STEEL WORLD CO., LTD
ONE-STOP SHOP FOR ALL KINDS OF PIPINGS MATERIALS
STEEL WORLD CO., LTD WILL CONTINUOUSLY DO ALL IT S BEST IN ORDER TO PROVIDE YOU WITH MOST
SATISFACTORY SERVICE FROM THE TIME OF RECEMING ENQUIRY TO THE PERFECT MANAGEMENT OF LOGISTICS.
No | PROJECT | CLIENT/CONTRACTOR | PRODUCT | MATERIAL | QUANTITY/ COUNTRY |
YEAR |
1 | EPC TRANSMISSION GAS PIPELINE PROJECT GRESSIK-SEMARANG | PT. PERTAGAS | SAW PIPE | API 5L Gr.X52MO PSL2 c/w 3 LPE COATING | 28000TON INDONESIA | 2015 |
2 | DONGGI PROJECT | PT. PERTAMINA EP | FITTING,FLANGE,SMLS PIPE | A105, A182 F316/316L, A403 WP316L, A106-B, A312 TP316/316L | INDONESIA | 2015 |
3 | SU TU TRANG FULL FIELD DEVELOPMENT - PHASE 1 | TECHNIP / PETROVIETNAM ENGINEERING | 2:1 ELLIPSOIDAL HEAD | A516 GR70,A240 TP316L(U STAMP) | VIETNAM | 2015 |
4 | BWCE COMBINED CYCLE COGENERATION PLANT PROJECT | BOWIN CLEAN ENERGY LIMITED | SMLS PIPE,FITTING,FLANGE | A106-B,A312
TP304,A335P22,A182F22,A105,A182F30 4,A234 WPB |
THAILAND | 2015 |
5 | MODEL 841 VGC FILTER/COALESCER | BECHTEL OIL GAS & CHEMICAL | FLANGE,CUSTOM FORGING | SA350LF2,SA182F304/L | USA | 2015 |
6 | NATGASOLINE METHANOL | ORASCOM E&C USA, INC | CUSTOM FLANGE | SA105 | USA | 2015 |
7 | EGP LOADING DRYERS/EGP REFRIGERATION SURGE DRUM/C4 LOADING DRYERS | BURNS & MCDONNEL | QLIP,FORGING,FLANGE | SA182F304L | USA | 2015 |
8 | MODEL 361 VGC COALESCER | SWFCO | CUSTOM FLANGE | SA350LF2,SA105 | USA | 2015 |
9 | UNKNOWN | CB&I | FLANGE,BOLT/NUTS | SA105,SA350LF2,SA182F304/L | USA | 2015 |
10 | UNKNOWN | D&Z FOR EASTMAN | ELLIPTICAL HEAD,CUSTOM NOZZLE | SA182F316L | USA | 2015 |
11 | KAOMBO PROJECT | SAIPEM | JIS FLANGE | SFVC 2A (N) | SINGAPORE | 2015 |
12 | JANGKRIK COMPLEX FPU PROJECT | ENI S.p.A | FORGED/BW FITTING | A234WPB/A420WPL6/A105/A350LF2 | INDONESIA | 2015 |
13 | JANGKRIK COMPLEX FPU PROJECT | ENI S.p.A | FORGED/BW FITTING | A403WP316L/A182F316L A815 UNS S31803 / A182F51 |
INDONESIA | 2015 |
14 | JANGKRIK COMPLEX FPU PROJECT | ENI S.p.A | FLANGE/SPEC.BLIND | A105N, A182F316/L, A182F51 | INDONESIA | 2015 |
15 | JANGKRIK COMPLEX FPU PROJECT | ENI S.p.A | 3D & 5D PIPE BEND | API 5L-X65 PSL2/ UNS S31803 | INDONESIA | 2015 |
16 | PUSRI 2B PROJECT | PT. REKAYASA INDUSTRY | FLANGE/FITTING | A105, A182F11, A403WP316/L | INDONESIA | 2015 |
17 | FPSO PIONEIRO DE LIBRA | JURONG SHIPYARD PTE LTD | FLANGE/FITTING | A182F51/A105N/A234WPB | SINGAPORE | 2015 |
18 | UNIT PENGOLAHAN IV CILACAP | PT PERTAMINA | FLANGE | A182F316L | INDONESIA | 2015 |
