STEEL WORLD CO., LTD
ONE-STOP SHOP FOR ALL KINDS OF PIPINGS MATERIALS
STEEL WORLD CO., LTD WILL CONTINUOUSLY DO ALL IT S BEST IN ORDER TO PROVIDE YOU WITH MOST
SATISFACTORY SERVICE FROM THE TIME OF RECEMING ENQUIRY TO THE PERFECT MANAGEMENT OF LOGISTICS.
No | PROJECT | CLIENT/CONTRACTOR | SUPPLIED ITEM | MATERIAL | QUANTITY/ COUNTRY |
YEAR |
67 | CONTRACT 32/5395/QR-01/2012 (NEW DRY GAS POWER STATION PROJECT) |
SCOP (STATE COMPANY FOR OIL PROJECT) |
ERW PIPE | API 5L X60 PSL2 ERW PIPE (DEALING IN COMMISSION BASE) |
6062TON IRAQ |
2012 |
68 | CONTRACT 32/5395/QR-01/2012 (NEW DRY GAS POWER STATION PROJECT) |
SCOP (STATE COMPANY FOR OIL PROJECT) |
SAW PIPE | API 5L X60 PSL2 LSAW PIPE (DEALING IN COMMISSION BASE) |
5192TON IRAQ |
2012 |
69 | CHANA COMBINED CYCLE POWER PLANT BLOCK 2/ TRAIN 1&2 |
ELECTRICITY GENERATING AUTHORITY OF THAILAND | FLANGES, FITTINGS | A105 GAL,A182 F316L,F304L,A403 WP304L | 50TONS THAILAND |
2012 |
70 | PTTAR IRPC MULTIPRODUCT PIPELINE PROJECT | IRPC PUBLIC COMPANY | FLANGES, SPECTACLE BLIND | A105, A516 GR.70 | 20TONS THAILAND | 2012 |
71 | RUNG TAWAN PROJECT | NONE | FLANGES | A182 F304, A105 | 24TONS THAILAND |
2012 |
72 | AYT PROJECT | AJINOMOTO CO., LTD | FITTINGS | JIS B2313 S304,S316L | 33TONS THAILAND | 2012 |
73 | TOPIS R TOPSIDE | EXXON MOBILE | FITTINGS,FLANGES | A815 S31803, A182 F51 | 20TONS MALAYSIA |
2012 |
74 | TALISMAN RO304-2010 |
PTSC | FLANGES | A182 F53 | 40TONS MALAYSIA |
2012 |
75 | KBB NORTHERN HUB PROJECT | KPOC | HANGER,COMPACT FLANGES | A694 F65, F70 | 65TONS MALAYSIA |
2012 |
76 | BIEN DONG 1 PROJECT | BIEN DONG PETROLEUM OPERATION COMPANY | FORGED FITTINGS | A105N | 24TONS MALAYSIA |
2012 |
77 | FPSO CENDOR | NONE | FLANGES | SS400 | 30TONS MALAYSIA |
2012 |
78 | SABAH OIL AND GAS TERMINAL PROJECT |
PETRONAS CARIGALI SDN BHD | SAW PIPES | API 5L B PSL.1 | 180TONS MALAYSIA |
2012 |
79 | PLANT REJUVENATION & REVAMP 2 PROJECT | PETRONAS | LATERAL | A403 WP304 | 20TONS MALAYSIA |
2012 |
80 | PENINSULAR GAS UTILIZATION PROJECT | PERONAS GAS BERHAD | FLANGE, SPACER BLANK | A105, A516 GR.70 | 30TONS MALAYSIA |
2012 |
81 | TOPIS R TOPSIDE | EXXON MOBILE EXPLORATION & PRODUCTION MALAYSIA | EFW PIPES | API 5L X52, A671 GR CC65 | 360TONS MALAYSIA |
2012 |
82 | BOOSTER COMPERESSION PROJECT | CARIGALI HESS OPERATING COMPANY SDN.BHD | FITTINGS,FLANGES | A182 F51, A420 WPL6 | 20TONS MALAYSIA |
2012 |
