STEEL WORLD CO., LTD
ONE-STOP SHOP FOR ALL KINDS OF PIPINGS MATERIALS
STEEL WORLD CO., LTD WILL CONTINUOUSLY DO ALL IT S BEST IN ORDER TO PROVIDE YOU WITH MOST
SATISFACTORY SERVICE FROM THE TIME OF RECEMING ENQUIRY TO THE PERFECT MANAGEMENT OF LOGISTICS.
No | PROJECT | CLIENT/CONTRACTOR | PRODUCT | MATERIAL | QUANTITY/ COUNTRY |
YEAR |
1 | PANAMA COLON POWER PROJECT | GANA (GAS NATURAL ATLANTICO S.de R.L) | MITRE BEND c/w INTERNAL & EXTERNAL COATING | A283-C | PANAMA | 2017 |
2 | GRATI BLOCK 2 150NW PASURUAN JAWA TIMUR | PT. PP | ANSI & AWWA C207 FLANGES | A105N | INDONESIA | 2017 |
3 | DFSB-MRU INTEGRATION PROJECT | HESS OIL & GAS SDN. BHD | FLANGE | SA182F316L | MALAYSIA | 2019 |
4 | RU IV CILACAP | PT PERTAMINA CILACAP | ALLOY FLANGE | ASTM 5 CHROME | INDONESIA | 2017 |
5 | PETRONAS RAPID PROJECT( FEED PHASE) | TECHNIP | FLANGE/FITTING | A234WPB/A420WPL6/A105/A350LF2 | SINGAPORE | 2017 |
6 | SUBAN COMPRESSION PROJECT | PT ZONETA PRIMA ABADI | NOZZLE | A182F316L, A403WP316L | INDONESIA | 2017 |
7 | JASA PERANCANGAN, PENGADAAN, KONSTRUKSI, DANPEMBANGUNAN PIPA GAS GRISSIK - PUSRI | PERTAMINA GAS | SPEC. BLIND & FLANGES | ASTM A285 GR.C/A105/A694F65 | INDONESIA | 2017 |
8 | PROYEK PUSRI TIE-IN MS TAHAP 2 | PT PUSRI PALEMBANG | FLANGE | ASTM A182 F11/F304/A105 | INDONESIA | 2017 |
9 | UMBULAN JAWA TIMUR | PT. CITRA PANJI MANUNGGUL | DIN FLANGE | CS | INDONESIA | 2017 |
10 | SUBAN COMPRESSION PROJECT | PT.IKPT & CONOCOPHILLIPS | NOZZLES | SA350 LF2 | INDONESIA | 2017 |
11 | BATU RADEN PROJECT | PT. CITRA BANGUN NUSANTARA | SAW PIPE | API 5L X42 | INDONESIA | 2017 |
12 | TAM DAO 05 JACK-UP RIG | VIETSOVPETRO | INSULATION PIN/BOARD ETC | COPPER COATED | VIETNAM | 2017 |
13 | GAS TO GASOLINE PLANT IN AKHAL VELAYAT | TURKMENGAS | SUS PIPE | A182-F304, A403 Gr.WP316/316L, ASTM A182-F304, | TURKMENISTAN | 2019 |
14 | OGDCL OIL AND GAS | UNKNOWN | PLATE | ASTM A36 | PAKISTAN | 2017 |
15 | PMRC PROJECT | PETRONAS CARIGALI SDN BHD | FLANGE | A105N | MALAYSIA | 2017 |
16 | RENOVATION PROJECT | ASIA SILICONE MONOMER LIMITED | BW FITTING | A403 GR.WP304 | THAILAND | 2017 |
17 | BUNGA PAKMA A WELLHEAD RISER PLATFORM (BP-A WHRP) PROJECT | TALISMAN MALAYSIA | FLANGE, FORGED FITTING | A182 F51 | MALAYSIA | 2017 |