19 | TAM DAO 05 JACK-UP RIG | PETROVIETNAM MARINE SHIPYARD | PIPING, FITTING, FLANGE | ASTM A106 GR.B/ASTM A105N/ ASTM A234 Gr. WPB/ | VIETNAM | 2015 |
20 | TAIF PROJECT | KNM PROCESS SYSTEMS SDN BHD | SMLS PIPE | A333 GR6 | MALAYSIA | 2015 |
21 | TAIF PROJECT | KNM PROCESS SYSTEMS SDN BHD | FLANGE | A350 LF2 CL1 / A182 F316/L / A516 GR70 | MALAYSIA | 2015 |
22 | TAIF PROJECT | KNM PROCESS SYSTEMS SDN BHD | FITTINGS | A350 GR LF2 CL1/ A420 GR WPL6 | MALAYSIA | 2015 |
23 | TAM DAO 05 JACK-UP RIG | PETROVIETNAM MARINE SHIPYARD | HAMMAR UNION, SAE FLANGE | ASTM A105, A182F316L | VIETNAM | 2015 |
24 | TAM DAO 05 JACK-UP RIG | PETROVIETNAM MARINE SHIPYARD | PIPE | API 5L PSL 1 GR.B | VIETNAM | 2015 |
25 | TCOT FRS PROJECT | PETRONAS CARIGALI SDN. BHD | BALL VALVE | ASTM A216 -WCB/WCC | MALAYSIA | 2015 |
26 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS | FLANGE | A182 F51, A350 LF2, A182 F316, A240 TP316 AND A516-60/65/70 | MALAYSIA | 2015 |
27 | BANGPA-IN COGENERATIOIN PHASE II SPP PROJECT | SHINRYO | FLANGE, FITTING,FORGED FITTING | A182F11,F304,A105,A234 WPB,WP11,A182 F11&F12 | THAILAND | 2015 |
28 |
HESS REMOTE WHP,NORTH MALAY BASIN DEVELOPMENT PROJECT |
HESS | FITTING,FLANGE | A182 F55, A182 F51, A694 F65A815 S32760,A815 S31803 | MALAYSIA | 2015 |
29 | TRANS THAILAND MALAYSIA (TTM) NEW INCINERATOR PROJECT | PTT-PETRONAS JV CO. | FITTING, FLANGE | A403 WP304L, A182 F304L | THAILAND | 2015 |
30 | BNJT-K AND TTJT-A WELLHEAD PLATFORMS (WHP) | PETRONAS CARIGALI SDN BHD | FLANGE, FLANGOLET, SPECTACLE BLIND | A105,A350 LF2, A182 F316/316L, A/SA516 60/65/70,A240 TP316/316L | MALAYSIA | 2015 |
31 | S1 EX20&21 PROJECT | NONE | FORGED FITTING | A182-F304, A105 | THAILAND | 2015 |
32 | HIGH-TAN PROJECT | PTTGC | PIPE, FLANGE, FITTING | A234 WP5, A403 WP316L, WP304L,A182 F5, A240TP316L, A335 P5 | THAILAND | 2015 |
33 | PETRONAS FLNG2 PROJECT | PETRONAS | FLANGE | A105, A182 F316L | SINGAPORE | 2015 |
34 | JDA BLOCK B-17 DEVELOPMENT PROJECT | CARIGALI-PTTEPI OPERATING COMPANY SDN BHD | BLEED RING | A105/F304/F51/A234WPB/S31803 | MALAYSIA | 2015 |
35 | NONE | MITSUI ENGINEERING & SHIPBUILDING CO., LTD. | PIPE BEND | A53B ERW | THAILAND | 2015 |
36 | BESAR PROJECT | PETRONAS CARIGALI SDN. BHD | FLANGES | A182F51,A105, A182 F53, A182 F316 | MALAYSIA | 2015 |
37 | AFTON PROJECT | FOSTER WHEELER | FLANGES, FITTINGS | A105N A516 GR.70, A182 F316/316L, A234 WPB | MALAYSIA | 2015 |
38 | JDA BLOCK B-17 DEVELOPMENT PROJECT PH-3 BROWNFIELD WORKS | CARIGALI-PTTEPI OPERATING COMPANY SDN BHD | FLANGES | A694 F65 | MALAYSIA | 2015 |