83 | BOOSTER COMPERESSION PROJECT | CARIGALI HESS OPERATING COMPANY SDN.BHD | FITTINGS,FLANGES, | A234 WPB,A420 WL6,A105N,A350 LF2,A516 70,A182 F51 | 570TONS MALAYSIA | 2012 |
84 | BOOSTER COMPERESSION PROJECT | CARIGALI HESS OPERATING COMPANY SDN.BHD | FORGED FITTINGS, PADDLE SPACER |
A182 F51,A815 S31803,A240 TP316 | 320TONS MALAYSIA |
2012 |
85 | INDEPENDENT DEEPWATER PETROLEUM TERMINAL AT PENGERANG | PENGERANG INDEPENDENT TERMINALS SDN BHD | FITTINGS | A234 WPB | 190TONS MALAYSIA |
2012 |
86 | INDEPENDENT DEEPWATER PETROLEUM TERMINAL AT PENGERANG | PENGERANG INDEPENDENT TERMINALS SDN BHD | ERW PIPES | API 5L GR.B PSL2 | 3,150TONS MALAYSIA |
2012 |
87 | TOPIS R TOPSIDE | EXXON MOBILE EXPLORATION & PRODUCTION MALAYSIA | SPECTACLE BLIND FLANGES | A516 GR.60, A240 TP316L, A182 F51 |
48TONS MALAYSIA |
2012 |
88 | BORF CENTRIFUGAL COMPRESSOR PROJECT | MURPHY SARAWAK OIL CO., LTD | FORGED FITTINGS,FLANGES | A105N,A182 F316L, A234 WPB |
65TONS MALAYSIA |
2012 |
89 | CHANA COMBINED CYCLE POWER PLANT BLOCK 2 |
ELECTRICITY GENERATING AUTHORITY OF THAILAND | FORGED FITTINGS,FLANGES | A694 F65, A182 F316L, A182 F51 |
70TONS MALAYSIA |
2012 |
90 | TOPIS R TOPSIDE | EXXON MOBILE EXPLORATION & PRODUCTION MALAYSIA | FORGED FITTINGS,FLANGES | A182 F316L,A105N, A182 F51 |
20TONS MALAYSIA |
2012 |
91 | EIP / PSA3 PROJECT | THAI OIL PUBLIC COMPANY LIMITED | SAW PIPES | API 5L B PSL.1 | 100 TONS THAILAND |
2012 |
92 | OSX 3 FPSO | AIBEL LIMITED | FITTINGS,FLANGES | A105N,A350 LF2,A182 F316L,A403 WP316L | 35TONS THAILAND | 2012 |
93 | BORF CENTRIFUGAL COMPRESSOR PROJECT | MURPHY SARAWAK OIL CO., LTD | FITTINGS,FLANGES | A403 WP316L,A694 F52 | 50TONS MALAYSIA |
2012 |
94 | SABAH OIL AND GAS TERMINAL PROJECT |
PETRONAS CARIGALI SDN BHD | FITTINGS,FLANGES | A350 LF2,A105N,A516 GR70,A403 WP321 | 80TONS MALAYSIA |
2012 |
95 | WANG NOI CCPP BLOCK 4 | ELECTRICITY GENERATING AUTHORITY OF THAILAND |
FORGED FITTINGS | A182 F316L | 20TONS THAILAND | 2012 |
96 | SABAH OIL AND GAS TERMINAL PROJECT |
PETRONAS CARIGALI SDN BHD |
FITTINGS,FLANGES | A350 LF2,A182 F316L, F304L105N, A516 GR70,A403 WP321 |
30TONS MALAYSIA |
2012 |
97 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS INTERNATIONAL |
FITTINGS,FLANGES,FORGED FITTINGS | A105N,A182 F304L, A283 GR.C,A403 WP304L, A420 WPL6 |
45TONS MALAYSIA |
2012 |
98 | OSX 3 FPSO | AIBEL LIMITED | FITTINGS,FLANGES,FORGED FITTINGS,FLANGOLET | A105N,A350 LF2, A182 F316L,A403 WP316L, A420 WPL6 |
55TONS THAILAND | 2012 |