18 | LLDPE EXPANSION AND HEXENE-1 PROJECT | TTCL PUBLIC COMPANY LIMITED | SPECTACLE BLIND | A105, A182 F11 CL.2 | THAILAND | 2017 |
19 | PETRONAS | PETRONAS | HANGER FLANGE | A694 F65 | MALAYSIA | 2017 |
20 | HYDROGEN GAS PROJECT | AIR LIQUID | FITTING, FLANGE, FORGED FITTING | A234 WPB, WP304/L, A105N | DUBAI | 2017 |
21 | PETRONAS UGCE PROJECT | PETRONAS | FITTING, FLANGE, FORGED FITTING | A234 WPB, WP11, A182 F11, A516 60, A240 TP316, A182 F316, A105N | MALAYSIA | 2017 |
22 | COMBUSTION CHAMBER, WIND FENCE, PROCESS PARTS & VENT STACK | SAMSUNG PTT WANG NOI, THAILAND | FLANGE, FORGED FITTING, FITTING, PLATE | A350 LF2, A420 WPL6, SA516 70, SA516 70N + S5 | VIETNAM | 2017 |
23 | GOLF NGD PROJECT | PTT | PIPE, FITTING | API 5L X42 PSL.1, A234 WPB | THAILAND | 2017 |
24 | REACTORS 1,2 & 3 | BWFS | CUSTOM FORGING,FLANGE,BOLT/NUTS | SA182F304H,SA453GR.660TYPEB,SA193-B8M,SA194-GR.8 | USA | 2017 |
25 | 1ST & 2ND STAGE SUCTION & DISCHARGE BOTTLES | NEUMAN&ESSER | FLANGE,FORGING | SA182F304/L,SA182F316/L | USA | 2017 |
26 | 6X20 3 PHASE SEP VESSELS 2017 DEMAND PLAN | OCCIDENTAL PERMIAN LTD | NOZZLE,BOLT/NUTS | SA105,SA193-B8M,SA194-8M,SA193- B7M,SA194-2HM | USA | 2017 |
27 | UNKNOWN | DUPONT | SMLS TUBE | SA213 TP316H | USA | 2017 |
28 |
PETRONAS RAPID PROJECT (Package No. 5-EPCC of Steam Cracker Complex) |
TOYO ENGINEERING | FITTING,FLANGE | A234WPB/A420WPL6/A105/A350LF2 | SINGAPORE | 2016 |
29 | GRESIK-LAMONGAN-TUBAN DISTRIBUTION PIPELINE PROJECT PHASE (CP-21A) | PT.PERUSAHAAN GAS NEGARA (PGN) | 3D BEND | API 5L-X65 PSL2 | INDONESIA | 2016 |
30 | PEMBANGUNAN FASILITAS PRODUKSI PAKUGAJAH DEVELOPMENT PROJECT |
PT PERTAMINA EP | SPECTACLE BLIND, BLANK & SPACER | A240 F304, A516-70 | INDONESIA | 2016 |
31 | BERGADING NORTH MALAY PROJECT | EA TECHNIQUE / MMHE | FLANGE | SA105N (FOR MARINE) | MALAYSIA | 2016 |
32 | ULUBELU UNIT 3&4 GEOTHERMAL POWER PROJECT | PT. PERTAMINA GEOTHEERMAL ENERGY | FITTING,FLANGE | A105 | INDONESIA | 2016 |
33 | BPETRONAS RAPID PROJECT (REFINERY TANK FARM) |
PETRONAS/PUNJ LLOYD | FITTING, FLANGE | A234WPB/A420WPL6/A105/A350LF2 | SINGAPORE | 2016 |
34 | BANGGAI AMMONIA PLANT PROJECT | PT PANCA AMARA UTAMA | FITTING,FLANGE | A105/F304/F51/A234WPB/S31803 | INDONESIA | 2016 |
35 | EPSCC of TWO CONVERTED FPSO (FPSO NORTH & SOUTH) |
