | A105N | 20TON AUSTRALIA |
2008 |
393 | PETRONET LNG AHEJ EXPANSION PROJECT | TOYO ENGINEERING CORPORATION | FITTING | A403WP304 | 21TON INDIA |
2008 |
394 | PANGKAH LIQUID DEVELOPMENT PROJECT (UPD PROJECT) | HESS(INDONESIA-PANGKAH) LIMITED, PT.TRIPATRA | SPEC BLIND&SPACER | A285 GR.C/A403 | 200TON INDONESIA |
2008 |
395 | SIDI KRIR SIMPLE CYCLE PROJECT | WEST DELTA ELECTRICITY PRODUCTION COMPANY | PIPE/FITTING/FLANGE | A106 GR.B/A105 | 250TON EGYPT |
2008 |
396 | EL ATF SIMPLE CYCLE PROJECT | MIDDLE DELTA ELECTRICITY PRODUCTION COMPANY | PIPE/FITTING/FLANGE | A106 GR.B/A105 | 250TON EGYPT |
2008 |
397 | DBNGP STAGE 5A EXPANSION PROJECT |
DBNGP(WA) NOMINESS P/L | FLANGE | A105N/A694F52 | 50TON AUSTRALIA |
2008 |
398 | CONDAMINE PROJECT | VISAVAKIT PATANA CORP.LTD | PIPE/FITTING | A106 GR-B/WPB | 121TON THAILAND |
2008 |
399 | MOC PROJECT | MAP TA PHUT OLEFINS | FITTING/FLANGE/BOLTNUT | A403 WP304/A106-B | 650TON THAILAND |
2008 |
400 | WORSLEY MULTI-FUEL COGEN PROJECT |
PROPERTY OF AUSTRAIN ENERGY | FITTING/PIPE/PLATE | SA234 WPC | 130TON THAILAND |
2008 |
401 | SINO IRON PROJECT | PROPERTY OF AUSTRAIN ENERGY | FITTING/FORGING | A105/A182 F22 | 20TON THAILAND |
2008 |
402 | HEAT EXCHANGER PRESSURE VESSEL |
KURTIS KELLY | FLANGE | SA182 F304/304L | 55TON USA |
2008 |
403 | POWER PROJECT | BRUNEI LNG SDN BHD | FLANGE | A182 F11 | 15TON BRUNEI |
2008 |
404 | JAMNAGAR EXTENSIOIN PROJECT | EMERSON PROCESS MANAGEMENT | PIPE/FITTING/FLANGE | A671 CB60 CL13 | 20TON SINGAPORE |
2008 |
405 | RELIANCE EWPP 3 GAS METERING PROJECT |
EMERSON PROCESS MANAGEMENT | FLANGE | A694 F52 | 11TON SINGAPORE |
2008 |
406 | UJUNG PANGKAH PROJECT |
EMERSON PROCESS | FLANGE | A105 | 15TON SINGAPORE |
2008 |
407 | REFINERY METERING PROJECT |
EMERSON PROCESS | FLANGE | A350 LF2 | 11TON SINGAPORE |
2008 |
408 | RELIANCE EWPP 4 METERING PROJECT |
EMERSON PROCESS | PIPE/FITTING/FLANGE | A106-B/WPB/A105N | 25TON SINGAPORE |
2008 |
409 | BGME PROJECT | MANAGEMENT COMPANY | HOT INDUCTION BEND | API 5L-B | 23TON SINGAPORE |
2008 |
410 | RABIGH DEVELOPMENT PROJECT | MITSUI ENGINEERING | FLANGE | A105/A182 F11 | 24TON SAUDI ARABIA |
2008 |
411 | RABIGH DEVELOPMENT PROJECT |
SUMITOMO CHEMICAL | FITTING/FORGED FITTING | A105/LF2/F11 | 10TON SAUDI ARABIA |
2008 |
412 | COOGEE RESOURCES MONTARA PROJECT |
CLOUGH(THAILAND) | FITTING/FLANGE | A182 F51/A350 LF2 | 13TON THAILAND |
2008 |
413 | NDD-12 PROJECT | CHEVRON INDONESIA | FITTING | A234 WPB | 15TON INDONESIA |
2008 |
414 | KRAKATAU PROJECT | KRAKATAU ENGINEERING | HOT INDUCTION BEND | A53-B/A312 TP304L | 70TON INDONESIA |
2008 |
415 | SCG INTERCONNECTION PIPELINES PROJECT |
MAP TA PHUT OLEFINS CO., LTD | FITTING | A234 WPB | 20 TON THAILAND |
2008 |
416 | NORTHERN FIELDS DEVELOPMENT PROJECT | TAILSMAN MALAYSIA COMPANY/SIME DARBY ENGINEERING | FORGED FITTING,FITTING | A105N/A403 WP316L | 20TON SINGAPORE |
2008 |
417 | PTTPE LDPE PLANT PROJECT | PTT POLYETHYLENE COMPANY | FITTING | A304 WP304/A234 WPB | 58TON THAILAND |
2008 |
418 | PPCL BPA PROJECT | PTT PHENOLCOMPANY | FLANGE | A105-GAL/A105 | 10TON THAILAND |
2008 |
419 | PTTPE LDPE PLANT PROJECT | PTT POLYETHYLENE COMPANY | FITTING | A234 WPB | 10TON THAILAND |
2008 |
420 | PPCL BPA PROJECT | PTT PHENOLCOMPANY | FITTING/FLANGE | A234 WPB/A105 | 250TON THAILAND |
2008 |
421 | MMA NO.2 PROJECT | THAI MMA COMPANY LTD | FITTING | A403 WP304 | 15TON THAILAND |
2008 |
422 | PPCL BPA PROJECT | PTT POLYETHYLENE COMPANY | FITTING | A403 WP304 | 20TON THAILAND |
2008 |
423 | PTTPE LDPE PLANT PROJECT | PTT POLYETHYLENE COMPANY | FLANGE | A182 F304 | 10TON THAILAND |
2008 |
424 | PIPELINE PROJECT | HUP STEEL LTD | 3D BEND | API 5L X42 | 17TON THAILAND |
2008 |
425 | JDA BLOCK B 17 DEVELOPMENT | JUTASAMA | FLANGE | SA105N/F316L | 15TON MALAYSIA |
2008 |
426 | JDA BLOCK B 17 DEVELOPMENT | JUTASAMA | FORGING | SA105N/F316L | 11TON MALAYSIA |
2008 |
427 | STEAM DRUM | JUTASAMA | NOZZLE | SA266 GR.2 | 10TON MALAYSIA |
2008 |
428 | C208 DUMAI | JUTASAMA | FLANGE | A105N/A266 CL.4 | 15TON MALAYSIA |
2008 |
429 | 400 KTA HDPE UNIT | YANBU NATIONAL PETROCHEMICAL CO. | BOLT&NUT | A307 GR.B/B7 2H | 15TON DUBAI |
2008 |
430 | 400 KTA HDPE UNIT | YANBU NATIONAL PETROCHEMICAL CO. | BOLT&NUT | A307 GR.B/B7/L7 B8 | 19TON DUBAI |
2008 |
431 | E&PM PROJECT | JUBAIL INDUSTRIAL CITY,K.S.A | FLANGE | A516 GR.70/F304/LF2 | 20TON DUBAI |
2008 |
432 | MOC CRACKER PROJECT | SIAM CEMENT GROUP | FLANGE/FIG-8 BLANK | A105-GAL/A182 F304 | 30TON THAILAND |
2008 |
433 | MOC CRACKER PROJECT | SIAM CEMENT GROUP | FLANGE/SPACER&BLANK | A105-GAL/A182 F304 | 90TON THAILAND |
2008 |
434 | RAYONG OLEFINS PROJECT | RAYONG OLEFINS CO./TOYO ENGINEERING | FITTING | A234 WPB | 15TON THAILAND |
2008 |
435 | SHELL GLOBAL SOLUTION | SHELL MALAYSIA | FITTING | UNS31803 | 20TON MALAYSIA |
2008 |
436 | SHELL GLOBAL SOLUTION | SHELL MALAYSIA | FLANGE | A350 LF2/A105N/A182 F51 | 40TON MALAYSIA |
2008 |
437 | PETRONAS METHANOL AIR SEPARATION PLANT PROJECT | FLANGE | A105N | 10TON MALAYSIA |
2008 | |
438 | MOQ16 | MAERSK OIL QATAR | FITTING | A403 WP316L | 10TON MALAYSIA |
2008 |
439 | MOQ16 | MAERSK OIL QATAR | FITTING/FORGED FITTING | A234 WPL6/A350 LF2 | 30TON MALAYSIA |
2008 |
440 | MOQ16 | MAERSK OIL QATAR | FLANGE | A350 LF2 | 15TON MALAYSIA |
2008 |
441 | KUMANG CLUSTER DEVELOPMENT PROJECT | PETRONAS CARIGALI SDN BHD | FLANGE/ FITTING | A516 GR.60/A240 UNS S31803/TP316/WP316L | 11TON MALAYSIA |
2008 |
442 | HO CHI MINH PROJECT | HO CHI MINH GAS PIPELINE | FLANGE | A694 F52 | 10TON VIETNAM |
2008 |
443 | MAERSK OIL QATAR BE&BG PLATFORM | MAERSK OIL QATAR | FITTING | A403 WP316L | 20TON MALAYSIA |
2008 |
444 | SAUDI KAYAN PROJECT | DAYIM PUNJ LLOYD CONSTUCTION CONTRACTING CO., LTD | PIPE | A312 TP304L | 100TON SAUDI ARABIA |
2008 |
445 | MARAFIQ DESALINATION PLANT PROJECT | SIDEM SAUDI LTD KSA | PIPE | API 5L GR.B | 1600TON SAUDI ARABIA |
2008 |
446 | MARAFIQ DESALINATION PLANT PROJECT | SIDEM SAUDI LTD KSA | FITTING(INTERNAL/EXTERNAL COATING) | A234 WPB | 900TON SAUDI ARABIA |
2008 |
447 | FISIA FOR RAS ABU FONTAS PROJECT | ALLIED INTERNATIONAL SRL LOC. | ERW/SAW PIPE | API 5L GR.B | 900TON QATAR |
2008 |
448 | SAUDI KAYAN PETROCHEMICAL COMPLEX (HDPE) PROJECT | SAUDI KAYAN /HQCEC | 3 LAYER POLYPROPELENE COATING PIPE | A671 CC60/A106-B | 90TON/ SAUDI ARABIA |
2008 |
449 | NORTHERN FIELDS BUNGA ORKID DEVELOPMENT PROJECT | AKER KAERNER/SIME DARBY | SAW PIPE | API 5L GR.B | 300TON MALAYSIA |
2008 |
450 | PSR2 REVEMP PROJECT | FOOSTER WHEELER | SAW PIPE | API 5L GR.B | 250TON MALAYSIA |
2008 |
451 | MELAKA REFINERY PSR2 REVAMP PROJECT | MALAYSIAN REFINING COMPANY | WELDED ERW PIPE | A672 GR.60/API 5L GR.B | 1000TON MALAYSIA |
2008 |
No | PROJECT | CLIENT/CONTRACTOR | SUPPLIED ITEM | MATERIAL | QUANTITY/ COUNTRY |
YEAR |
299 | RABIGH PC2 PROJECT | MITSUI ENGINEERING & SHIPBUILDING CO.,LTD |
FITTING | A234 WPB | SAUDI ARABIA | 2009 |
300 | NESTOR OIL TUAS POWER SCOP PROJECT | JACOBS ENGINEERING SINGAPORE PTE LTD | FITTING | A234 WPB/A403 WP316L | SINGAPORE | 2009 |
301 | SAKHALIN II PROJECT | SAKHALIN ENERGY INVESTMENT CO.,LTD | FLANGE/GASKET | A182 F316/A350 LF2/SOFT IRON | 40 TON RUSSIA |
2009 |