39 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS | FITTINGS,FLANGE,FORGED FITTING,SPECTACLE BLIND |
A815 WP S31803, A182 F51 | MALAYSIA | 2015 |
40 | BESAR PROJECT | PETRONAS CARIGALI SDN. BHD | FLANGES,FITTINGS | A182F51,A105, A182 F316,A234 WPB,A403 WP316L | MALAYSIA | 2015 |
41 | CATCHER FPSO PROJECT | BW | FITTING, FLANGE | A420 WPL6, A860 WPHY52,A234 WPB,A350 LF2,A105,A182 F316, A516- 70, A240-316 | THAILAND | 2015 |
42 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS | FORGED FITTING, FITTING | A182F316/316L,A182 F51, A815 WPS 31803/32205 | MALAYSIA | 2015 |
43 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS | FLANGE | A105N, A350 LF2, A694 F65, A182 F316/316L AND A516 GR.70,A240TP316L | MALAYSIA | 2015 |
44 | DEC/PUMA-LNAGSAT PIPELINES EXTENSION | DIALOG PLANT SERVICES SDN BHD | FITTING | KS D3507 SPP, JIS G3454 STPG 37 | A234 WPB | 2015 |
45 | CARIGALI HESS | CARIGALI HESS OPERATING COMPANY SDN BHD | FLANGOLET, FLANGE | A182 F316L | MALAYSIA | 2015 |
46 | HIGH TAN PROJECT | PTT GLOBAL CHEMICAL PUBLIC CO., LTD. | FLANGE | A182 F316L | THAILAND | 2015 |
47 | ICHTHYS OFFSHORE LNG FACILITIES | IMPEX OPERATION AUSTRALIA PTY LTD | FORGED FITTING, SPACER&BLANK | A105N/A350LF2CL.1/A182F304L/A516- 70N | SINGAPORE | 2014 |
48 | 75,000 cbm DIESEL STORAGE TERMINAL & DOLPHIN MOORING SYSTEM |
PETRO STORINDO ENERGI | SAWL PIPE | API 5L X52 PSL2 | INDONESIA | 2014 |
49 | 75,000 cbm DIESEL STORAGE TERMINAL & DOLPHIN MOORING SYSTEM | PETRO STORINDO ENERGI | 5D PIPE BEND C/W 3LPE COATING | API 5L X52 PSL2 WELDED | INDONESIA | 2014 |
50 | LHOKSUKON ARUN BELAWAN PROJECT | PT. PERTAMINA GAS (PERTAGAS) | 5D PIPE BEND C/W 3LPE COATING | API 5L X52 PSL2 WELDED | INDONESIA | 2014 |
51 | PERTAMINA HULU ENERGI WEST MADURA OFFSHORE | PERTAMINA PHE WMO | 5D PIPE BEND C/W FBE COATING | API 5L X52 PSL2 SMLS | INDONESIA | 2014 |
52 | JASA PERANCANGAN, PENGADAAN, KONSTRUKSI DAN KOMISIONING PIPA TRANSMISI GAS BELAWAN-KIM-KEK | PERTAMINA GAS | 5D PIPE BEND C/W 3LPE COATING | API 5L X52 PSL2 WELDED | INDONESIA | 2014 |
53 | KABIL 4 PROJECT | PERTAMINA PATRA NIAGA | ERW PIPE | API 5L-B PSL1 | INDONESIA | 2014 |
54 | TE GIAC TRANG DEVELOPMENT PROJECT (H5- WHP) | PTSC MECHANICAL AND CONSTRUCTION LIMITED COMPANY | SPECTACLE BLIND, FLANGE | A516 GR.70/A240 TP316L/A105N/A350LF2CL1/A182F316L/ A694F65 | VIETNAM | 2014 |
55 | TAIWAN/TALIN POWER PLANT RENEWAL PROJECT | TOSHIBA PLANT SYSTEMS & SERVICES CORPORATION | FORGED/BW FITTING | A105/A182F304, F317L, F11, F91, F92 | TAIWAN | 2014 |