99 | BORF CENTRIFUGAL COMPRESSOR PROJECT | MURPHY SARAWAK OIL CO., LTD | FLANGES | A182 F316L,A516 GR.70, A182 F51,A240 TP316L ,A694 F52,A105N, A350 LF2 |
180TONS MALAYSIA |
2012 |
100 | JG SUMMIT PE CAPACITY EXPANSION PROJECT | FITTINGS,FLANGES,FORGED FITTINGS | A105,A182 F304,F316L, A234 WPB,A403 WP304 |
60TONS PHILIPPINES | 2012 | |
101 | BORF CENTRIFUGAL COMPRESSOR PROJECT | MURPHY SARAWAK OIL CO., LTD | FITTINGS | A403 WP316L,A815 UNS S31803 | 90TONS MALAYSIA |
2012 |
102 | BOOSTER COMPERESSION PROJECT | CARIGALI HESS OPERATING COMPANY SDN.BHD | FITTINGS,FLANGES, SPECTACLE BLIND, FLANGOLET |
A815 S31803,A182 F51,A240 TP316L | 50TONS MALAYSIA |
2012 |
103 | BYPRODUCTS VALUE ADDED PROJECT | PTT GLOBAL CHEMICAL PUBLIC COMPANY LIMITED |
SPECTACLE BLIND FLANGES | A516 GR.70 | 25TONS THAILAND | 2012 |
104 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS |
FITTINGS, FLANGES | WP316L,A815 S31803,A182 F51,A105,A316L | 90TONS SINGAPORE | 2012 |
105 | KAMELIA-A WELLHEAD PLATFORM& PIPELINE PROJECT |
PERUNDING RANHILL WORLEY SDN BHD | BLEED RING | A182 F51 | 45TONS MALAYSIA |
2012 |
106 | D12 FIELD DEVELOPMENT | SHELL SARAWAK | PIPES,FITTINGS,FLANGES | SA790 S31803,
A815 S31803, A182 F51,F316L, A403 WP316L |
130TONS MALAYSIA |
2012 |
107 | TOPIS R TOPSIDE | EXXONMOBIL EXPLORATION & PRODUCTION MALAYSIA INC | FITTINGS | A815 S31803 | 80TONS MALAYSIA |
2012 |
108 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS |
PIPES,FITTINGS,FLANGES | A790 S31803,WPB, WPL6,LF2 |
110TONS SINGAPORE | 2012 |
109 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS |
FLANGE, FITTING | A105,A182 F51, A516 GR.60,A240 S31803, A815 31803 |
200TONS MALAYSIA |
2012 |
110 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS |
FLANGES | A182 F51,A350 LF2 A182 F316/316L | 130TONS MALAYSIA |
2012 |
111 | UNKNOWN | ORIGIN ENERGY | ORIFICE FLANGE,PLATE | A105N, SS316 | 100TONS MALAYSIA |
2012 |
112 | TOPIS R TOPSIDE | EXXONMOBIL EXPLORATION & PRODUCTION MALAYSIA INC |
FLANGES | A694 F65,A105N | 180TONS MALAYSIA |
2012 |
113 | WANG NOI CCPP BLOCK 4 | ELECTRICITY GENERATING AUTHORITY OF THAILAND |
FITTING,FORGED FITTING, FLANGE |
A182 F304L,316L,A105 | 35TONS THAILAND | 2012 |
114 | CHANA COMBINED CYCLE POWER PLANT BLOCK 2/ TRAIN 1&2 | ELECTRICITY GENERATING AUTHORITY OF THAILAND | FLANGE,
FITTING, FORGED FITTING |
A105 GAL,A182 F316L,F304L,A403 WP304L | 70TONS THAILAND |
2012 |
115 | MICCO AN PROJECT 200,000 MTPY | UNKNOWN | FITTINGS | A403 WP 304L | VIETNAM | 2012 |
