STEEL WORLD CO., LTD

ONE-STOP SHOP FOR ALL KINDS OF PIPINGS MATERIALS

STEEL WORLD CO., LTD WILL CONTINUOUSLY DO ALL IT S BEST IN ORDER TO PROVIDE YOU WITH MOST
SATISFACTORY SERVICE FROM THE TIME OF RECEMING ENQUIRY TO THE PERFECT MANAGEMENT OF LOGISTICS.

Steelworld

No PROJECT CLIENT/CONTRACTOR SUPPLIED ITEM MATERIAL QUANTITY/
COUNTRY
YEAR
67 CONTRACT 32/5395/QR-01/2012
(NEW DRY GAS POWER STATION PROJECT)
SCOP
(STATE COMPANY FOR OIL PROJECT)
ERW PIPE API 5L X60 PSL2 ERW PIPE
(DEALING IN COMMISSION BASE)
6062TON
IRAQ
2012
68 CONTRACT 32/5395/QR-01/2012
(NEW DRY GAS POWER STATION PROJECT)
SCOP
(STATE COMPANY FOR OIL PROJECT)
SAW PIPE API 5L X60 PSL2 LSAW
PIPE (DEALING IN COMMISSION BASE)
5192TON
IRAQ
2012
69 CHANA COMBINED CYCLE POWER
PLANT BLOCK 2/ TRAIN 1&2
ELECTRICITY GENERATING AUTHORITY OF THAILAND FLANGES, FITTINGS A105 GAL,A182 F316L,F304L,A403 WP304L 50TONS
THAILAND
2012
70 PTTAR IRPC MULTIPRODUCT PIPELINE PROJECT IRPC PUBLIC COMPANY FLANGES, SPECTACLE BLIND A105, A516 GR.70 20TONS THAILAND 2012
71 RUNG TAWAN PROJECT NONE FLANGES A182 F304, A105 24TONS
THAILAND
2012
72 AYT PROJECT AJINOMOTO CO., LTD FITTINGS JIS B2313 S304,S316L 33TONS THAILAND 2012
73 TOPIS R TOPSIDE EXXON MOBILE FITTINGS,FLANGES A815 S31803, A182 F51 20TONS
MALAYSIA
2012
74 TALISMAN
RO304-2010
PTSC FLANGES A182 F53 40TONS
MALAYSIA
2012
75 KBB NORTHERN HUB PROJECT KPOC HANGER,COMPACT FLANGES A694 F65, F70 65TONS
MALAYSIA
2012
76 BIEN DONG 1 PROJECT BIEN DONG PETROLEUM OPERATION COMPANY FORGED FITTINGS A105N 24TONS
MALAYSIA
2012
77 FPSO CENDOR NONE FLANGES SS400 30TONS
MALAYSIA
2012
78 SABAH OIL AND
GAS TERMINAL PROJECT
PETRONAS CARIGALI SDN BHD SAW PIPES API 5L B PSL.1 180TONS
MALAYSIA
2012
79 PLANT REJUVENATION & REVAMP 2 PROJECT PETRONAS LATERAL A403 WP304 20TONS
MALAYSIA
2012
80 PENINSULAR GAS UTILIZATION PROJECT PERONAS GAS BERHAD FLANGE, SPACER BLANK A105, A516 GR.70 30TONS
MALAYSIA
2012
81 TOPIS R TOPSIDE EXXON MOBILE EXPLORATION & PRODUCTION MALAYSIA EFW PIPES API 5L X52, A671 GR CC65 360TONS
MALAYSIA
2012
82 BOOSTER COMPERESSION PROJECT CARIGALI HESS OPERATING COMPANY SDN.BHD FITTINGS,FLANGES A182 F51, A420 WPL6 20TONS
MALAYSIA
2012
83 BOOSTER COMPERESSION PROJECT CARIGALI HESS OPERATING COMPANY SDN.BHD FITTINGS,FLANGES, A234 WPB,A420 WL6,A105N,A350 LF2,A516 70,A182 F51 570TONS MALAYSIA 2012
84 BOOSTER COMPERESSION PROJECT CARIGALI HESS OPERATING COMPANY SDN.BHD FORGED FITTINGS,
PADDLE SPACER
A182 F51,A815 S31803,A240 TP316 320TONS
MALAYSIA
2012
85 INDEPENDENT DEEPWATER PETROLEUM TERMINAL AT PENGERANG PENGERANG INDEPENDENT TERMINALS SDN BHD FITTINGS A234 WPB 190TONS
MALAYSIA
2012
86 INDEPENDENT DEEPWATER PETROLEUM TERMINAL AT PENGERANG PENGERANG INDEPENDENT TERMINALS SDN BHD ERW PIPES API 5L GR.B PSL2 3,150TONS