302 | SOHAR FERTILISER PROJECT | MITSUBISHI HEAVY INDUSTRIES | FITTING/FORGED FITTING/FLANGE | A403 WP316L/A182 F316L | OMAN | 2009 |
303 | JAMBI MERANG PROJECT | PERTAMINA-HESS/PT.TRIPATRA | FLANGE | A240 S32760/A182 F51 | SINGAPORE | 2009 |
304 | JAMBI MERANG PROJECT | PERTAMINA-HESS/PT.TRIPATRA | FITTING | A234 WPB/A105 | 20 TON SINGAPORE |
2009 |
305 | JAMBI MERANG PROJECT | PERTAMINA-HESS/PT.TRIPATRA | FITTING | A403 WP316L/A182 F51/A815 S31803 | 25 TON SINGAPORE |
2009 |
306 | SA17780-CWLH REDEVELOPMENT PROJECT | DYNA MAC ENGINEERING SERVICES PTE LTD | FITTING | A694 F52/A860 WPHY52 | SINGAPORE | 2009 |
307 | CURTIS KELLY USA PROJECT | CURTIS KELLY | FLANGE | A182 F304/304L | 55 TON USA |
2009 |
308 | SIDI KRIR&EL ATF POWER STATION PROJECT | TOYOTA TSUSHO CORPORATION | BOLT/NUT | A193 B7/A194 2H | 15 TON EGYPT |
2009 |
309 | SPT OLEFINS FURNACES PROJECT | EXXONMOBIL CHEMICAL ASIA PACIFIC | FITTING/FLANGE | A105 | 10 TON THAILAND |
2009 |
310 | HAZELWOOD-ALSTOM POWER PROJECT | PT PAL INDONESIA | PIPE/FITTING/FLANGE | A106/DIN 2605 T1 BA3 | INDONESIA | 2009 |
311 | OYONG DEVELOPMENT PROJECT | PT PAL INDONESIA | FITTING | A234 WPB/A105 | INDONESIA | 2009 |
312 | ROPP PROJECT | PT REKAYASA | FITTING | A182 F304/A403 WP304 | SINGAPORE | 2009 |
313 | DBNGP EXPANSION PROJECT | DBNGP WA NOMINEES PTY LTD | FLANGE | A694 F60 | AUSTRALIA | 2009 |
314 | SINO IRON PROJECT | VISAVAKIT PATANA CORP.,LTD | NOZZLE/LWN FLANGE | SA182 F22 CL1 | THAILAND | 2009 |
315 | WORSLEY MULTI-FUEL COTEN PROJECT | AE&E (AUST) PTY LTD | FITTING | SA234 WP91/WP22 | CHINA | 2009 |
316 | TPO PROJECT | FOSTER WHEELER | FITTING/FORGED FITTING/FLANGE | A403 WP304A105/A182 F304 | 35 TON THAILAND |
2009 |
317 | DEVIL CREEK DEVELOPMENT PROJECT | CLOUGH THAILAND CO.LIMITD | FLANGE | A105/A350 LF2 | 30 TON INDONESIA |
2009 |
318 | PERTAMINA BALONGAN PROJECT | KRAKATAU ENGINEERING | SMLS/ERW PIPE/FITTING | A106 GR.B/A234 WPB | 210 TON INDONESIA |
2009 |
319 | JUBILEE FPSO | MODEC | FITTING/FORGED FITTING/FLANGE | A860 WPHY52/A234 WPC/A694 F52 | 50 TON SINGAPORE |
2009 |
320 | DUBAI WORLD CENTRAL INTERNATIONAL AIRPORT | GOVERNMENT OF DUBAI | FITTING | A234 WPB | 30 TON DUBAI |
2009 |
321 | UZTRANSGAS KUNGRAD GAS DEHYDRATION PROJECT | CW SINGAPORE | BOLT/NUT | A193 GR.B7/A194 GR.2H | 20 TON UZBEKISTAN |
2009 |
322 | UZTRANSGAS KUNGRAD GAS DEHYDRATION PROJECT | CW SINGAPORE | SAW PIPE/FITTING | API 5L-B(PSL1)/A671 CC60 C22 S2/WPL6 | 200 TON UZBEKISTAN |
2009 |
323 | JAMBI MERANG PROJECT | PERTAMINA-HESS/PT.TRIPATRA | EFW PIPE | A312 TP316L | SINGAPORE | 2009 |
324 | JAMBI MERANG PROJECT | PERTAMINA-HESS/PT.TRIPATRA | SMLS PIPE | A106 GR-B | 50 TON SINGAPORE |
2009 |
325 | TPO PROJECT | MTP HPPO MANUFACTURING CO.,LTD | EFW PIPE | A672 C70 CL.12 | 200 TON THAILAND |
2009 |
326 | BM PROJECT | MITSUBISHI HEAVY INDUSTRIES LTD | EFW PIPE | A358 304-CL2 | BRUNEI | 2009 |
327 | SPOX PROJECT | EXXONMOBIL CHEMICAL ASIA PACIFIC | SMLS/ERW PIPE | A106 GR-B/API 5L-B | 30 TON SINGAPORE |
2009 |
328 | RABIAH DEVELOPMENT PROJECT | MITSUI ENGINEERING & SHIPBUILDING CO.,LTD | SAW PIPE | API 5L-B (PSL1) | SAUDI ARABIA | 2009 |
329 | SINGAPORE LOCAL PROJECT | VAN LEEUWEN PIPE AND TUBE SINGAPORE | ERW PIPE | ASTM A53B | 20 TON SINGAPORE |
2009 |
330 | SINGA PIPELINE PROJECT | PT MEDCO E&P INDONESIA | ERW PIPE | API 5L-X65 | 1020 TON INDONESIA |
2009 |
331 | MAIN NORTH DURI DEVELOPMENT PROJECT | BP MIGAS FOR CHEVRON INDONESIA | ERW PIPE | API 5L-B(PSL1) | 110 TON INDONESIA |
2009 |
332 | RABIGH PC2 PROJECT | MITSUI ENGINEERING & SHIPBUILDING CO.,LTD | ERW PIPE/FLANGE | API 5L-B (PSL1) / A105 | SAUDI ARABIA | 2009 |
333 | NNGPF-PAD M1&M2 PROJECT | PNOC/EDC | ERW/SAW PIPE | API 5L-B (PSL1) | 10 TON PHILIPPINE |
2009 |
334 | LGPF-PAD MG-F WELLS PROJECT | PNOC/EDC | ERW/SAW PIPE | API 5L-B(PSL1) | 320 TON PHILIPPINE |
2009 |
335 | WORSLEY MULTI FUEL COGEN PROJECT | AE&E NANJING BOILER CO.,LTD | FLANGE/FITTING/GASKET | SA234 WP22 | CHINA | 2009 |
336 | M3-232 DULANG PROJECT | PETRONAS | FLANGE, FORGED FITTING | SA694 F60 | 10 TONS MALAYSIA |
2009 |
337 | SMDS JETTY UPGRADE PHASE1 | SHELL MDS | FITTING | A182 F321/A403 WP321 | 8 TONS MALAYSIA |
2009 |
338 | PSR-2 REVAMP PROJECT | FOSTER WHEELER ENERGY LIMITED | FITTING/FLANGE | F321/F5/F304L/A285 GR.C/A105 | 23 TONS MALAYSIA |
2009 |
339 | MELAKA REFINERY PSR2 REVAMP PROJECT | TUAH NUSA SDN BHD | FITTING/FLANGE | F5,F9,F11,F316L, F321,F304L,A105 | 12 TONS MALAYSIA |
2009 |
340 | KUMANG&TANGGA BARAT CLUSTER DEVELOPMENT PROJECT | PETRONAS CARIGALI SDN BHD | FLANGE/FORGED FITTING | LF2/A105N/A182 F316L/A694 F65 | 13 TONS MALAYSIA |
2009 |
341 | FOSTER WHEELER PROJECT | FOSTER WHEELER E&C SDN BHD | FLANGE/FITTING | F321/A105N/F316/A285 GR.C/F9/F11/F5 | 20 TONS MALAYSIA |
2009 |
342 | CARIGALI HEESS MRU PROJECT | TUAH NUSA SDN. BHD | FITTING/FLANGE | WP316L/WPL6/ WPB/A105N/F316L | 306 TONS MALAYSIA |
2009 |
343 | PSR-2 REVAMP PROJECT | FORSTER WHEELER SDN. BHD | FITTING/FLANGE | F11/F9/A285 GR.C/F321/F304H | 15 TONS MALAYSIA |
2009 |
344 | PSR-2 REVAMP PROJECT | FOSTER WHEELER E&C SDN BHD | FLANGEOLET/SPACER RING | A182 F51/A815 UNS S31803 | 20 TONS MALAYSIA |
2009 |
345 | CARIGALI HEESS MRU PROJECT | TUAH NUSA SDN BHD | FITTING/FLANGE | WPL6/A234 WPB/A240 TP316 | 294 TONS MALAYSIA |
2009 |
346 | MAINTENANCE | MALAYSIAN FEFINING COMPANY SDN BHD | FITTING/FLANGE | A105N/F321/A182 F11/F5/A387 GR.5 | 12 TONS MALAYSIA |
2009 |
347 | MAINTENANCE | PETRONAS | FITTING/FLANGE | A182 F316 / A240 TP316 | 16TONS MALAYSIA |
2009 |
348 | MAINTENANCE | SHELL GLOBAL SOLUTIONS INTERNATIONAL | FITTING/FLANGE | A105/F65/F51/ S31803 | 14 TONS MALAYSIA |
2009 |
349 | MAINTENANCE | BRUNEI SHELL PETROLEUM CO. SDN.BHD. | FLANGE | A240 TP316/A105NA182 F304L | 6 TONS MALAYSIA |
2009 |
350 | FOSTER WHEELER PROJECT | FOSTER WHEELER | FLANGE/FITTING | LF2/A105N/A182 F321 | 50 TONS MALAYSIA |
2009 |
351 | FOSTER WHEELER PROJECT | FOSTER WHEELER | FLANGE | A240 GR.321/A516 GR.70/A182 F9 | 12 TONS MALAYSIA |
2009 |
352 | FOSTER WHEELER PROJECT | FOSTER WHEELER E&C SDN BHD | SPACER RING | A285 GR.C/A387 GR.11/GR.9/GR.5 | 10 TONS MALAYSIA |
2009 |
353 | PPCL BPA PROJECT (BOI PROJECT) | PTT PHENOL COMPANY LIMITED | FITTING | A403 WP304L | 21 TONS THAILAND |
2009 |
354 | PPCL BPA PROJECT (BOI PROJECT) | PTT PHENOL COMPANY LIMITED | FITTING/FLANGE | A403 WP304/A105 | 81 TONS THAILAND |
2009 |
355 | BOI PROJECT | PTT POLYETHYLENE COMPANY LIMITED | FLANGE | A105N/A182 F304L/F316L | 90 TONS THAILAND |
2009 |
356 | BOI PROJECT | PTT PHENOL COMPAY LIMITED. | FITTING | A403 WP304 | 33 TONS THAILAND |
2009 |
357 | ENERFLEX BP PROJECT | SPECIAL TECHNICAL SERVICES LLC | FLANGE | SA350 LF2 | 6.8 TONS OMAN |
2009 |
358 | KANSAI-30 VESSELS&HEAT EXCHANGE | KANSAI CHEMICAL ENGINEERING | TUBE/U-TUBE | A213 TP304/304L | 7 TONS MALAYSIA |
2009 |
359 | LANGSAT TERMINAL PROJECT | LANGSAT TERMINAL SDN BHD | FORGED FITTING | A105 | 16 TONS MALAYSIA |
2009 |
360 | LANGSAT TERMINAL PROJECT | LANGSAT TERMINAL SDN BHD | FITTING/FLANGE | A234 WPB/A105 | 438 TONS MALAYSIA |
2009 |
361 | TUPI PROJECT | AIBEL LIMITED | FITTING | A403 WP316L | 14 TON THAILAND |
2009 |
362 | TUPI PROJECT | AIBEL LIMITED | FORGED BAR | A694 F52 | 7 TON THAILAND |
2009 |