116 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS |
FORGED FITTING | A105N,A350 LF2,A182 F304,A182 F316 | MALAYSIA | 2012 |
117 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS |
SPECTACLE BLIND FLANGES | A516 GR 70 | MALAYSIA | 2012 |
118 | SHELL PROJECT | SHELL GLOBAL SOLUTIONS |
FLAGES,FTTINGS | A350 LF2,A182 F51,A815 S31803 | MALAYSIA | 2012 |
119 | SABAH OIL AND GAS TERMINAL PROJECT | SHELL GLOBAL SOLUTIONS |
FLANGE, FORGED FITTING | A105N,A350 LF2,A182 F304,A694 F65 | MALAYSIA | 2012 |
120 | BORF CENTRIFUGAL COMPRESSOR PROJECT | MURPHY SARAWAK OIL CO., LTD | FLANGES | A105N, A350 LF2, A182 F316/316L, A516 GR.70N |
MALAYSIA | 2012 |
121 | SHAHID KHARAZI PROJECT |
NATIONAL IRANIAN OIL COMPANY | BUTTERFLY VALVE | A216, A128, A105, A193. | 49 TON IRAN |
2012 |
122 | SHAHID KHARAZI PROJECT |
NATIONAL IRANIAN OIL COMPANY | MANUAL VALVE | A105/ A216/ A351/ A536/ A126 |
20 TON IRAN |
2012 |
123 | HORMOZGAN PROJECT | NATIONAL IRANIAN OIL COMPANY | DRILL MACHINE | - | 30 TON IRAN |
2012 |
124 | SHAHID KHARAZI PROJECT |
NATIONAL IRANIAN OIL COMPANY | PIPE | A358 316L/ A335 P11 | 20 TON IRAN |
2012 |
125 | SOUTH PARS GAS FILD DEVELOMENT PHASE 14 | NATIONAL IRANIAN OIL COMPANY /PARS OIL AND GAS COMPANY |
PIPE | API 5L B/A333 | 2153TON IRAN |
2012 |
126 | SOUTH PARS GAS FILD DEVELOMENT PHASE 14 | NATIONAL IRANIAN OIL COMPANY /PARS OIL AND GAS COMPANY |
PIPE | API 5L B/ A358 321, 316L | 2000TON IRAN |
2012 |
127 | SOUTH PARS GAS FILD DEVELOMENT PHASE 14 - Above Ground | NATIONAL IRANIAN OIL COMPANY /PARS OIL AND GAS COMPANY |
PIPE | API 5L B/ 316L | 2005TON IRAN |
2012 |
128 | UNKNOWN | SEMBAWANG SHIPBUILDING | SAW PIPE | API 5L-B | 180TON SINGAPORE |
2012 |
129 | UNKNOWN | SAW PIPE,FITTING | API 5L-B/A234WPB | 45TON SINGAPORE |
2012 | |
130 | UNKNOWN | ASTURI METAL BUILDERS(M) SDN.BHD | FITTING | A403 WP316L | MALAYSIA | 2012 |
131 | INDONESIAN GAS PRODUCTION FACILITIES DEVELOPMENT PROJECT | KALILA (BENTU) LIMITED | SMLS PIPE | API 5L X52 PSL1 | 4300TON INDONESIA |
2012 |
132 | UNKNOWN | VIETNAM OIL | FITTING,FLANGE,SPECTACLE BLIND,SMLS PIPE | A182F316L/A403WP316L/ A106-B/A312TP316L |
VIETNAM | 2012 |
133 | FGRU PROJECT | PETRONAS GAS BERHAD | SAW/EFW PIPE | API 5L-B | 130TON MALAYSIA |
2012 |
134 | HSD / HST CHEMICAL & METHANOL INJECTION PUMPS SKID | PETROVIETNAM GAS CORPORATION | FITTING,FLANGE | A182F316/316L | VIETNAM | 2012 |