56 | JANGKRIK PROJECT | SAIPEM INDONESIA | FORGED/BW FITTING | A234WPB/A420WPL6/A105/A350LF2/A40 3WP316L/A182F316L | INDONESIA | 2014 |
57 | JANGKRIK PROJECT (Job# ITT-1728) |
SAIPEM INDONESIA | FLANGE | A105N | INDONESIA | 2014 |
58 | HIMREEN OIL DEVELOPMENT PROJECT | STATE CO FOR OIL PROJECTS (SCOP) | ERW PIPE | API 5L-X42MS, SOUR SERVICE,API 5LGR.B, | IRAQ | 2014 |
59 | TAM DAO 05 JACK-UP RIG | PETROVIETNAM MARINE SHIPYARD | SMLS PIPE, FITTING, FLANGES | A53 Gr. B, ASTM A234 Gr. WPB ASTM A105 | VIETNAM | 2014 |
60 | TAM DAO 05 JACK-UP RIG | PETROVIETNAM MARINE SHIPYARD | BOLT & NUT, GASKET | SS 316,ASTM A193 Gr. B7, ASTM A194 Gr. 2H, SS316 | VIETNAM | 2014 |
61 | TAM DAO 05 JACK-UP RIG | PETROVIETNAM MARINE SHIPYARD | SMLS, ERW PIPE | ASTM A106 Gr.B, A53 Gr.B | VIETNAM | 2014 |
62 | THAI BINH – HAM RONG GAS DISTRIBUTION & GATHERING SYSTEM PROJECT | PTSC PRODUCTION SERVICES JSC (PPS) | PIPING, FITTING, FLANGE, GASKET & BOLTNUTS,SHAPE | ASTM A106 GR.B/ASTM A333 6 A312 GR.TP316/A105N/ASTM A182 GR.F316/A234 GR.WPB | VIETNAM | 2014 |
63 | TAM DAO 05 JACK-UP RIG | PETROVIETNAM MARINE SHIPYARD | SHAPE STEEL | AB/AH36, AB/A | VIETNAM | 2014 |
64 | UNKNOWN | UNKNOWN | FORGING | A105N | UAE | 2014 |
65 | THAI BINH – HAM RONG GAS DISTRIBUTION & GATHERING SYSTEM PROJECT | PTSC PRODUCTION SERVICES JSC (PPS) | PIPING, FITTING, FLANGE, GASKET & BOLTNUTS,SPECIALTY ITEMS | ASTM A106 GR.B/ API5L GR.B/ A312 GR.TP316/A105N/ASTM A182 GR.F316/A234 GR.WPB | VIETNAM | 2014 |
66 | TAM DAO 05 JACK-UP RIG | PETROVIETNAM MARINE SHIPYARD | HAMMER UNION | ASTM A105 | VIETNAM | 2014 |
67 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS | FLANGEs | A105N BS3293 | MALAYSIA | 2014 |
68 | EPCIC OF JDA GAS BALANCING EVACUATION PROJECT | TRANS THAI MALAYSIA | WELDOLET | A350LF2 | MALAYSIA | 2014 |
69 | BOOSTER COMPERESSION PROJECT | CARIGALI HESS OPERATING COMPANY SDN.BHD | FLANGE, FITTING | A182 F51,A815 UNS S31803/32205 | MALAYSIA | 2014 |
70 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS | FLANGE | A516 GR.70, A182 F5 | THAILAND | 2014 |
71 | POLYBUTYLENE SUCCINATE PLANT PROJECT | PTT MCC BIOCHEM | BEND | A312 TP304 | THAILAND | 2014 |
72 | JKC ICHTHYS PROJECT | JKC AUSTRALIA LNG PTY LTD | FLANGE | A105 | THAILAND | 2014 |
73 | S1EX17 & EX19 PROJECT | MES MITR PROJECT SERVICE | ROUND BAR, FITTING | A105, A182 F304 | THAILAND | 2014 |
74 | SHELL MALIKAI EPC TLP PROJECT | NONE | FLANGE, FITTING | A105,A182 F316/316L,A350 LF2,A815 S31803 | MALAYSIA | 2014 |
75 | TSA PROJECT | NONE | FLANGE, FORGED FITTING | A182 F304 | THAILAND | 2014 |