TOTAL E&P ANGOLA BLOCK 32 | FLANGE | SFVC 2A (N) / A105N / A516-70 (FOR MARINE) |
SINGAPORE | 2016 |
36 | SW305M | DUPONT | SMLS TUBE | SA213 TP316H | USA | 2016 |
37 | GISSAR PROJECT | KNM PROCESS SYSTEMS SDN BHD | FLANGES | A350 LF2 CL1/SA105/SA420 WPL6 | MALAYSIA | 2016 |
38 | GISSAR PROJECT | KNM PROCESS SYSTEMS SDN BHD | FLANGES | SA182 F316/L | MALAYSIA | 2016 |
39 | GISSAR PROJECT | KNM PROCESS SYSTEMS SDN BHD | PIPES, FITTINGS AND FLANGES | API 5I B/A105/A182 F316 | MALAYSIA | 2016 |
40 | GISSAR PROJECT | KNM PROCESS SYSTEMS SDN BHD | SMLS PIPE | API 5L GR.B/SA333 GR6/SA312 316/L | MALAYSIA | 2016 |
41 | TAM DAO 05 JACK-UP RIG | VIETSOVPETRO | PIPING, FITTING | ASTM A106 GR.B/ A312 Gr.TP 316/316L,A403 Gr.WP316/316L, | VIETNAM | 2016 |
42 | PROJECT, NORTH MALAY BASIN | UNKNOWN | VALVES | A216-WCB, AL-BRONZE, ASTM B148 UNS C95800 | MALAYSIA | 2016 |
43 | TAM DAO 05 JACK-UP RIG | VIETSOVPETRO | PIPING | ASTM A106 GR.B/ A312 Gr.TP 316/316L | VIETNAM | 2016 |
44 | UNKNOWN | (LOCAL) -STOCKIEST | ERW PIPES | KS D3507 SPP, JIS G3454 STPG 37 | KOREA (LOCAL) | 2016 |
45 | GAS TO GASOLINE PLANT IN AKHAL VELAYAT |
TURKMENGAS | EFW, ERW, SMLS PIPES | ASTM A139-B, ASTM A53-B | TURKMENISTAN | 2016 |
46 | DAMAN PROJECT | ONGC INDIA | ERW, SAW PIPES | API-5L-Grade B, ASTM-A-36, API-2W-Gr.50 | VIETNAM | 2016 |
47 | OGDCL OIL AND GAS | UNKNOWN | PLATE | ASTM A36 | PAKISTAN | 2016 |
48 | UNKNOWN | UNKNOWN | PLATE | API SPEC 5L X52M PSL2 S1, S3, S5 | VIETNAM | 2016 |
49 | EPCIC OF REMOTE WHPS FOR FULL FIELD DEVELOPMENT NORTH MALAY BASIN | HESS ECPLORATION & PRODUCTION MALAYSIA B.V. | FLANGOLET,SPECTACLE BLIND,FLANGES AND FITTINGS | UNS S32760,S31803,WP316L,A182 F51,F55 | MALAYSIA | 2016 |
50 | ROC DEBOTTLENECKING PJT | RAYONG OLEFINS CO., LTD. | PIPE, FITTING AND FLANGE | A672 GR.B60, A106, A234 WPB, A105, 3 LAYER PE COATING | THAILAND | 2016 |
51 | CATCHER FPSO PROJECT | BW CATCHER LTD | SPECTACLE BLIND FLAGNES | A516 GR70, A240 316/316L | THAILAND | 2016 |
52 | JAZAN IGCC POWER BLOCK PROJECT | SAUDI ARAMCO | FORGED FITTINGS | A105,WPB,A403 WP304/304L,A815 UNSS S32205S,A312 P316/316L,A182 F316/316L | SAUDI ARABIA | 2016 |
53 | EPCC OF F12 FACILITIES | PETRONAS CARIGALI SDN BHD MMHE | FITTING,FLANGE | WP316/L, S31803, A105, A182 F51, SA350 LF2, A240 S31803, TP316/L, A516 70 | MALAYSIA | 2016 |