MALAYSIA
2012
87 TOPIS R TOPSIDE EXXON MOBILE EXPLORATION & PRODUCTION MALAYSIA SPECTACLE BLIND FLANGES A516 GR.60, A240 TP316L,
A182 F51
48TONS
MALAYSIA
2012
88 BORF CENTRIFUGAL COMPRESSOR PROJECT MURPHY SARAWAK OIL CO., LTD FORGED FITTINGS,FLANGES A105N,A182 F316L,
A234 WPB
65TONS
MALAYSIA
2012
89 CHANA COMBINED CYCLE POWER
PLANT BLOCK 2
ELECTRICITY GENERATING AUTHORITY OF THAILAND FORGED FITTINGS,FLANGES A694 F65, A182 F316L,
A182 F51
70TONS
MALAYSIA
2012
90 TOPIS R TOPSIDE EXXON MOBILE EXPLORATION & PRODUCTION MALAYSIA FORGED FITTINGS,FLANGES A182 F316L,A105N,
A182 F51
20TONS
MALAYSIA
2012
91 EIP / PSA3 PROJECT THAI OIL PUBLIC COMPANY LIMITED SAW PIPES API 5L B PSL.1 100 TONS
THAILAND
2012
92 OSX 3 FPSO AIBEL LIMITED FITTINGS,FLANGES A105N,A350 LF2,A182 F316L,A403 WP316L 35TONS THAILAND 2012
93 BORF CENTRIFUGAL COMPRESSOR PROJECT MURPHY SARAWAK OIL CO., LTD FITTINGS,FLANGES A403 WP316L,A694 F52 50TONS
MALAYSIA
2012
94 SABAH OIL AND
GAS TERMINAL PROJECT
PETRONAS CARIGALI SDN BHD FITTINGS,FLANGES A350 LF2,A105N,A516 GR70,A403 WP321 80TONS
MALAYSIA
2012
95 WANG NOI CCPP BLOCK 4 ELECTRICITY
GENERATING
AUTHORITY OF THAILAND
FORGED FITTINGS A182 F316L 20TONS THAILAND 2012
96 SABAH OIL AND
GAS TERMINAL PROJECT
PETRONAS CARIGALI
SDN BHD
FITTINGS,FLANGES A350 LF2,A182 F316L, F304L105N,
A516 GR70,A403 WP321
30TONS
MALAYSIA
2012
97 SHELL PROJECT SHELL GLOBAL
SOLUTIONS INTERNATIONAL
FITTINGS,FLANGES,FORGED FITTINGS A105N,A182 F304L,
A283 GR.C,A403 WP304L,
A420 WPL6
45TONS
MALAYSIA
2012
98 OSX 3 FPSO AIBEL LIMITED FITTINGS,FLANGES,FORGED FITTINGS,FLANGOLET A105N,A350 LF2,
A182 F316L,A403 WP316L,
A420 WPL6
55TONS THAILAND 2012
99 BORF CENTRIFUGAL COMPRESSOR PROJECT MURPHY SARAWAK OIL CO., LTD FLANGES A182 F316L,A516 GR.70,
A182 F51,A240 TP316L
,A694 F52,A105N,
A350 LF2
180TONS
MALAYSIA
2012
100 JG SUMMIT PE CAPACITY EXPANSION PROJECT   FITTINGS,FLANGES,FORGED FITTINGS A105,A182 F304,F316L,
A234 WPB,A403 WP304
60TONS PHILIPPINES 2012
101 BORF CENTRIFUGAL COMPRESSOR PROJECT MURPHY SARAWAK OIL CO., LTD FITTINGS A403 WP316L,A815 UNS S31803 90TONS
MALAYSIA
2012
102 BOOSTER COMPERESSION PROJECT CARIGALI HESS OPERATING COMPANY SDN.BHD FITTINGS,FLANGES,
SPECTACLE BLIND,
FLANGOLET
A815 S31803,A182 F51,A240 TP316L 50TONS
MALAYSIA
2012
103 BYPRODUCTS VALUE ADDED PROJECT PTT GLOBAL CHEMICAL PUBLIC COMPANY
LIMITED
SPECTACLE BLIND FLANGES A516 GR.70 25TONS THAILAND 2012
104 SHELL PROJECT SHELL GLOBAL
SOLUTIONS
FITTINGS, FLANGES WP316L,A815 S31803,A182 F51,A105,A316L 90TONS SINGAPORE 2012
105 KAMELIA-A WELLHEAD PLATFORM&
PIPELINE PROJECT
PERUNDING RANHILL WORLEY SDN BHD BLEED RING A182 F51 45TONS
MALAYSIA
2012
106 D12 FIELD DEVELOPMENT SHELL SARAWAK PIPES,FITTINGS,FLANGES SA790 S31803, A815 S31803,
