STEEL WORLD CO., LTD
ONE-STOP SHOP FOR ALL KINDS OF PIPINGS MATERIALS
STEEL WORLD CO., LTD WILL CONTINUOUSLY DO ALL IT S BEST IN ORDER TO PROVIDE YOU WITH MOST
SATISFACTORY SERVICE FROM THE TIME OF RECEMING ENQUIRY TO THE PERFECT MANAGEMENT OF LOGISTICS.
No | PROJECT | CLIENT/CONTRACTOR | SUPPLIED ITEM | MATERIAL | QUANTITY/ COUNTRY |
YEAR |
298 | RABIGH PC2 PROJECT | MITSUI ENGINEERING & SHIPBUILDING CO.,LTD |
FITTING | A234 WPB | SAUDI ARABIA | 2009 |
299 | NESTOR OIL TUAS POWER SCOP PROJECT | JACOBS ENGINEERING SINGAPORE PTE LTD | FITTING | A234 WPB/A403 WP316L | SINGAPORE | 2009 |
300 | SAKHALIN II PROJECT | SAKHALIN ENERGY INVESTMENT CO.,LTD | FLANGE/GASKET | A182 F316/A350 LF2/SOFT IRON | 40 TON RUSSIA |
2009 |
301 | SOHAR FERTILISER PROJECT | MITSUBISHI HEAVY INDUSTRIES | FITTING/FORGED FITTING/FLANGE | A403 WP316L/A182 F316L | OMAN | 2009 |
302 | JAMBI MERANG PROJECT | PERTAMINA-HESS/PT.TRIPATRA | FLANGE | A240 S32760/A182 F51 | SINGAPORE | 2009 |
303 | JAMBI MERANG PROJECT | PERTAMINA-HESS/PT.TRIPATRA | FITTING | A234 WPB/A105 | 20 TON SINGAPORE |
2009 |
304 | JAMBI MERANG PROJECT | PERTAMINA-HESS/PT.TRIPATRA | FITTING | A403 WP316L/A182 F51/A815 S31803 | 25 TON SINGAPORE |
2009 |
305 | SA17780-CWLH REDEVELOPMENT PROJECT | DYNA MAC ENGINEERING SERVICES PTE LTD | FITTING | A694 F52/A860 WPHY52 | SINGAPORE | 2009 |
306 | CURTIS KELLY USA PROJECT | CURTIS KELLY | FLANGE | A182 F304/304L | 55 TON USA |
2009 |
307 | SIDI KRIR&EL ATF POWER STATION PROJECT | TOYOTA TSUSHO CORPORATION | BOLT/NUT | A193 B7/A194 2H | 15 TON EGYPT |
2009 |
308 | SPT OLEFINS FURNACES PROJECT | EXXONMOBIL CHEMICAL ASIA PACIFIC | FITTING/FLANGE | A105 | 10 TON THAILAND |
2009 |
309 | HAZELWOOD-ALSTOM POWER PROJECT | PT PAL INDONESIA | PIPE/FITTING/FLANGE | A106/DIN 2605 T1 BA3 | INDONESIA | 2009 |
310 | OYONG DEVELOPMENT PROJECT | PT PAL INDONESIA | FITTING | A234 WPB/A105 | INDONESIA | 2009 |
311 | ROPP PROJECT | PT REKAYASA | FITTING | A182 F304/A403 WP304 | SINGAPORE | 2009 |
312 | DBNGP EXPANSION PROJECT | DBNGP WA NOMINEES PTY LTD | FLANGE | A694 F60 | AUSTRALIA | 2009 |
313 | SINO IRON PROJECT | VISAVAKIT PATANA CORP.,LTD | NOZZLE/LWN FLANGE | SA182 F22 CL1 | THAILAND | 2009 |