76 | STV-CIS PROJECT | NONE | FLANGE, FITTING | SA234 WPB, A403 WP316L,A182 TP316L, SA105N | VIETNAM | 2014 |
77 | SVSW-007019 MULTIPHASE FLOWMETER | NONE | FLANGE | A105 | VIETNAM | 2014 |
78 | NOV PROJECT STV-CLOSED DRAIN SKID | NONE | FITTING | A403 WP316L,A105,A420 WPL6 | VIETNAM | 2014 |
79 | SPP NG RW PIPELINE & METERING STATION PROJECT | THAI OIL PUBLIC COMPANY LIMITED | PIPE | API 5L X42 ERW PSL2 3LPE COATING | THAILAND | 2014 |
80 | TSA PROJECT | NONE | FLANGE, FORGED FITTING | A182 F304 | THAILAND | 2014 |
81 | BOD FLOWLINE HEADERS EXTENSION PROJECT | TALIAMAN | FITTING, FLANGE | A182 F51, F53,A815 UNS S31803, A105N | MALAYSIA | 2014 |
82 | NONE | CUEL LIMITED | FLANGE | A105 | THAILAND | 2014 |
83 | PRAI II LATERAL GAS PIPELINE PROJECT (PRISM) | PETRONAS GAS SDN BHD | COATED BEND | API 5L X 70 PSL2 | MALAYSIA | 2014 |
84 | O-M-13-793 SHELL MALIKAI EPC TLP PROJECT | NONE | FLANGE | A182 F316/316L,A240 TP316 | MALAYSIA | 2014 |
85 | SYRUP HOLDING TANK | PRT ASLA LIMITED | FLANGE | A105N | THAILAND | 2014 |
86 | SKS PROJECT | AGC DHEMICALS (THAILAND) CO., LTD | FITTING, FLANGE | A350 LF3,A105,A350LF2 | THAILAND | 2014 |
87 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS | FITTING,FLANGE | A182 F51, A516 GR.60,A350 LF2,A105,A182 F316L, A240 TP316,A285 GR.C | MALAYSIA | 2014 |
88 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS | FITTINGS,FORGED FITTINGS,FLANGE | A182 F51, A815 UNS S31803 | MALAYSIA | 2014 |
89 | PTT IRPC DISTRIBUTION GAS PIPELINE | PTT | FORGED FITTING | A105 | THAILAND | 2014 |
90 | SSUT GAS PIPELINE PROJECT | ITALIAN-THAIL DEVELOPMENT PUBLIC CO., LTD | FITTING,FORGED FITTING | WPB, A105 | THAILAND | 2014 |
91 | DPSSB-CHANNEL HEAD FOR PC METHANOL | PETRONAS CHEMICALS METHANOL SDN BHD | FLANGE | SA266 GR.2, SA105 | MALAYSIA | 2014 |
92 | BESAR PROJECT | PETRONAS CARIGALI SDN. BHD | FITTING,FLANGE | A815GR.WPS31803,A815UNS S32760,A860 GR.WPHY65.A182F316L | MALAYSIA | 2014 |
93 | JDA BLOCK WELLHEAD PLATFORMS & PIPELINE PHASE 3 | PETRONAS CARIGALI SDN. BHD | FLANGE | A694F65,A350LF2,A516GR70 | MALAYSIA | 2014 |
94 | SEC G1 PROJECT | NONE | FORGED FITTING | A105,A234WPB,A403WP304 | THAILAND | 2014 |
95 | CENDOR PHASE-2 FPSO | YOKOGAWA KONTRAL (M) SDN BHD | FLANGE | A105 | MALAYSIA | 2014 |
96 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS | FLANGOLET,FORGED FITTING | A182 F51, A182 F316, A105N,A350 LF2 | MALAYSIA | 2014 |
97 | GAS PIPELIND AND GAS METERING AND REGULATING STATION PROJECT |
THAI OIL PUBLIC COMPANY LIMITED | FLANGE,FORGED FITTING | A694 F52,A105 | THAILAND | 2014 |