363 | TUPI PROJECT | AIBEL LIMITED | FORGED PIPE | A671 GR.CC65 CL.22 | 30 TON THAILAND |
2009 |
364 | PSR2 REVAMP PROJECT | FORSTER WHELLER | SAW PIPE | API 5L GR.B PSL 2 | 50 TON MALAYSIA |
2009 |
365 | MELAKA REFINERY PSR2 RAVAMP PROJECT | MALAYSIAN REFINING COMPANY | ERW/SAW PIPE | A672 CC60 CL.22/API 5L GR.B | 65 TON MALAYSIA |
2009 |
366 | KUMANG&TANGGA BARAT CLUSTER DEVELOPMENT PROJECT | SIME DARBY ENGINEERING SDN BHD | ERW PIPE | A671 GR.CC65 CL.22 | 600 TON MALAYSIA |
2009 |
367 | ARTHIT PROJECT | PANTECH | SAW PIPE | A671 CL.22 S2 | 40 TON MALAYSIA |
2009 |
368 | SAUDI KAYAN HDPE PROJECT | DAELIM | SMLS PIPE | A106-B 3 LAYER PE COATING | 60 TON MALAYSIA |
2009 |
369 | LANGSAT TERMINAL PROJECT | LANGSAT TERMINAL SDN BHD | ERW/SAW PIPE | API 5L GR.B PSL 1 | 2,750 TON MALAYSIA |
2009 |
370 | LANGSAT TERMINAL PROJECT | LANGSAT TERMINAL SDN BHD | ERW PIPE | API 5L GR.B | 500 TON MALAYSIA |
2009 |
371 | DE&C PUNJ-LLOYD SSGP PROJECT | DIALOG OTEC SDN BHD | SAW PIPE | API 5L X70 PSL2 | 108 TON MALAYSIA |
2009 |
No | PROJECT | CLIENT/CONTRACTOR | SUPPLIED ITEM | MATERIAL | QUANTITY/ COUNTRY |
YEAR |
212 | EDC PROJECT | ENERGY DEVELOPMENT CORPORATION | SMLS/SAW PIPE | CARBON STEEL | 1700 TON PHILIPPINES |
2010 |
213 | GUMUSUT-KAKAP PROJECT | MASTEK OIL TOOLS SDN BHD | SMLS PIPE | F65 | 40TONS SINGAPORE |
2010 |
214 | THIRD ANGLE PROJECT | EIMCO WATER TECHNOLOGY | ROUND BAR | UNS S31803 | 10TONS SINGAPORE |
2010 |
215 | KINABALU NAG | MSET ENGINEERING CORPORATION SDN BHD | FLANGES | SA105N | 20TONS MALAYSIA |
2010 |
216 | JZINK-2NOS T.O THAILAND PROJECT | JAPMAS STEEL SDN.BHD | FLANGES | SA105N/F310 | 40TONS MALAYSIA |
2010 |
217 | TRAIN 3 AND TRAIN 4 PROJECT | BLNG BRUNEI | EFW PIPE | A672 C65 CL.22 | 155TONS BRUNEI |
2010 |
218 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS INTERNATIONAL B.V | FLANGES | A105/A516 GR.70 | 70TONS BRUNEI |
2010 |
219 | DULANG PROJECT | NORSKAR ARENA RESOURCES | PIPE/FITTING/FLANGE | API 5L B/A106 B/A105 | 40TON MALAYSIA |
2010 |
220 | FPSO CIDADE DE SAO PAULO MV-23 | AIBEL(THAILAND) LTD | FORGED PIPE | A182 F316/316L | 10TONS THAILAND |
2010 |
221 | TUPI PROJECT | AIBEL(THAILAND) LTD | FITTINGS/PIPES | WHPY52/WPL6/WPC/API 5L X52/A105N/A516 GR.70/S31803 | 40TONS THAILAND |
2010 |
222 | GUARA-PETROBRAS FPSO CIDADE DE SAO PAULO MV-23 | AIBEL(THAILAND) LTD | FITTINGS | A403 WP316L | 15TONS THAILAND |
2010 |
223 | TGTU1&ARU-2 PROJECT | IRPC COMPANY LIMITED | FLANGES | A105N | 10TONS THAILAND |
2010 |
224 | TUPI PROJECT | AIBEL(THAILAND) LTD | FLANGES/FORGED FITTINGS/SPACER RING | A694 F52/A860 WHPY52/F316L | 40TONS THAILAND |
2010 |
225 | TUPI PROJECT | AIBEL(THAILAND) LTD | FITTINGS | A420 WPL6 | 10TONS THAILAND |
2010 |
226 | MELAKA REFINERY PSR2 REVAMP PROJECT | FOSTER WHEELER ENERGY LIMITED | FLANGES/FORGED FITTINGS | A105N/A185 GR.C/A182 F11 | 15TONS MALAYSIA |
2010 |
227 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS INTERNATIONAL B.V | FLANGES | F51/F316L/S31803/A516 GR.70 | 40TONS MALAYSIA |
2010 |
228 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS INTERNATIONAL B.V | FLANGES | A694 F65/F51/F316L/LF2/A105 | 10TONS MALAYSIA |
2010 |
229 | ONGC OPAL DAHEJ PIPE PREFABRICATION WORKS | UNKNOWN | FLANGES | F22 | 10TONS MALAYSIA |
2010 |
230 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS INTERNATIONAL B.V | SPECTACLE BLINE,SPACER RING | LF2/A516 GR.60/A240 TP316 | 25TONS MALAYSIA |
2010 |
231 | SAND MANAGEMENT PROJECT | CARIGALI HESS OPERATING COMPANY SDN.BHD | FITTINGS/FLANGES | WPL6/ WPB/UNS S31803/A182F51/F316L/ A105N/A516 GR.70/65 |
80TONS MALAYSIA |
2010 |
232 | MEW/C/3656 | EPC OF SHUAIBA NORTH | FLAGNE AWWA | A105N LINED F316L C207 | 40TON DUBAI |
2010 |
233 | BOI PROJECT | AJINOMOTO CO.,LTD | FITTINGS | SUS 304 JIS B2313 | 30 TONS THAILAND |
2010 |
234 | HEXANEDIOL PROJECT | UBE FINE CHEMICALS CO., LTD | FITTINGS,FLANGES | WPB,F316,F347,F304,F316L | 60 TONS THAILAND |
2010 |
235 | BASF PETRONAS CHEMICAL PROJECT | DIALOG OTEC SDN.BHD | TUBE SHEET,FLANGES, | LF2 | 13TONS MALAYSIA |
2010 |
236 | EPCC LANGSAT TERMINAL | LANGSAT TERMINAL SDN.BHD | FITTINGS,FLANGES | WPB | 80TONS MALAYSIA |
2010 |
237 | SURIYA B DEVELOPMENT PROJECT | DIALOG OTEC SDN.BHD | FLANGES, FITTINGS, PIPE | F51,F31803 | 45TONS MALAYSIA |
2010 |
238 | BASF HEAT EXCHANGER | DIALOG OTEC SDN.BHD | FLANGES | F304 | 20TONS MALAYSIA |
2010 |
239 | LANGSAT TERMINAL PHASE 3 | DIALOG OTEC SDN.BHD | FITTINGS,FLANGES | A105,WPB | 47TONS MALAYSIA |
2010 |
240 | SAND MANAGEMENT PROJECT | CARIGALI HESS OPERATING CO.SDN.BHD | FITTINGS,FLANGES | LF2,A105B,A516 GR.70,F316,WPL6,S310803 | 100TONS MALAYSIA |
2010 |
241 | WAYANG WINDU GEOTHERMAL PROJECT | STAR ENERGY | PIPE | API 5L-B | 200 TON INDONESIA |
2010 |
242 | PEQUIVEN MORON FERTILIZER PROJECT | TECNO FRONTIER CO., LTD | PIPE | API 671 CC60,70 / API 5L-B | 100 TON VENEZUELA |
2010 |
243 | LIHIR GOLD PROJECT | AIR PRODUCTS | PIPE | API 5L-B | 70 TON PAPUA NEW GUINEA |
2010 |
244 | EDC PROJECT | ENERGY DEVELOPMENT CORPORATION | PIPE | API 5L-B | 20 TON PHILLIPPINE |
2010 |
245 | JAMBI MERANG PROJECT | PERTAMINA-HESS/PT.TRIPATRA | PIPE | A312 TP316L | 45TON SINGAPORE |
2010 |
246 | TANJUNG PRIOK GAS FIELD POWER PLANT EXTENSION PROJECT | PT. PLN (PERSERO) | PIPE | API 5L-B | 20 TON INDONESIA |
2010 |
247 | UNKNOWN | PT. WAKA MAGMA ENGINEERING | PIPE | API 5L-B | 60 TON SINGAPORE |
2010 |
248 | ROP PROJECT | PT. PERTAMINA (PERSERO) | PIPE | API 5L-B | 10 TON INDONESIA |
2010 |
249 | BALONGAN PROJECT | PT. PERTAMINA (PERSERO) | PIPE | A53-B | 150 TON INDONESIA |
2010 |
250 | BALONGAN PROJECT | PT. PERTAMINA (PERSERO) | FITTING/FORGED FITTING | A234 WPB / A105 | 30 TON INDONESIA |
2010 |
251 | AR RAZI PLANT-V PROJECT | SAUDI METHANOL COMPANY | FLANGE/FITING | A182 F304 / A403 WP304 | SAUDI ARABIA | 2010 |
252 | SAKHALIN II PROJECT | SAKHALIN ENERGY INVESTMENT | FLANGE | A105 / A182 F304 | 15 TON RUSSIA |
2010 |
253 | ZAMZAMA GAS PLANT PROJECT | BHP PETROLEUM (PAKISTAN) | INDUCTION BEND/FITTING | UNS 31803 | PAKISTAN | 2010 |
254 | BLOCK 12W FIELD DEVELOPJMENT FPSO | PREMIER OIL VIETNAM OFFSHORE SV | SE 2:1 HEAD | SA240 TP316/316L | 20 TON SINGAPORE |
2010 |
255 | JAMBI MERANG PROJECT | PERTAMINA-HESS/PT.TRIPATRA | FITTING/FORGED FITTING | A234 WPB / A105 | 50 TON SINGAPORE |
2010 |
256 | JAMBI MERANG PROJECT | PERTAMINA-HESS/PT.TRIPATRA | FITTING/FORGED FITTING | A403 WP304,316/UNS 31803 / A182 F51 | 50 TON SINGAPORE |
2010 |
257 | JAMBI MERANG PROJECT | PERTAMINA-HESS/PT.TRIPATRA | SPECTACLE BLIND/BLIND/SPACER | A283 Gr.C/A240 316L/A182 F51 | 12 TON SINGAPORE |
2010 |
258 | JAMBI MERANG PROJECT | PERTAMINA-HESS/PT.TRIPATRA | BLEED RING | UNS 32760 | SINGAPORE | 2010 |
259 | AMMONIUM NITRATE PRILL PLANT PROJECT | PT. KALTIM NITRATE INDONESIA | FITTING | A403 WP304,316/UNS 31803 / A182 F51,F321 | JAKARTA | 2010 |
260 | CB&I PROJECT | FABRICATOR-PROCESS EQUIPMENT | NOZZLE/FLANGE | A182 F304/304L | 45 TON USA |
2010 |
261 | UNKNOWN | FABRICATOR-PROCESS EQUIPMENT | RING FLANGE | A182 F304/304L | 10 TON USA |
2010 |
262 | MINAS SURFACTANT PROJECT | PETRECO PROCESS SYSTEMS CAMERON | FITTING/FORGED FITTING | A403 WP316,304/ A182 F316,304 | JAKARTA | 2010 |
263 | UNKNOWN | CHEVRON NIGERIA LTD | FLANGE | A105 | 30 TON BELGIUM |