314 | WORSLEY MULTI-FUEL COTEN PROJECT | AE&E (AUST) PTY LTD | FITTING | SA234 WP91/WP22 | CHINA | 2009 |
315 | TPO PROJECT | FOSTER WHEELER | FITTING/FORGED FITTING/FLANGE | A403 WP304A105/A182 F304 | 35 TON THAILAND |
2009 |
316 | DEVIL CREEK DEVELOPMENT PROJECT | CLOUGH THAILAND CO.LIMITD | FLANGE | A105/A350 LF2 | 30 TON INDONESIA |
2009 |
317 | PERTAMINA BALONGAN PROJECT | KRAKATAU ENGINEERING | SMLS/ERW PIPE/FITTING | A106 GR.B/A234 WPB | 210 TON INDONESIA |
2009 |
318 | JUBILEE FPSO | MODEC | FITTING/FORGED FITTING/FLANGE | A860 WPHY52/A234 WPC/A694 F52 | 50 TON SINGAPORE |
2009 |
319 | DUBAI WORLD CENTRAL INTERNATIONAL AIRPORT | GOVERNMENT OF DUBAI | FITTING | A234 WPB | 30 TON DUBAI |
2009 |
320 | UZTRANSGAS KUNGRAD GAS DEHYDRATION PROJECT | CW SINGAPORE | BOLT/NUT | A193 GR.B7/A194 GR.2H | 20 TON UZBEKISTAN |
2009 |
321 | UZTRANSGAS KUNGRAD GAS DEHYDRATION PROJECT | CW SINGAPORE | SAW PIPE/FITTING | API 5L-B(PSL1)/A671 CC60 C22 S2/WPL6 | 200 TON UZBEKISTAN |
2009 |
322 | JAMBI MERANG PROJECT | PERTAMINA-HESS/PT.TRIPATRA | EFW PIPE | A312 TP316L | SINGAPORE | 2009 |
323 | DSFAHA REFINERY GASOLINE PRODUCTION PROJECT | ESFAHAN OIL REFINING COMPANY | SAW PIPE | A672 GR.C65 CL.22/A691 GR.11/4CR CL.13 | 180 TON IRAN |
2009 |
324 | JAMBI MERANG PROJECT | PERTAMINA-HESS/PT.TRIPATRA | SMLS PIPE | A106 GR-B | 50 TON SINGAPORE |
2009 |
325 | TPO PROJECT | MTP HPPO MANUFACTURING CO.,LTD | EFW PIPE | A672 C70 CL.12 | 200 TON THAILAND |
2009 |
326 | BM PROJECT | MITSUBISHI HEAVY INDUSTRIES LTD | EFW PIPE | A358 304-CL2 | BRUNEI | 2009 |
327 | SPOX PROJECT | EXXONMOBIL CHEMICAL ASIA PACIFIC | SMLS/ERW PIPE | A106 GR-B/API 5L-B | 30 TON SINGAPORE |
2009 |
328 | RABIAH DEVELOPMENT PROJECT | MITSUI ENGINEERING & SHIPBUILDING CO.,LTD | SAW PIPE | API 5L-B (PSL1) | SAUDI ARABIA | 2009 |
329 | SINGAPORE LOCAL PROJECT | VAN LEEUWEN PIPE AND TUBE SINGAPORE | ERW PIPE | ASTM A53B | 20 TON SINGAPORE |
2009 |
330 | SINGA PIPELINE PROJECT | PT MEDCO E&P INDONESIA | ERW PIPE | API 5L-X65 | 1020 TON INDONESIA |
2009 |
331 | MAIN NORTH DURI DEVELOPMENT PROJECT | BP MIGAS FOR CHEVRON INDONESIA | ERW PIPE | API 5L-B(PSL1) | 110 TON INDONESIA |
2009 |
332 | RABIGH PC2 PROJECT | MITSUI ENGINEERING & SHIPBUILDING CO.,LTD | ERW PIPE/FLANGE | API 5L-B (PSL1) / A105 | SAUDI ARABIA | 2009 |