54 | RAPID# 5 (Job# ITT-1728) |
UNKNOWN | FLANGE, PIPE, FITTING, GASKET | SA350 LF2, A312 TP304/L, A234 WPB, 316L | VIETNAM | 2016 |
55 | OPHIR FIELD RSC DEVELOPMENT | PETRONAS MUHIBBAH ENGINEERING (M) BHD |
FITTING, FLANGE | WP316/L, F316/L | MALAYSIA | 2016 |
56 | SMALL FIELD RISK SERVICE CONTRACT | PETRONAS MUHIBBAH ENGINEERING (M) BH |
FITTING,FLANGE | WP316/L, F316/L | MALAYSIA | 2016 |
57 | MAEMOH POWER PLANT PROJECT | BLACK ANS BEACH | PIPE,FITTING,FLANGE | A106,A53 B,A312 TP316L,A105,WPB,A182 F304L | THAILAND | 2016 |
58 | SUPPLT OF MERCURY REMOVAL UNIT FOR SK310 B15 DEVELOPMENT | DIALOG | FLANGE, FITTING | SA350 LF2, SA420 WPL6 | MALAYSIA | 2016 |
59 | PENGERANG DEEPWATER TERMINAL 2 AT PENGERANG | DIALOG | PIPE | API 5L B ERW | MALAYSIA | 2016 |
60 | NONE | SAPURAKENCANA HL SDN BHD | 3LPE COATED FITTING | WPB | MALAYSIA | 2016 |
61 | Petrobras FPSO P-75/P-77 | BJC HEAVY INDUSTRIES PUBLIC COMPANY LIMITED | FORGED FITTING | A105 A350 LF2,WPB.A420 WPL6 | THAILAND | 2016 |
62 | NONE | OPHIR THAILAND (BUALUANG) LTD | FORGED PIPE, FLANGE | A350 LF2, A105N | THAILAND | 2016 |
63 | ABPR3 COMBINED CYCLE COGENERATION PLANT PROJECT | HAMON-B GRIMM LTD | AWWA FLANGE | A105 | THAILAND | 2016 |
64 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS | FLANGE, BW FITTING, FORGED FITTING | A182 F51, A350LF2, A105, A240 TP316, A815 UNS S31803, A403 WP310 | MALAYSIA | 2016 |
65 | NONE | PETRONAS | RESTRICTION PLAT,ORIFICE | A/SA516 GR.70, A182 316L | MALAYSIA | 2016 |
66 | JZHCE 1737,1739 | PETROFAC INTERNATIONAL LTD | FLANGE, PIPE | SA105N, SA182 F316L,A53 GR.B/API 5L PSL1, WPB,A106 GR.B | VIETNAM | 2016 |
67 | EX-22&24 PROJECT | NONE | FITTING | A182-F304, A105, A403 WP304 | THAILAND | 2016 |
68 | 2 ea HEAT EXCHANGER | AKSA AKRILIK / TEKFEN | FLANGE, FORGING | SA182 F904L. SA182 F304L, SA105 | TURKEY | 2016 |
69 | NONE | LOTTE | FITTING | A234 WPB | MALAYSIA | 2016 |
70 | B15 PROJECT | SAPURAKENCANA | FITTING,FLANGE | A815 UNS S31803, A105, A182 F51,A182 F316 | MALAYSIA | 2016 |
71 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS | FLANGE | A516 GR70 | MALAYSIA | 2016 |
72 | CEKERAWALA PLATFORM MAINTENANCE | CARIGALI HESS / PIONEER ENGINEERING | FLANGE, FITTING | A182 F316L, A403 WP316L | MALAYSIA | 2016 |