2010 |
264 | UNKNOWN | UNKNOWN | FLANGE | A694 F42, F52 | 20 TON USA |
2010 |
265 | PTTAR CLEAN FUEL PROJECT | SK ENGINEERING & CONSTRUCTION | FITTING | A420 WPL6 | SINGAPORE | 2010 |
266 | UPD-A MODIFICATION EPCC PROJECT | UNKNOWN | FITTING/FLANGE/BOLTNUT/PIPE | A105N/A234 WPB/A193B7,2H | CANADA | 2010 |
267 | ACTEW PROJECT | UNKNOWN | FLANGE | A105N | 20 TON SYDNEY |
2010 |
268 | INDONESIAN BURIED PIPE PROJECT | UNKNOWN | PIPE | API 5L X52 | 770 TON INDONESIA |
2010 |
269 | WAYANG WINDU GEOTHERMAL PROJECT | STAR ENERGY | PIPE | API 5L-B | 200 TON INDONESIA |
2010 |
270 | PEQUIVEN MORON FERTILIZER PROJECT | TECNO FRONTIER CO., LTD | PIPE | API 671 CC60,70 / API 5L-B | 100 TON VENEZUELA |
2010 |
271 | LIHIR GOLD PROJECT | AIR PRODUCTS | PIPE | API 5L-B | 70 TON PAPUA NEW GUINEA |
2010 |
272 | EDC PROJECT | ENERGY DEVELOPMENT CORPORATION | 4D BEND | A234 WPB | 20 TON PHILLIPPINE |
2010 |
273 | JAMBI MERANG PROJECT | PERTAMINA-HESS/PT.TRIPATRA | PIPE | A312 TP316L | 45TON SINGAPORE |
2010 |
274 | TANJUNG PRIOK GAS FIELD POWER PLANT EXTENSION PROJECT | PT. PLN (PERSERO) | PIPE | API 5L-B | 20 TON INDONESIA |
2010 |
275 | UNKNOWN | PT. WAKA MAGMA ENGINEERING | PIPE | API 5L-B | 60 TON SINGAPORE |
2010 |
276 | ROP PROJECT | PT. PERTAMINA (PERSERO) | PIPE | API 5L-B | 10 TON INDONESIA |
2010 |
277 | BALONGAN PROJECT | PT. PERTAMINA (PERSERO) | PIPE | A53-B | 150 TON INDONESIA |
2010 |
278 | BALONGAN PROJECT | PT. PERTAMINA (PERSERO) | FITTING,FORGED FITTING | A234 WPB / A105 | 30 TON INDONESIA |
2010 |
279 | AR RAZI PLANT-V PROJECT | SAUDI METHANOL COMPANY | FLANGE,FITING | A182 F304 / A403 WP304 | SAUDI ARABIA | 2010 |
280 | SAKHALIN II PROJECT | SAKHALIN ENERGY INVESTMENT | FLANGE | A105 / A182 F304 | 15 TON RUSSIA |
2010 |
281 | ZAMZAMA GAS PLANT PROJECT | BHP PETROLEUM (PAKISTAN) | INDUCTION BEND,FITTING | UNS 31803 | PAKISTAN | 2010 |
282 | BLOCK 12W FIELD DEVELOPJMENT FPSO | PREMIER OIL VIETNAM OFFSHORE SV | SE 2:1 HEAD | SA240 TP316/316L | 20 TON SINGAPORE |
2010 |
283 | JAMBI MERANG PROJECT | PERTAMINA-HESS/PT.TRIPATRA | FITTING/FORGED FITTING | A234 WPB / A105 | 50 TON SINGAPORE |
2010 |
284 | JAMBI MERANG PROJECT | PERTAMINA-HESS/PT.TRIPATRA | FITTING/FORGED FITTING | A403 WP304,316/UNS 31803 / A182 F51 | 50 TON SINGAPORE |
2010 |
285 | JAMBI MERANG PROJECT | PERTAMINA-HESS/PT.TRIPATRA | SPECTACLE BLIND,BLIND/SPACER | A283 Gr.C/A240 316L/A182 F51 | 12 TON SINGAPORE |
2010 |
286 | JAMBI MERANG PROJECT | PERTAMINA-HESS/PT.TRIPATRA | BLEED RING | UNS 32760 | SINGAPORE | 2010 |
287 | AMMONIUM NITRATE PRILL PLANT PROJECT | PT. KALTIM NITRATE INDONESIA | FITTING | A403 WP304,316/UNS 31803 / A182 F51,F321 | JAKARTA | 2010 |
288 | CB&I PROJECT | FABRICATOR-PROCESS EQUIPMENT | NOZZLE/FLANGE | A182 F304/304L | 45 TON USA |
2010 |
289 | UNKNOWN | FABRICATOR-PROCESS EQUIPMENT | RING FLANGE | A182 F304/304L | 10 TON USA |
2010 |
290 | MINAS SURFACTANT PROJECT | PETRECO PROCESS SYSTEMS CAMERON | FITTING,FORGED FITTING | A403 WP316,304/ A182 F316,304 | JAKARTA | 2010 |
291 | UNKNOWN | CHEVRON NIGERIA LTD | FLANGE | A105 | 30 TON BELGIUM |
2010 |
292 | UNKNOWN | UNKNOWN | FLANGE | A694 F42, F52 | 20 TON USA |
2010 |
293 | PTTAR CLEAN FUEL PROJECT | SK ENGINEERING & CONSTRUCTION | FITTING | A420 WPL6 | SINGAPORE | 2010 |
294 | UPD-A MODIFICATION EPCC PROJECT | UNKNOWN | FITTING,FLANGE,BOLTNUT,PIPE | A105N/A234 WPB/A193B7,2H | CANADA | 2010 |
295 | ACTEW PROJECT | UNKNOWN | FLANGE | A105N | 20 TON SYDNEY |
2010 |
No | PROJECT | CLIENT/CONTRACTOR | SUPPLIED ITEM | MATERIAL | QUANTITY/ COUNTRY |
YEAR |
160 | FPSO CIDADE DE SAO PAULO MV-23 | MODEC | FLANGES,FORGED PIPE | A105N,A694 F52,A312 TP316L | 160TONS THAILAND | 2011 |
161 | GUARA PROJECT | AIBEL LIMITED | FLANGES,FIITTINGS | A516 70,A350 LF2, A240 316L, A234 WPB |
40TONS THAILAND | 2011 |
162 | GUARA PETROBRAS FPSO DIDADE DE SAO PAULO MV-23 | AIBEL LIMITED | FITTINGS, FLANGES | A403 WP316L, A234 WPB, A516 GR.70 |
30TONS THAILAND | 2011 |
163 | GUARA PETROBRAS FPSO DIDADE DE SAO PAULO MV-23 | AIBEL LIMITED | FORGED FITTINGS | A182 F51 | 20TONS THAILAND | 2011 |
164 | TANGGA BARAI CLUSTER PROJECT | PETRONAS CALIGARI SDN.BHD | SPACER | A350 LF2, A182 F316 | 20TONS MALAYSIA | 2011 |
165 | PLANT REJUVENATION & REVAMP 2 PROJECT | PETRONAS | FORGED FITTINGS,FITTINGS | A403 WP304L, A105N,A350 LF2 | 30TONS MALAYSIA | 2011 |
166 | PLANT REJUVENATION & REVAMP 2 PROJECT | PETRONAS | SAW PIPES | API 5LB PSL1 | 170TONS MALAYSIA | 2011 |
167 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS INTERNATIONAL | FLANGES | A182 F51,F316L A350 LF2,A105 | 40TONS MALAYSIA | 2011 |
168 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS INTERNATIONAL | FITTINGS | A403 WP316L,A815 S31803,WPL6 | 65TONS MALAYSIA | 2011 |
169 | PLANT REJUVENATION & REVAMP 2 PROJECT | PETRONAS | FORGED FITTINGS,FITTINGS | A105N | 25TONS MALAYSIA | 2011 |
170 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS INTERNATIONAL | FLANGES | A516 60 SPACER RING | 20TONS MALAYSIA | 2011 |
171 | MAINTENANCE | PT. PETROKIMIA | SEAMLESS PIPE | API 5L-B | 335TON INDONESIA |
2011 |
172 | SUBAN 12 - COPI PROJECT | UNKNOWN | FLANGE,BLANK,SPACER, BLEED RING |
A105N/A182F51/A516-60 | INDONESIA | 2011 |
173 | SABAH OIL AND GAS TERMINAL PROJECT | ASTURI METAL BUILDERS(M) SDN.BHD | FORGING | SA350LF3/LF2/SA105N/ SA182F304L |
102TON MALAYSIA |
2011 |
174 | UNKNOWN | UNKNOWN | FORGING | SA965/SA336 F304/304L | 355TON BELGIUM |
2011 |
175 | UNKNOWN | UNKNOWN | FORGING | SA350 LF2 | 20TON USA |
2011 |
176 | UNKNOWN | UNKNOWN | NOZZLE,FLANGE | SA182F304L/F316L | USA | 2011 |
177 | UNKNOWN | UNKNOWN | FITTING | A234 WPB | 37TON USA |
2011 |
178 | UNKNOWN | UNKNOWN | FORGING,FLANGE,NOZZLE | SA105 | USA | 2011 |
179 | UNKNOWN | UNKNOWN | FLANGE,PADDLE BLIND | A105/A697-F70 | 34TON USA |
2011 |
180 | PETRONAS PROJECT | SAIM DARBY | SAW PIPE | API 5L-B PSL1 | 140TON MALAYSIA |
2011 |
181 | UNKNOWN | UNKNOWN | SE 2:1 HEAD | SA516 GR 70N | 18TON SINGAPORE |
2011 |
182 | SOUTH SUMATRA NGL PROJECT | PT. E1-PERTAGAS | WELDED PIPE | A53-B | 415TON INDONESIA |
2011 |
183 | SOUTH SUMATRA NGL PROJECT | PT. E1-PERTAGAS | WELDED PIPE | A312 TP304 | 32TON INDONESIA |
2011 |
184 | SOUTH SUMATRA NGL PROJECT | PT. E1-PERTAGAS | FITTING,FORGED FITTING | A403WP304/A182F304/ A234WPB/A105 |
20TON INDONESIA |
2011 |
185 | SOUTH SUMATRA NGL PROJECT | PT. E1-PERTAGAS | NOZZLE,FLANGE,BLANK /SPACER |
SA350LF2/SA182F304/ SA516 GR.70 |
20TON INDONESIA |
2011 |
186 | SOUTH SUMATRA NGL PROJECT | PT. E1-PERTAGAS | 5D BEND | API 5L.B PSL2 ERW | INDONESIA | 2011 |
187 | UNKNOWN | PT. SULPHINDO ADIUSAHA | PIPE,FITTING,FLANGE | B861 WPT2/B363 WPT2/B381 GR.F2/A53-B/A234WPB/A105 | 22TON INDONESIA |
2011 |
188 | PERTAMINA BALONGAN PROJECT | PT. PERTAMINA (PERSERO) | FLANGE | A182 F321 | INDONESIA | 2011 |
189 | MT1&HT1 PROJECT | UNKNOWN | FORGED PIPE/FITTING/ FLANGE |
A182F51/S31803 | VIETNAM | 2011 |
190 | NS1 PROJECT | UNKNOWN | NOZZLE | A182F91/F22CL.1/A105 | VIETNAM | 2011 |
191 | TUPI3 PROJECT | UNKNOWN | FITTING,FLANGE | A860 WPHY52/A420 WPL6/A403 WP316L/UNS32750 | 20TON SINGAPORE |
2011 |
192 | NINGBO LNG PROJECT | UNKNOWN | FLANGE,GASKET, FITTING,PIPE |
A182 F316L/A312 TP316L | CHINA | 2011 |