A182 F51,F316L,
A403 WP316L
130TONS
MALAYSIA
2012
107 TOPIS R TOPSIDE EXXONMOBIL EXPLORATION & PRODUCTION MALAYSIA INC FITTINGS A815 S31803 80TONS
MALAYSIA
2012
108 SHELL PROJECT SHELL GLOBAL
SOLUTIONS
PIPES,FITTINGS,FLANGES A790 S31803,WPB,
WPL6,LF2
110TONS SINGAPORE 2012
109 SHELL PROJECT SHELL GLOBAL
SOLUTIONS
FLANGE, FITTING A105,A182 F51,
A516 GR.60,A240 S31803,
A815 31803
200TONS
MALAYSIA
2012
110 SHELL PROJECT SHELL GLOBAL
SOLUTIONS
FLANGES A182 F51,A350 LF2 A182 F316/316L 130TONS
MALAYSIA
2012
111 UNKNOWN ORIGIN ENERGY ORIFICE FLANGE,PLATE A105N, SS316 100TONS
MALAYSIA
2012
112 TOPIS R TOPSIDE EXXONMOBIL EXPLORATION & PRODUCTION
MALAYSIA INC
FLANGES A694 F65,A105N 180TONS
MALAYSIA
2012
113 WANG NOI CCPP BLOCK 4 ELECTRICITY
GENERATING AUTHORITY OF THAILAND
FITTING,FORGED FITTING,
FLANGE
A182 F304L,316L,A105 35TONS THAILAND 2012
114 CHANA COMBINED CYCLE POWER PLANT BLOCK 2/ TRAIN 1&2 ELECTRICITY GENERATING AUTHORITY OF THAILAND FLANGE, FITTING,
FORGED FITTING
A105 GAL,A182 F316L,F304L,A403 WP304L 70TONS
THAILAND
2012
115 MICCO AN PROJECT 200,000 MTPY UNKNOWN FITTINGS A403 WP 304L VIETNAM 2012
116 SHELL PROJECT SHELL GLOBAL
SOLUTIONS
FORGED FITTING A105N,A350 LF2,A182 F304,A182 F316 MALAYSIA 2012
117 SHELL PROJECT SHELL GLOBAL
SOLUTIONS
SPECTACLE BLIND FLANGES A516 GR 70 MALAYSIA 2012
118 SHELL PROJECT SHELL GLOBAL
SOLUTIONS
FLAGES,FTTINGS A350 LF2,A182 F51,A815 S31803 MALAYSIA 2012
119 SABAH OIL AND GAS TERMINAL PROJECT SHELL GLOBAL
SOLUTIONS
FLANGE, FORGED FITTING A105N,A350 LF2,A182 F304,A694 F65 MALAYSIA 2012
120 BORF CENTRIFUGAL COMPRESSOR PROJECT MURPHY SARAWAK OIL CO., LTD FLANGES A105N, A350 LF2, A182 F316/316L,
A516 GR.70N
MALAYSIA 2012
121 SHAHID
KHARAZI PROJECT
NATIONAL IRANIAN OIL COMPANY BUTTERFLY VALVE A216, A128, A105, A193. 49 TON
IRAN
2012
122 SHAHID
KHARAZI PROJECT
NATIONAL IRANIAN OIL COMPANY MANUAL VALVE A105/ A216/ A351/
A536/ A126
20 TON
IRAN
2012
123 HORMOZGAN PROJECT NATIONAL IRANIAN OIL COMPANY DRILL MACHINE - 30 TON
IRAN
2012
124 SHAHID
KHARAZI PROJECT
NATIONAL IRANIAN OIL COMPANY PIPE A358 316L/ A335 P11 20 TON
IRAN
2012
125 SOUTH PARS GAS FILD DEVELOMENT PHASE 14 NATIONAL IRANIAN OIL COMPANY
/PARS OIL AND GAS COMPANY
PIPE API 5L B/A333 2153TON
IRAN
2012
126 SOUTH PARS GAS FILD DEVELOMENT PHASE 14 NATIONAL IRANIAN OIL COMPANY
/PARS OIL AND GAS COMPANY
PIPE API 5L B/ A358 321, 316L 2000TON
IRAN
2012
127 SOUTH PARS GAS FILD DEVELOMENT PHASE 14 - Above Ground NATIONAL IRANIAN OIL COMPANY
/PARS OIL AND GAS COMPANY
PIPE API 5L B/ 316L 2005TON
IRAN
2012
128 UNKNOWN SEMBAWANG SHIPBUILDING SAW PIPE API 5L-B 180TON
SINGAPORE
2012
129 UNKNOWN   SAW PIPE,FITTING API 5L-B/A234WPB 45TON
SINGAPORE
2012