135 | WELLHEAD PLATFORM 8 & 9 DEVELOPMENT | CARIGALI HESS OPERATING COMPANY | FLANGEOLET,BLEEDRING | A182F51/S31803 | SINGAPORE | 2012 |
136 | UNKNOWN | QUEENSLAND NITRATES PTY LTD | HEAT EXCHANGER TUBE | A179 | 30TON AUSTRALIA |
2012 |
137 | UNKNOWN | PT. PROFAB INDONESIA | FITTING,FLANGE | A182F316/L | INDONESIA | 2012 |
138 | WORSLEY FACILITIES PROJTECT | ENERFLEX PROCESS PTY LTD | FORGED FITTING/FLANGE | A105N/A350LF2/A694F52 | AUSTRALIA | 2012 |
139 | THAI NATIONAL POWER 2 SPP POWER PROJECT | UNKNOWN | FITTING,FLANGE | A234WPB/A105N | THAILAND | 2012 |
140 | PNG LNG EPC4 (FUEL GAS CONDITIONING SYSTEM) | UNKNOWN | FITTING,FLANGE | A182F316L/A105N/A350LF2 | SINGAPORE | 2012 |
141 | HOPE DOWN'S 4 PROJECT | MONADELPHOUS | AS2129 FLANGE | A105N | 20TON AUSTRALIA |
2012 |
142 | MODIFICATION PIPELINE PROJECT | PT. PERTAMINA BALONGAN | ERW PIPE,FITTING | API 5L-B/A234WPB/A105N | 60TON JAKARTA |
2012 |
143 | PERTAMINA GAS-PERTAGAS PROJECT | PT. WIJAYA KARYA | PIPE BEND | API 5L-B | 30TON SINGAPORE |
2012 |
144 | SBM OSX2 TOP SIDE | UNKNOWN | FLANGE,FITTING, FORGED FITTING |
A105N/A403-WP316L/A815 S81803/A182F51/A182F53 | SINGAPORE | 2012 |
145 | CROSS COUNTRY PROJECT | PT. PERTAMINA RU IV Cilacap | DSAW PIPE | API 5L-B PSL1 WITH 3LPP COATING | 730TON INDONESIA |
2012 |
146 | BANYU URIP PROJECT | MOBIL CEPU INDONESIA | SAW PIPE | API 5L-B PSL2 SOUR/NON SOUR | 320TON INDONESIA |
2012 |
147 | BANYU URIP PROJECT | MOBIL CEPU INDONESIA | CLAD/SOLID TUBE SHEET | SA266Gr.2N+A240TP316L/ SA182F316L | INDONESIA | 2012 |
148 | BANYU URIP PROJECT | MOBIL CEPU INDONESIA | CLAD TUBE SHEET | SA266Gr.2N+SB-424 UNS N08825 | 30TON INDONESIA |
2012 |
149 | TYPE E'BOOSTER COMPRESSOR PACKAGE | CHEVRON THAILAND EXPLORATION & PRODUCTION LTD | SE 2:1 HEADS | SA516 GR.70N | THAILAND | 2012 |
150 | LPG REFRIGERATED STORAGE | PETROVIETNAM GAS CORPORATION | FITTING,FLANGE, BOLT/NUT,GASKET |
A234WPB/A105N | 30TON VIETNAM |
2012 |
151 | MAIBARARA GEOTHERMAL POWER PLANT | MAIBARARAGEOTHERMAL, INC | SEAMLESS/ERW/LSAW PIPE,FITTING,FLANGE | API 5L-B/A234WPB/A105N | 190TON PHILIPPINE |
2012 |
152 | HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT | PETROVIETNAM TECHNICAL SERVICES | FITTING,FLANGE, FORGED FITTING |
A234WPB/A420WPL6/A105/ A182F316L/A403WP304 |
40TON VIETNAM |
2012 |
153 | MAINTENANCE | CONOCO PHILIPS | U-TUBE | A789 TP31803 | 50TON INDONESIA |
2012 |
154 | MAINTENANCE | CONOCO PHILIPS | TUBESHEET,NOZZLE, FLANGE |
SA266 GR 4N/SA105N/SA182F316L | 45TON INDONESIA |
2012 |