193 | CILIPADI GAS FIELD DEVELOPMENT PROJECT CONTRUCTION OF TOPSIDE | SARAWAK SHELL BHD | 3D PIPE BEND | A182 F51 | MALAYSIA | 2011 |
194 | UNKNOWN | TRANS THAI MALAYSIA (THAILAND) LIMITED | FORGING | A3SA350 LF2 CL.1 | MALAYSIA | 2011 |
195 | KHARYAGA PROJECT | KNM | FORGED FITTINGS | A350 LF2 | MALAYSIA | 2011 |
196 | UNKNOWN | HYUNDAI HEAVY INSTUSTRIES CO. | ERW PIPE | API 5L-B | THAILAND | 2011 |
197 | CCG HDS PROJECT | TECHNIP | SPECTACLE BLIND,BLIND/SPACER | A240 TP321/TP316/A387-11 CL.2 | THAILAND | 2011 |
198 | PLATFORM COMPRESSION FACILITIES PROJECT | THAI OIL | FLANGE,FITTING,SPADE /SPACER |
A105N (GALV.) | THAILAND | 2011 |
199 | UNKNOWN | UNKNOWN | BOLTNUT | A193 B7/2H | THAILAND | 2011 |
200 | FIONA STANLY HOSPITAL | UNKNOWN | AS2129 FLANGE | A105N | AUSTRALIA | 2011 |
201 | UNKNOWN | UNKNOWN | AS4087 FLANGE | A105N | 43TON AUSTRALIA |
2011 |
202 | ACTEW PROJECT | UNKNOWN | AWWA FLANGE | A105N | AUSTRALIA | 2011 |
203 | RABIGH | RABIGH REFINING AND PETROCHEMICAL COMPANY | SAW PIPE, FLANGE | API 5L-GR.B/A105N | SAUDI ARABIA | 2011 |
204 | PHASE-III REFINERY PROJECTS | ENGINEERS INDIA LIMITED | FLANGE, SPACER/BLIND | A182 F11/A105 | INDIA | 2011 |
205 | PHASE-III REFINERY PROJECTS | MANGALORE REFINERY AND PETROCHEMICALS LIMITED | FLANGE, SPACER/BLIND | A182 F11/A105N | INDIA | 2011 |
No | PROJECT | CLIENT/CONTRACTOR | SUPPLIED ITEM | MATERIAL | QUANTITY/ COUNTRY |
YEAR |
67 | CONTRACT 32/5395/QR-01/2012 (NEW DRY GAS POWER STATION PROJECT) |
SCOP (STATE COMPANY FOR OIL PROJECT) |
ERW PIPE | API 5L X60 PSL2 ERW PIPE (DEALING IN COMMISSION BASE) |
6062TON IRAQ |
2012 |
68 | CONTRACT 32/5395/QR-01/2012 (NEW DRY GAS POWER STATION PROJECT) |
SCOP (STATE COMPANY FOR OIL PROJECT) |
SAW PIPE | API 5L X60 PSL2 LSAW PIPE (DEALING IN COMMISSION BASE) |
5192TON IRAQ |
2012 |
69 | CHANA COMBINED CYCLE POWER PLANT BLOCK 2/ TRAIN 1&2 |
ELECTRICITY GENERATING AUTHORITY OF THAILAND | FLANGES, FITTINGS | A105 GAL,A182 F316L,F304L,A403 WP304L | 50TONS THAILAND |
2012 |
70 | PTTAR IRPC MULTIPRODUCT PIPELINE PROJECT | IRPC PUBLIC COMPANY | FLANGES, SPECTACLE BLIND | A105, A516 GR.70 | 20TONS THAILAND | 2012 |
71 | RUNG TAWAN PROJECT | NONE | FLANGES | A182 F304, A105 | 24TONS THAILAND |
2012 |
72 | AYT PROJECT | AJINOMOTO CO., LTD | FITTINGS | JIS B2313 S304,S316L | 33TONS THAILAND | 2012 |
73 | TOPIS R TOPSIDE | EXXON MOBILE | FITTINGS,FLANGES | A815 S31803, A182 F51 | 20TONS MALAYSIA |
2012 |
74 | TALISMAN RO304-2010 |
PTSC | FLANGES | A182 F53 | 40TONS MALAYSIA |
2012 |
75 | KBB NORTHERN HUB PROJECT | KPOC | HANGER,COMPACT FLANGES | A694 F65, F70 | 65TONS MALAYSIA |
2012 |
76 | BIEN DONG 1 PROJECT | BIEN DONG PETROLEUM OPERATION COMPANY | FORGED FITTINGS | A105N | 24TONS MALAYSIA |
2012 |
77 | FPSO CENDOR | NONE | FLANGES | SS400 | 30TONS MALAYSIA |
2012 |
78 | SABAH OIL AND GAS TERMINAL PROJECT |
PETRONAS CARIGALI SDN BHD | SAW PIPES | API 5L B PSL.1 | 180TONS MALAYSIA |
2012 |
79 | PLANT REJUVENATION & REVAMP 2 PROJECT | PETRONAS | LATERAL | A403 WP304 | 20TONS MALAYSIA |
2012 |
80 | PENINSULAR GAS UTILIZATION PROJECT | PERONAS GAS BERHAD | FLANGE, SPACER BLANK | A105, A516 GR.70 | 30TONS MALAYSIA |
2012 |
81 | TOPIS R TOPSIDE | EXXON MOBILE EXPLORATION & PRODUCTION MALAYSIA | EFW PIPES | API 5L X52, A671 GR CC65 | 360TONS MALAYSIA |
2012 |
82 | BOOSTER COMPERESSION PROJECT | CARIGALI HESS OPERATING COMPANY SDN.BHD | FITTINGS,FLANGES | A182 F51, A420 WPL6 | 20TONS MALAYSIA |
2012 |
83 | BOOSTER COMPERESSION PROJECT | CARIGALI HESS OPERATING COMPANY SDN.BHD | FITTINGS,FLANGES, | A234 WPB,A420 WL6,A105N,A350 LF2,A516 70,A182 F51 | 570TONS MALAYSIA | 2012 |
84 | BOOSTER COMPERESSION PROJECT | CARIGALI HESS OPERATING COMPANY SDN.BHD | FORGED FITTINGS, PADDLE SPACER |
A182 F51,A815 S31803,A240 TP316 | 320TONS MALAYSIA |
2012 |
85 | INDEPENDENT DEEPWATER PETROLEUM TERMINAL AT PENGERANG | PENGERANG INDEPENDENT TERMINALS SDN BHD | FITTINGS | A234 WPB | 190TONS MALAYSIA |
2012 |
86 | INDEPENDENT DEEPWATER PETROLEUM TERMINAL AT PENGERANG | PENGERANG INDEPENDENT TERMINALS SDN BHD | ERW PIPES | API 5L GR.B PSL2 | 3,150TONS MALAYSIA |
2012 |
87 | TOPIS R TOPSIDE | EXXON MOBILE EXPLORATION & PRODUCTION MALAYSIA | SPECTACLE BLIND FLANGES | A516 GR.60, A240 TP316L, A182 F51 |
48TONS MALAYSIA |
2012 |
88 | BORF CENTRIFUGAL COMPRESSOR PROJECT | MURPHY SARAWAK OIL CO., LTD | FORGED FITTINGS,FLANGES | A105N,A182 F316L, A234 WPB |
65TONS MALAYSIA |
2012 |
89 | CHANA COMBINED CYCLE POWER PLANT BLOCK 2 |
ELECTRICITY GENERATING AUTHORITY OF THAILAND | FORGED FITTINGS,FLANGES | A694 F65, A182 F316L, A182 F51 |
70TONS MALAYSIA |
2012 |
90 | TOPIS R TOPSIDE | EXXON MOBILE EXPLORATION & PRODUCTION MALAYSIA | FORGED FITTINGS,FLANGES | A182 F316L,A105N, A182 F51 |
20TONS MALAYSIA |
2012 |
91 | EIP / PSA3 PROJECT | THAI OIL PUBLIC COMPANY LIMITED | SAW PIPES | API 5L B PSL.1 | 100 TONS THAILAND |
2012 |
92 | OSX 3 FPSO | AIBEL LIMITED | FITTINGS,FLANGES | A105N,A350 LF2,A182 F316L,A403 WP316L | 35TONS THAILAND | 2012 |
93 | BORF CENTRIFUGAL COMPRESSOR PROJECT | MURPHY SARAWAK OIL CO., LTD | FITTINGS,FLANGES | A403 WP316L,A694 F52 | 50TONS MALAYSIA |
2012 |
94 | SABAH OIL AND GAS TERMINAL PROJECT |
PETRONAS CARIGALI SDN BHD | FITTINGS,FLANGES | A350 LF2,A105N,A516 GR70,A403 WP321 | 80TONS MALAYSIA |
2012 |
95 | WANG NOI CCPP BLOCK 4 | ELECTRICITY GENERATING AUTHORITY OF THAILAND |
FORGED FITTINGS | A182 F316L | 20TONS THAILAND | 2012 |
96 | SABAH OIL AND GAS TERMINAL PROJECT |
PETRONAS CARIGALI SDN BHD |
FITTINGS,FLANGES | A350 LF2,A182 F316L, F304L105N, A516 GR70,A403 WP321 |
30TONS MALAYSIA |
2012 |
97 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS INTERNATIONAL |
FITTINGS,FLANGES,FORGED FITTINGS | A105N,A182 F304L, A283 GR.C,A403 WP304L, A420 WPL6 |
45TONS MALAYSIA |
2012 |
98 | OSX 3 FPSO | AIBEL LIMITED | FITTINGS,FLANGES,FORGED FITTINGS,FLANGOLET | A105N,A350 LF2, A182 F316L,A403 WP316L, A420 WPL6 |
55TONS THAILAND | 2012 |
99 | BORF CENTRIFUGAL COMPRESSOR PROJECT | MURPHY SARAWAK OIL CO., LTD | FLANGES | A182 F316L,A516 GR.70, A182 F51,A240 TP316L ,A694 F52,A105N, A350 LF2 |
180TONS MALAYSIA |
2012 |
100 | JG SUMMIT PE CAPACITY EXPANSION PROJECT | FITTINGS,FLANGES,FORGED FITTINGS | A105,A182 F304,F316L, A234 WPB,A403 WP304 |
60TONS PHILIPPINES | 2012 | |
101 | BORF CENTRIFUGAL COMPRESSOR PROJECT | MURPHY SARAWAK OIL CO., LTD | FITTINGS | A403 WP316L,A815 UNS S31803 | 90TONS MALAYSIA |
2012 |
102 | BOOSTER COMPERESSION PROJECT | CARIGALI HESS OPERATING COMPANY SDN.BHD | FITTINGS,FLANGES, SPECTACLE BLIND, FLANGOLET |
A815 S31803,A182 F51,A240 TP316L | 50TONS MALAYSIA |
2012 |
103 | BYPRODUCTS VALUE ADDED PROJECT | PTT GLOBAL CHEMICAL PUBLIC COMPANY LIMITED |
SPECTACLE BLIND FLANGES | A516 GR.70 | 25TONS THAILAND | 2012 |
104 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS |
FITTINGS, FLANGES | WP316L,A815 S31803,A182 F51,A105,A316L | 90TONS SINGAPORE | 2012 |
105 | KAMELIA-A WELLHEAD PLATFORM& PIPELINE PROJECT |
PERUNDING RANHILL WORLEY SDN BHD | BLEED RING | A182 F51 | 45TONS MALAYSIA |
2012 |
106 | D12 FIELD DEVELOPMENT | SHELL SARAWAK | PIPES,FITTINGS,FLANGES | SA790 S31803,
A815 S31803, A182 F51,F316L, A403 WP316L |
130TONS MALAYSIA |
2012 |