130 UNKNOWN ASTURI METAL BUILDERS(M) SDN.BHD FITTING A403 WP316L MALAYSIA 2012
131 INDONESIAN GAS PRODUCTION FACILITIES DEVELOPMENT PROJECT KALILA (BENTU) LIMITED SMLS PIPE API 5L X52 PSL1 4300TON
INDONESIA
2012
132 UNKNOWN VIETNAM OIL FITTING,FLANGE,SPECTACLE BLIND,SMLS PIPE A182F316L/A403WP316L/
A106-B/A312TP316L
VIETNAM 2012
133 FGRU PROJECT PETRONAS GAS BERHAD SAW/EFW PIPE API 5L-B 130TON
MALAYSIA
2012
134 HSD / HST CHEMICAL & METHANOL INJECTION PUMPS SKID PETROVIETNAM GAS CORPORATION FITTING,FLANGE A182F316/316L VIETNAM 2012
135 WELLHEAD PLATFORM 8 & 9 DEVELOPMENT CARIGALI HESS OPERATING COMPANY FLANGEOLET,BLEEDRING A182F51/S31803 SINGAPORE 2012
136 UNKNOWN QUEENSLAND NITRATES PTY LTD HEAT EXCHANGER TUBE A179 30TON
AUSTRALIA
2012
137 UNKNOWN PT. PROFAB INDONESIA FITTING,FLANGE A182F316/L INDONESIA 2012
138 WORSLEY FACILITIES PROJTECT ENERFLEX PROCESS PTY LTD FORGED FITTING/FLANGE A105N/A350LF2/A694F52 AUSTRALIA 2012
139 THAI NATIONAL POWER 2 SPP POWER PROJECT UNKNOWN FITTING,FLANGE A234WPB/A105N THAILAND 2012
140 PNG LNG EPC4 (FUEL GAS CONDITIONING SYSTEM) UNKNOWN FITTING,FLANGE A182F316L/A105N/A350LF2 SINGAPORE 2012
141 HOPE DOWN'S 4 PROJECT MONADELPHOUS AS2129 FLANGE A105N 20TON
AUSTRALIA
2012
142 MODIFICATION PIPELINE PROJECT PT. PERTAMINA BALONGAN ERW PIPE,FITTING API 5L-B/A234WPB/A105N 60TON
JAKARTA
2012
143 PERTAMINA GAS-PERTAGAS PROJECT PT. WIJAYA KARYA PIPE BEND API 5L-B 30TON
SINGAPORE
2012
144 SBM OSX2 TOP SIDE UNKNOWN FLANGE,FITTING,
FORGED FITTING
A105N/A403-WP316L/A815 S81803/A182F51/A182F53 SINGAPORE 2012
145 CROSS COUNTRY PROJECT PT. PERTAMINA RU IV Cilacap DSAW PIPE API 5L-B PSL1 WITH 3LPP COATING 730TON
INDONESIA
2012
146 BANYU URIP PROJECT MOBIL CEPU INDONESIA SAW PIPE API 5L-B PSL2 SOUR/NON SOUR 320TON
INDONESIA
2012
147 BANYU URIP PROJECT MOBIL CEPU INDONESIA CLAD/SOLID TUBE SHEET SA266Gr.2N+A240TP316L/ SA182F316L INDONESIA 2012
148 BANYU URIP PROJECT MOBIL CEPU INDONESIA CLAD TUBE SHEET SA266Gr.2N+SB-424 UNS N08825 30TON
INDONESIA
2012
149 TYPE E'BOOSTER COMPRESSOR PACKAGE CHEVRON THAILAND EXPLORATION & PRODUCTION LTD SE 2:1 HEADS SA516 GR.70N THAILAND 2012
150 LPG REFRIGERATED STORAGE PETROVIETNAM GAS CORPORATION FITTING,FLANGE,
BOLT/NUT,GASKET
A234WPB/A105N 30TON
VIETNAM
2012
151 MAIBARARA GEOTHERMAL POWER PLANT MAIBARARAGEOTHERMAL, INC SEAMLESS/ERW/LSAW PIPE,FITTING,FLANGE API 5L-B/A234WPB/A105N 190TON
PHILIPPINE
2012
152 HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT PETROVIETNAM TECHNICAL SERVICES FITTING,FLANGE,
FORGED FITTING
A234WPB/A420WPL6/A105/
A182F316L/A403WP304
40TON
VIETNAM
2012
153 MAINTENANCE CONOCO PHILIPS U-TUBE A789 TP31803 50TON
INDONESIA
2012
154 MAINTENANCE CONOCO PHILIPS TUBESHEET,NOZZLE,
FLANGE
SA266 GR 4N/SA105N/SA182F316L 45TON
INDONESIA
2012