107 | TOPIS R TOPSIDE | EXXONMOBIL EXPLORATION & PRODUCTION MALAYSIA INC | FITTINGS | A815 S31803 | 80TONS MALAYSIA |
2012 |
108 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS |
PIPES,FITTINGS,FLANGES | A790 S31803,WPB, WPL6,LF2 |
110TONS SINGAPORE | 2012 |
109 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS |
FLANGE, FITTING | A105,A182 F51, A516 GR.60,A240 S31803, A815 31803 |
200TONS MALAYSIA |
2012 |
110 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS |
FLANGES | A182 F51,A350 LF2 A182 F316/316L | 130TONS MALAYSIA |
2012 |
111 | UNKNOWN | ORIGIN ENERGY | ORIFICE FLANGE,PLATE | A105N, SS316 | 100TONS MALAYSIA |
2012 |
112 | TOPIS R TOPSIDE | EXXONMOBIL EXPLORATION & PRODUCTION MALAYSIA INC |
FLANGES | A694 F65,A105N | 180TONS MALAYSIA |
2012 |
113 | WANG NOI CCPP BLOCK 4 | ELECTRICITY GENERATING AUTHORITY OF THAILAND |
FITTING,FORGED FITTING, FLANGE |
A182 F304L,316L,A105 | 35TONS THAILAND | 2012 |
114 | CHANA COMBINED CYCLE POWER PLANT BLOCK 2/ TRAIN 1&2 | ELECTRICITY GENERATING AUTHORITY OF THAILAND | FLANGE,
FITTING, FORGED FITTING |
A105 GAL,A182 F316L,F304L,A403 WP304L | 70TONS THAILAND |
2012 |
115 | MICCO AN PROJECT 200,000 MTPY | UNKNOWN | FITTINGS | A403 WP 304L | VIETNAM | 2012 |
116 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS |
FORGED FITTING | A105N,A350 LF2,A182 F304,A182 F316 | MALAYSIA | 2012 |
117 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS |
SPECTACLE BLIND FLANGES | A516 GR 70 | MALAYSIA | 2012 |
118 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS |
FLAGES,FTTINGS | A350 LF2,A182 F51,A815 S31803 | MALAYSIA | 2012 |
119 | SABAH OIL AND GAS TERMINAL PROJECT | SHELL GLOBAL SOLUTIONS |
FLANGE, FORGED FITTING | A105N,A350 LF2,A182 F304,A694 F65 | MALAYSIA | 2012 |
120 | BORF CENTRIFUGAL COMPRESSOR PROJECT | MURPHY SARAWAK OIL CO., LTD | FLANGES | A105N, A350 LF2, A182 F316/316L, A516 GR.70N |
MALAYSIA | 2012 |
121 | UNKNOWN | SEMBAWANG SHIPBUILDING | SAW PIPE | API 5L-B | 180TON SINGAPORE |
2012 |
122 | UNKNOWN | SAW PIPE,FITTING | API 5L-B/A234WPB | 45TON SINGAPORE |
2012 | |
123 | UNKNOWN | ASTURI METAL BUILDERS(M) SDN.BHD | FITTING | A403 WP316L | MALAYSIA | 2012 |
124 | INDONESIAN GAS PRODUCTION FACILITIES DEVELOPMENT PROJECT | KALILA (BENTU) LIMITED | SMLS PIPE | API 5L X52 PSL1 | 4300TON INDONESIA |
2012 |
125 | UNKNOWN | VIETNAM OIL | FITTING,FLANGE,SPECTACLE BLIND,SMLS PIPE | A182F316L/A403WP316L/ A106-B/A312TP316L |
VIETNAM | 2012 |
126 | FGRU PROJECT | PETRONAS GAS BERHAD | SAW/EFW PIPE | API 5L-B | 130TON MALAYSIA |
2012 |
127 | HSD / HST CHEMICAL & METHANOL INJECTION PUMPS SKID | PETROVIETNAM GAS CORPORATION | FITTING,FLANGE | A182F316/316L | VIETNAM | 2012 |
128 | WELLHEAD PLATFORM 8 & 9 DEVELOPMENT | CARIGALI HESS OPERATING COMPANY | FLANGEOLET,BLEEDRING | A182F51/S31803 | SINGAPORE | 2012 |
129 | UNKNOWN | QUEENSLAND NITRATES PTY LTD | HEAT EXCHANGER TUBE | A179 | 30TON AUSTRALIA |
2012 |
130 | UNKNOWN | PT. PROFAB INDONESIA | FITTING,FLANGE | A182F316/L | INDONESIA | 2012 |
131 | WORSLEY FACILITIES PROJTECT | ENERFLEX PROCESS PTY LTD | FORGED FITTING/FLANGE | A105N/A350LF2/A694F52 | AUSTRALIA | 2012 |
132 | THAI NATIONAL POWER 2 SPP POWER PROJECT | UNKNOWN | FITTING,FLANGE | A234WPB/A105N | THAILAND | 2012 |
133 | PNG LNG EPC4 (FUEL GAS CONDITIONING SYSTEM) | UNKNOWN | FITTING,FLANGE | A182F316L/A105N/A350LF2 | SINGAPORE | 2012 |
134 | HOPE DOWN'S 4 PROJECT | MONADELPHOUS | AS2129 FLANGE | A105N | 20TON AUSTRALIA |
2012 |
135 | MODIFICATION PIPELINE PROJECT | PT. PERTAMINA BALONGAN | ERW PIPE,FITTING | API 5L-B/A234WPB/A105N | 60TON JAKARTA |
2012 |
136 | PERTAMINA GAS-PERTAGAS PROJECT | PT. WIJAYA KARYA | PIPE BEND | API 5L-B | 30TON SINGAPORE |
2012 |
137 | SBM OSX2 TOP SIDE | UNKNOWN | FLANGE,FITTING, FORGED FITTING |
A105N/A403-WP316L/A815 S81803/A182F51/A182F53 | SINGAPORE | 2012 |
138 | CROSS COUNTRY PROJECT | PT. PERTAMINA RU IV Cilacap | DSAW PIPE | API 5L-B PSL1 WITH 3LPP COATING | 730TON INDONESIA |
2012 |
139 | BANYU URIP PROJECT | MOBIL CEPU INDONESIA | SAW PIPE | API 5L-B PSL2 SOUR/NON SOUR | 320TON INDONESIA |
2012 |
140 | BANYU URIP PROJECT | MOBIL CEPU INDONESIA | CLAD/SOLID TUBE SHEET | SA266Gr.2N+A240TP316L/ SA182F316L | INDONESIA | 2012 |
141 | BANYU URIP PROJECT | MOBIL CEPU INDONESIA | CLAD TUBE SHEET | SA266Gr.2N+SB-424 UNS N08825 | 30TON INDONESIA |
2012 |
142 | TYPE E'BOOSTER COMPRESSOR PACKAGE | CHEVRON THAILAND EXPLORATION & PRODUCTION LTD | SE 2:1 HEADS | SA516 GR.70N | THAILAND | 2012 |
143 | LPG REFRIGERATED STORAGE | PETROVIETNAM GAS CORPORATION | FITTING,FLANGE, BOLT/NUT,GASKET |
A234WPB/A105N | 30TON VIETNAM |
2012 |
144 | MAIBARARA GEOTHERMAL POWER PLANT | MAIBARARAGEOTHERMAL, INC | SEAMLESS/ERW/LSAW PIPE,FITTING,FLANGE | API 5L-B/A234WPB/A105N | 190TON PHILIPPINE |
2012 |
145 | HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT | PETROVIETNAM TECHNICAL SERVICES | FITTING,FLANGE, FORGED FITTING |
A234WPB/A420WPL6/A105/ A182F316L/A403WP304 |
40TON VIETNAM |
2012 |
146 | MAINTENANCE | CONOCO PHILIPS | U-TUBE | A789 TP31803 | 50TON INDONESIA |
2012 |
147 | MAINTENANCE | CONOCO PHILIPS | TUBESHEET,NOZZLE, FLANGE |
SA266 GR 4N/SA105N/SA182F316L | 45TON INDONESIA |
2012 |
No | PROJECT | CLIENT/CONTRACTOR | SUPPLIED ITEM | MATERIAL | QUANTITY/ COUNTRY |
YEAR |
1 | CONTRACT 68/5437/QR-01/2012 (AL-MOUSEL POWER STATION PROJECT) |
SCOP (STATE COMPANY FOR OIL PROJECT) |
SAW PIPE | API 5L X60 PSL2 LSAW PIPE (DEALING IN COMMISSION BASE) |
7332TON IRAQ |
2013 |
2 | JG SUMMIT PE CAPACITY EXPANSION PROJECT | UNKNOWN | FITTINGS,FLANGES | A105,A234 WPB,A403 WP304L | PHILIPPINES | 2013 |
3 | SMPC3 RX PROJECT | SIAM MITSUI PTA CO., LTD. (SMPC) | FITTINGS,FORGED FITTINGS | A105,A182 F304,A182 F316L,A403 WP316L | THAILAND | 2013 |
4 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS | FITTINGS,FLANGES | A105N,A350 LF2,A182 F51,A182 F316L,A815 S31803 | MALAYSIA | 2013 |
5 | JG SUMMIT PE CAPACITY EXPANSION PROJECT | UNKNOWN | BEND | A312 TP304 BEND | PHILIPPINES | 2013 |
6 | SBM PRODUCTION CONTRACTORS | SIAKAP NORTH-PETAI DEVELOPMENT EPCIC | FITTING,FLANGE,BEND,FORGED FITTING | A815 S31803,A403 WP316L,A105N,A182 F53,A182 F316L,A106 GR.B, | MALAYSIA | 2013 |
7 | SBM PRODUCTION CONTRACTORS | SIAKAP NORTH-PETAI DEVELOPMENT EPCIC | FITTING,FLANGE,FORGED FITTING | A694 F60,A240 GR.316,A516 GR.70,A403 WP316L,A105N,A694 F52,182 F316 | MALAYSIA | 2013 |
8 | SBM PRODUCTION CONTRACTORS | SIAKAP NORTH-PETAI DEVELOPMENT EPCIC | FLANGE | A/SA105N,A182 F316/316L,A350 LF2,A516 GR70N | MALAYSIA | 2013 |
9 | JG SUMMIT PE CAPACITY EXPANSION PROJECT | UNKNOWN | FLANGE,FORGED FITTING | A105,A182 F316L,A182 F304/L | THAILAND | 2013 |
10 | ETHANOL PROJECT | UNKNOWN | FLANGES | A105 | THAILAND | 2013 |
11 | SMPC3 RX PROJECT | SIAM MITSUI PTA CO., LTD. (SMPC) | EFW PIPES | A312 TP316L | THAILAND | 2013 |
12 | TOYOBO VYLON PROJECT | TOYO-THAI CORPORATION PUBLIC CO., LTD | FLANGES | A182 F304 | THAILAND | 2013 |
13 | BOOSTER COMPERESSION PROJECT | CARIGALI HESS OPERATING COMPANY SDN.BHD | FLANGES | A182 F51,A350 LF2 | MALAYSIA | 2013 |
14 | Design & Supply of Gas & Condensate Metering System for D12, Laila, F14,F29 Project | SHELL SARAWAK BERHAD | PIPES | A790/A928 S31803 PIPES | SINGAPORE | 2013 |
15 | PCEMSB-BOILER FEED WATER COOLER | PETRONAS CHEMICAL ETHYLENE MALAYSIA SDN BHD | BAFFLE PLATE | A36 | MALAYSIA | 2013 |
16 | MICCO AN PROJECT | UNKNOWN | FITTINGS,FORGED FITTINGS | A420 WPL6,F304L,105 | THAILAND | 2013 |
17 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS | FITTINGS | A420 WPL6 SOUR | MALAYSIA | 2013 |
18 | JG SUMMIT PE CAPACITY EXPANSION PROJECT | UNKNOWN | FORGED FITTINGS | A105 | THAILAND | 2013 |
19 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS | FLANGES | A182 F51 | MALAYSIA | 2013 |
20 | BOOSTER COMPERESSION PROJECT | CARIGALI HESS OPERATING COMPANY SDN.BHD | FLANGES, FLANGOLET | A240 UNS S31803,A182 F316L,A182 F51 | MALAYSIA | 2013 |
21 | SBM PRODUCTION CONTRACTORS | SIAKAP NORTH-PETAI DEVELOPMENT EPCIC | FITTING,FLANGE,FORGED FITTING | A403 WP316L,A815 S31803,A182 WP316L,A350 LF2,A694 F52,A105N,A182 F53,A694 F60 | MALAYSIA | 2013 |
22 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS | FITTINGS | A403 WP316L,A815 S31803, A694 F65 | MALAYSIA | 2013 |
23 | TURKMENISTAN BLOCK 1 PROJECT | PETRONAS CARIGALI SDN. BHD | FLANGES,FITTINGS | A815 UNS S31803,A182 F51 | MALAYSIA | 2013 |
24 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS | FLANGE, FITTING | A403 WP316L,A815 S31803,A182 F51, A350 LF2,A105N | MALAYSIA | 2013 |
25 | JG SUMMIT PE CAPACITY EXPANSION PROJECT | UNKNOWN | FITTINGS | A234 WPB,A403 WP304L | THAILAND | 2013 |
26 | FOSTER SPRC PROJECT | UNKNOWN | VALVE | A217 C5, A351 CF8C | THAILAND | 2013 |
27 | SBM PRODUCTION CONTRACTORS | SIAKAP NORTH-PETAI DEVELOPMENT EPCIC | FITTING,FLANGE | A815 S32750,A105,A240 GR316,A694 F52,A182 F316L | MALAYSIA | 2013 |
28 | TAPIS PROJECT | EXXONMOBIL EXPLORATION & PRODUCTION MALAYSIA | FITTINGS | A815 UNS S31803, A815 S32760 | MALAYSIA | 2013 |
29 | SBM PRODUCTION CONTRACTORS | SIAKAP NORTH-PETAI DEVELOPMENT EPCIC | FITTING,FLANGE | A815 S31803,A403 WP316LA105N, A350 LF2,A240 S32750,A694 F52,182 F51 | MALAYSIA | 2013 |
30 | TAPIS PROJECT | EXXONMOBIL EXPLORATION & PRODUCTION MALAYSIA | FITTINGS | A403 WP316L | MALAYSIA | 2013 |
31 | GAS PIPELINE AND GAS METERING AND REGULATING STATION PROJECT | SIAMRAJATHANEE JOINT VENTURE | FORGED FITTINGS | A105, A106 B | THAILAND | 2013 |
32 | UNKNOWN | PETRONAS | FLANGES, FORGED FITTIGNS | A182 F51, A240 S318103 | MALAYSIA | 2013 |
33 | THE EPC SERVICES FOR PIPING AND E&I CABLE REROUTE PROJECT | PTT PUBLIC CO., LTD | 3LPE SMLS, ERW PIPE/FITTING,FORGED FITTING | API 5L B,A106 GR.B,A333 GR.6,A234 WPB,A420 WPL6,A105 | THAILAND | 2013 |
34 | OGT PTSM 184 PROJECT | UNKNOWN | FITTINGS, FLANGES | A350 LF2, A105N | MALAYSIA | 2013 |
35 | TALISMAN PROJECT | TALISMAN | FITTINGS, FLANGES | A815 UNS S32750, A182 F53 | MALAYSIA | 2013 |
36 | F14-DRA PROJECT | SHELL GLOBAL SOLUTIONS | FLANGE, FITTING | A403 WP316L,A182 F316/316L, A350 LF2, A420 WPL6 | MALAYSIA | 2013 |
37 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS | FLANGE, FITTING | A182 F316,A694 F65,A182 F51, A350 LF2, A420 WPL6 | MALAYSIA | 2013 |
38 | DPCU-2 PROJECT | PETRONAS GAS SDN BHD | FLANGES | A105 BLANK, SPACER | MALAYSIA | 2013 |
39 | ZUHAL EAST DEVEPROJECT | PETRONAS CARIGALI SDN. BHD | BLEED RING,SPECTACLE BL | A105N, A516 GR.60 | MALAYSIA | 2013 |
40 | CHESS-BULAN-C PROJECT | THAI NIPPON STEEL&SUMIKIN ENGINEERING&CONSTRUCTION | FORGED FITTINGS | A105N, A350 LF2 | THAILAND | 2013 |
41 | JKC ICHTHYS PROJECT | JKC AUSTRALIA LNG PTY LTD | FORGED FITTINGS,FLANGES | A105 | THAILAND | 2013 |
42 | PCML-NEW-MAINTENANCE SERVICE CONTRACT | THAI NIPPON STEEL&SUMIKIN ENGINEERING&CONSTRUCTION | PIPE,FITING,FLANGE,FORGED FITTING | A928 S31803,A182 F316L,F51,A403 WP316L | THAILAND | 2013 |
43 | ARUN LNG RECEIVING HUB & REGASIFICATION TERMINAL | PT PERTAMINA | FITTING, FORGED FITTING | A182 F304, A403 WP304 | INDONESIA | 2013 |
44 | BULAN C WELLHEAD PLATFORM GAS DEVELOPMENT | CARIGALI HESS OPERATING COMPANY SDN.BHD | FLANGES | A182 F51, A350 LF2, A105, A516 GR.70 | MALAYSIA | 2013 |
45 | THE EPC SERVICES FOR PIPING AND E&I CABLE REROUTE PROJECT | PTT PUBLIC CO., LTD | FLANGES | A105 | THAILAND | 2013 |
46 | SBM PRODUCTION CONTRACTORS | SIAKAP NORTH-PETAI DEVELOPMENT EPCIC | FLANGE | A694 F52 | MALAYSIA | 2013 |
47 | NONE | PTT THAILAND | 2:1 HEAD | SA516-GR.70N | TAIILAND | 2013 |
48 | NONE | PT. PERTAMINA PATRA NIAGA | ERW PIPE | API 5L-B | JAKARTA | 2013 |
49 | NONE | SOUTHWEST FILTERS | FLANGE | SA350 LF2 CL.1 | USA | 2013 |
50 | NONE | CURTIS KELLY | Q-LIP FORGING/FLANGE | SA350 LF2 CL.1/A182F304L | USA | 2013 |
51 | CROSS COUNTRY PIPELINE PROJECT | PERTAMINA RU IV-CILACAP | HOT INDUCTION BEND | A106GR.B | JAKARTA | 2013 |
52 | BARU NIRU PROJECT | KRAKATAU ENGINEERING | FITTING,FLANGE | A234WPB,A105 | JAKARTA | 2013 |
53 | BP MINI LNG TANGGUH PROJECT | JGC INDONESIA | EFW PIPE | A358 TP304CL1 | JAKARTA | 2013 |
54 | BANYU URIP PROJECT | MOBIL CEPU LTD. | NOZZLE FORGING /FLANGE | SA105N/ASA350LF2CL.1 | JAKARTA | 2013 |
55 | BANYU URIP PROJECT | MOBIL CEPU LTD. | SAW PIPE | API5LGR.B PSL2 (SOUR/NON-SOUR) | JAKARTA | 2013 |
56 | SENORO GAS DEVELOPMENT PROJECT | PERTAMINA MEDCO E&P TOMORI SULAWESI | NOZZLE FORGING | SA105N/ASA350LF2CL.1 | JAKARTA | 2013 |
57 | SENORO GAS DEVELOPMENT PROJECT | PERTAMINA MEDCO E&P TOMORI SULAWESI | SAW PIPE | API5LGR.B PSL2 (SOUR/NON-SOUR) | JAKARTA | 2013 |
58 | M.H.I | TAIWAN LIN KOU | TUBESHEET | SA266GR.2 | TAIWAN | 2013 |
59 | AI-MOUSEL POWER STATION PROJECT |
S.C.O.P | COATED HOT INDUCTION BEND |
API 5L X60 PSL2 | 300 TONS IRAQ |
2013 |
60 | TAJI-NINAWA POWER STATION PROJECT |
S.C.O.P | COATED HOT INDUCTION BEND |
API 5L X60 PSL2 | 200 TONS IRAQ |
2013 |
61 | NONE | THAI NIPPON STEEL&SUMIKIN ENGINEERING&CONSTRUCTION | FLANGE | A182 F51 | THAILAND | 2013 |
62 | MHI/GUT PROJECT | NONE | FITTING,FORGED FITTING,PIPE | A105, A182 F304,A182 F316,A312 TP316 | THAILAND | 2013 |
63 | FLOWLINE OIL&GAS | NONE | FITTING | A815 UNS S32750 | MALAYSIA | 2013 |
64 | EPCIC OF JDA GAS BALANCING EVACUATION PROJECT | TRANS THAI MALAYSIA | FLANGES | A350 LF2, A516 GR.70 | MALAYSIA | 2013 |
65 | BUTADIENE TRANSFER LINE FROM T-3 TO R1 | TITAN PETCHEM PASIR GUDANG | HDPE PU FORM,3LPE COATING PIPE SMLS | A333 GR.6 | MALAYSIA | 2013 |
66 | POLYBUTYLENE SUCCINATE PLANT PROJECT | PTT MCC BIOCHEM | BEND | A53 GR.B | THAILAND | 2013 |
No | PROJECT | CLIENT/CONTRACTOR | PRODUCT | MATERIAL | QUANTITY/ COUNTRY |
YEAR |
1 | PCD -II PROJECT | UBE GROUP(THAILAND) | JACKETED FLANGE | 2019 | ||
2 | JG SUMMIT PE CAPACITY EXPANSION PROJECT | UNKNOWN | FITTINGS,FLANGES | A105,A234 WPB,A403 WP304L | PHILIPPINES | 2013 |
3 | SMPC3 RX PROJECT | SIAM MITSUI PTA CO., LTD. (SMPC) | FITTINGS,FORGED FITTINGS | A105,A182 F304,A182 F316L,A403 WP316L | THAILAND | 2013 |
4 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS | FITTINGS,FLANGES | A105N,A350 LF2,A182 F51,A182 F316L,A815 S31803 | MALAYSIA | 2013 |
5 | JG SUMMIT PE CAPACITY EXPANSION PROJECT | UNKNOWN | BEND | A312 TP304 BEND | PHILIPPINES | 2013 |
6 | SBM PRODUCTION CONTRACTORS | SIAKAP NORTH-PETAI DEVELOPMENT EPCIC | FITTING,FLANGE,BEND,FORGED FITTING | A815 S31803,A403 WP316L,A105N,A182 F53,A182 F316L,A106 GR.B, | MALAYSIA | 2013 |
7 | SBM PRODUCTION CONTRACTORS | SIAKAP NORTH-PETAI DEVELOPMENT EPCIC | FITTING,FLANGE,FORGED FITTING | A694 F60,A240 GR.316,A516 GR.70,A403 WP316L,A105N,A694 F52,182 F316 | MALAYSIA | 2013 |
8 | SBM PRODUCTION CONTRACTORS | SIAKAP NORTH-PETAI DEVELOPMENT EPCIC | FLANGE | A/SA105N,A182 F316/316L,A350 LF2,A516 GR70N | MALAYSIA | 2013 |
9 | JG SUMMIT PE CAPACITY EXPANSION PROJECT | UNKNOWN | FLANGE,FORGED FITTING | A105,A182 F316L,A182 F304/L | THAILAND | 2013 |
10 | ETHANOL PROJECT | UNKNOWN | FLANGES | A105 | THAILAND | 2013 |
11 | SMPC3 RX PROJECT | SIAM MITSUI PTA CO., LTD. (SMPC) | EFW PIPES | A312 TP316L | THAILAND | 2013 |
12 | TOYOBO VYLON PROJECT | TOYO-THAI CORPORATION PUBLIC CO., LTD | FLANGES | A182 F304 | THAILAND | 2013 |
13 | BOOSTER COMPERESSION PROJECT | CARIGALI HESS OPERATING COMPANY SDN.BHD | FLANGES | A182 F51,A350 LF2 | MALAYSIA | 2013 |
14 | Design & Supply of Gas & Condensate Metering System for D12, Laila, F14,F29 Project | SHELL SARAWAK BERHAD | PIPES | A790/A928 S31803 PIPES | SINGAPORE | 2013 |
15 | PCEMSB-BOILER FEED WATER COOLER | PETRONAS CHEMICAL ETHYLENE MALAYSIA SDN BHD | BAFFLE PLATE | A36 | MALAYSIA | 2013 |
16 | MICCO AN PROJECT | UNKNOWN | FITTINGS,FORGED FITTINGS | A420 WPL6,F304L,105 | THAILAND | 2013 |
17 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS | FITTINGS | A420 WPL6 SOUR | MALAYSIA | 2013 |
18 | JG SUMMIT PE CAPACITY EXPANSION PROJECT | UNKNOWN | FORGED FITTINGS | A105 | THAILAND | 2013 |
19 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS | FLANGES | A182 F51 | MALAYSIA | 2013 |
20 | BOOSTER COMPERESSION PROJECT | CARIGALI HESS OPERATING COMPANY SDN.BHD | FLANGES, FLANGOLET | A240 UNS S31803,A182 F316L,A182 F51 | MALAYSIA | 2013 |
21 | SBM PRODUCTION CONTRACTORS | SIAKAP NORTH-PETAI DEVELOPMENT EPCIC | FITTING,FLANGE,FORGED FITTING | A403 WP316L,A815 S31803,A182 WP316L,A350 LF2,A694 F52,A105N,A182 F53,A694 F60 | MALAYSIA | 2013 |
22 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS | FITTINGS | A403 WP316L,A815 S31803, A694 F65 | MALAYSIA | 2013 |
23 | TURKMENISTAN BLOCK 1 PROJECT | PETRONAS CARIGALI SDN. BHD | FLANGES,FITTINGS | A815 UNS S31803,A182 F51 | MALAYSIA | 2013 |
24 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS | FLANGE, FITTING | A403 WP316L,A815 S31803,A182 F51, A350 LF2,A105N | MALAYSIA | 2013 |
25 | JG SUMMIT PE CAPACITY EXPANSION PROJECT | UNKNOWN | FITTINGS | A234 WPB,A403 WP304L | THAILAND | 2013 |
26 | FOSTER SPRC PROJECT | UNKNOWN | VALVE | A217 C5, A351 CF8C | THAILAND | 2013 |
27 | SBM PRODUCTION CONTRACTORS | SIAKAP NORTH-PETAI DEVELOPMENT EPCIC | FITTING,FLANGE | A815 S32750,A105,A240 GR316,A694 F52,A182 F316L | MALAYSIA | 2013 |
28 | TAPIS PROJECT | EXXONMOBIL EXPLORATION & PRODUCTION MALAYSIA | FITTINGS | A815 UNS S31803, A815 S32760 | MALAYSIA | 2013 |
29 | SBM PRODUCTION CONTRACTORS | SIAKAP NORTH-PETAI DEVELOPMENT EPCIC | FITTING,FLANGE | A815 S31803,A403 WP316LA105N, A350 LF2,A240 S32750,A694 F52,182 F51 | MALAYSIA | 2013 |
30 | TAPIS PROJECT | EXXONMOBIL EXPLORATION & PRODUCTION MALAYSIA | FITTINGS | A403 WP316L | MALAYSIA | 2013 |
31 | GAS PIPELINE AND GAS METERING AND REGULATING STATION PROJECT | SIAMRAJATHANEE JOINT VENTURE | FORGED FITTINGS | A105, A106 B | THAILAND | 2013 |
32 | UNKNOWN | PETRONAS | FLANGES, FORGED FITTIGNS | A182 F51, A240 S318103 | MALAYSIA | 2013 |
33 | THE EPC SERVICES FOR PIPING AND E&I CABLE REROUTE PROJECT | PTT PUBLIC CO., LTD | 3LPE SMLS, ERW PIPE/FITTING,FORGED FITTING | API 5L B,A106 GR.B,A333 GR.6,A234 WPB,A420 WPL6,A105 | THAILAND | 2013 |
34 | OGT PTSM 184 PROJECT | UNKNOWN | FITTINGS, FLANGES | A350 LF2, A105N | MALAYSIA | 2013 |
35 | TALISMAN PROJECT | TALISMAN | FITTINGS, FLANGES | A815 UNS S32750, A182 F53 | MALAYSIA | 2013 |
36 | F14-DRA PROJECT | SHELL GLOBAL SOLUTIONS | FLANGE, FITTING | A403 WP316L,A182 F316/316L, A350 LF2, A420 WPL6 | MALAYSIA | 2013 |
37 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS | FLANGE, FITTING | A182 F316,A694 F65,A182 F51, A350 LF2, A420 WPL6 | MALAYSIA | 2013 |
38 | DPCU-2 PROJECT | PETRONAS GAS SDN BHD | FLANGES | A105 BLANK, SPACER | MALAYSIA | 2013 |
39 | ZUHAL EAST DEVEPROJECT | PETRONAS CARIGALI SDN. BHD | BLEED RING,SPECTACLE BL | A105N, A516 GR.60 | MALAYSIA | 2013 |
40 | CHESS-BULAN-C PROJECT | THAI NIPPON STEEL&SUMIKIN ENGINEERING&CONSTRUCTION | FORGED FITTINGS | A105N, A350 LF2 | THAILAND | 2013 |
41 | JKC ICHTHYS PROJECT | JKC AUSTRALIA LNG PTY LTD | FORGED FITTINGS,FLANGES | A105 | THAILAND | 2013 |
42 | PCML-NEW-MAINTENANCE SERVICE CONTRACT | THAI NIPPON STEEL&SUMIKIN ENGINEERING&CONSTRUCTION | PIPE,FITING,FLANGE,FORGED FITTING | A928 S31803,A182 F316L,F51,A403 WP316L | THAILAND | 2013 |
43 | ARUN LNG RECEIVING HUB & REGASIFICATION TERMINAL | PT PERTAMINA | FITTING, FORGED FITTING | A182 F304, A403 WP304 | INDONESIA | 2013 |
44 | BULAN C WELLHEAD PLATFORM GAS DEVELOPMENT | CARIGALI HESS OPERATING COMPANY SDN.BHD | FLANGES | A182 F51, A350 LF2, A105, A516 GR.70 | MALAYSIA | 2013 |
45 | THE EPC SERVICES FOR PIPING AND E&I CABLE REROUTE PROJECT | PTT PUBLIC CO., LTD | FLANGES | A105 | THAILAND | 2013 |
46 | SBM PRODUCTION CONTRACTORS | SIAKAP NORTH-PETAI DEVELOPMENT EPCIC | FLANGE | A694 F52 | MALAYSIA | 2013 |
47 | NONE | PTT THAILAND | 2:1 HEAD | SA516-GR.70N | TAIILAND | 2013 |
48 | NONE | PT. PERTAMINA PATRA NIAGA | ERW PIPE | API 5L-B | JAKARTA | 2013 |
49 | NONE | SOUTHWEST FILTERS | FLANGE | SA350 LF2 CL.1 | USA | 2013 |
50 | NONE | CURTIS KELLY | Q-LIP FORGING/FLANGE | SA350 LF2 CL.1/A182F304L | USA | 2013 |
51 | CROSS COUNTRY PIPELINE PROJECT | PERTAMINA RU IV-CILACAP | HOT INDUCTION BEND | A106GR.B | JAKARTA | 2013 |
52 | BARU NIRU PROJECT | KRAKATAU ENGINEERING | FITTING,FLANGE | A234WPB,A105 | JAKARTA | 2013 |
53 | BP MINI LNG TANGGUH PROJECT | JGC INDONESIA | EFW PIPE | A358 TP304CL1 | JAKARTA | 2013 |
54 | BANYU URIP PROJECT | MOBIL CEPU LTD. | NOZZLE FORGING /FLANGE | SA105N/ASA350LF2CL.1 | JAKARTA | 2013 |
55 | BANYU URIP PROJECT | MOBIL CEPU LTD. | SAW PIPE | API5LGR.B PSL2 (SOUR/NON-SOUR) | JAKARTA | 2013 |
56 | SENORO GAS DEVELOPMENT PROJECT | PERTAMINA MEDCO E&P TOMORI SULAWESI | NOZZLE FORGING | SA105N/ASA350LF2CL.1 | JAKARTA | 2013 |
57 | SENORO GAS DEVELOPMENT PROJECT | PERTAMINA MEDCO E&P TOMORI SULAWESI | SAW PIPE | API5LGR.B PSL2 (SOUR/NON-SOUR) | JAKARTA | 2013 |
58 | M.H.I | TAIWAN LIN KOU | TUBESHEET | SA266GR.2 | TAIWAN | 2013 |
59 | AI-MOUSEL POWER STATION PROJECT |
S.C.O.P | COATED HOT INDUCTION BEND |
API 5L X60 PSL2 | 300 TONS IRAQ |
2013 |
60 | TAJI-NINAWA POWER STATION PROJECT |
S.C.O.P | COATED HOT INDUCTION BEND |
API 5L X60 PSL2 | 200 TONS IRAQ |
2013 |
61 | NONE | THAI NIPPON STEEL&SUMIKIN ENGINEERING&CONSTRUCTION | FLANGE | A182 F51 | THAILAND | 2013 |
62 | MHI/GUT PROJECT | NONE | FITTING,FORGED FITTING,PIPE | A105, A182 F304,A182 F316,A312 TP316 | THAILAND | 2013 |
63 | FLOWLINE OIL&GAS | NONE | FITTING | A815 UNS S32750 | MALAYSIA | 2013 |
64 | EPCIC OF JDA GAS BALANCING EVACUATION PROJECT | TRANS THAI MALAYSIA | FLANGES | A350 LF2, A516 GR.70 | MALAYSIA | 2013 |
65 | BUTADIENE TRANSFER LINE FROM T-3 TO R1 | TITAN PETCHEM PASIR GUDANG | HDPE PU FORM,3LPE COATING PIPE SMLS | A333 GR.6 | MALAYSIA | 2013 |
66 | POLYBUTYLENE SUCCINATE PLANT PROJECT | PTT MCC BIOCHEM | BEND | A53 GR.B | THAILAND | 2013 |