333 | NNGPF-PAD M1&M2 PROJECT | PNOC/EDC | ERW/SAW PIPE | API 5L-B (PSL1) | 10 TON PHILIPPINE |
2009 |
334 | LGPF-PAD MG-F WELLS PROJECT | PNOC/EDC | ERW/SAW PIPE | API 5L-B(PSL1) | 320 TON PHILIPPINE |
2009 |
335 | WORSLEY MULTI FUEL COGEN PROJECT | AE&E NANJING BOILER CO.,LTD | FLANGE/FITTING/GASKET | SA234 WP22 | CHINA | 2009 |
336 | M3-232 DULANG PROJECT | PETRONAS | FLANGE, FORGED FITTING | SA694 F60 | 10 TONS MALAYSIA |
2009 |
337 | SMDS JETTY UPGRADE PHASE1 | SHELL MDS | FITTING | A182 F321/A403 WP321 | 8 TONS MALAYSIA |
2009 |
338 | PSR-2 REVAMP PROJECT | FOSTER WHEELER ENERGY LIMITED | FITTING/FLANGE | F321/F5/F304L/A285 GR.C/A105 | 23 TONS MALAYSIA |
2009 |
339 | MELAKA REFINERY PSR2 REVAMP PROJECT | TUAH NUSA SDN BHD | FITTING/FLANGE | F5,F9,F11,F316L, F321,F304L,A105 | 12 TONS MALAYSIA |
2009 |
340 | KUMANG&TANGGA BARAT CLUSTER DEVELOPMENT PROJECT | PETRONAS CARIGALI SDN BHD | FLANGE/FORGED FITTING | LF2/A105N/A182 F316L/A694 F65 | 13 TONS MALAYSIA |
2009 |
341 | FOSTER WHEELER PROJECT | FOSTER WHEELER E&C SDN BHD | FLANGE/FITTING | F321/A105N/F316/A285 GR.C/F9/F11/F5 | 20 TONS MALAYSIA |
2009 |
342 | CARIGALI HEESS MRU PROJECT | TUAH NUSA SDN. BHD | FITTING/FLANGE | WP316L/WPL6/ WPB/A105N/F316L | 306 TONS MALAYSIA |
2009 |
343 | PSR-2 REVAMP PROJECT | FORSTER WHEELER SDN. BHD | FITTING/FLANGE | F11/F9/A285 GR.C/F321/F304H | 15 TONS MALAYSIA |
2009 |
344 | PSR-2 REVAMP PROJECT | FOSTER WHEELER E&C SDN BHD | FLANGEOLET/SPACER RING | A182 F51/A815 UNS S31803 | 20 TONS MALAYSIA |
2009 |
345 | CARIGALI HEESS MRU PROJECT | TUAH NUSA SDN BHD | FITTING/FLANGE | WPL6/A234 WPB/A240 TP316 | 294 TONS MALAYSIA |
2009 |
346 | MAINTENANCE | MALAYSIAN FEFINING COMPANY SDN BHD | FITTING/FLANGE | A105N/F321/A182 F11/F5/A387 GR.5 | 12 TONS MALAYSIA |
2009 |
347 | MAINTENANCE | PETRONAS | FITTING/FLANGE | A182 F316 / A240 TP316 | 16TONS MALAYSIA |
2009 |
348 | MAINTENANCE | SHELL GLOBAL SOLUTIONS INTERNATIONAL | FITTING/FLANGE | A105/F65/F51/ S31803 | 14 TONS MALAYSIA |
2009 |
349 | MAINTENANCE | BRUNEI SHELL PETROLEUM CO. SDN.BHD. | FLANGE | A240 TP316/A105NA182 F304L | 6 TONS MALAYSIA |
2009 |
350 | FOSTER WHEELER PROJECT | FOSTER WHEELER | FLANGE/FITTING | LF2/A105N/A182 F321 | 50 TONS MALAYSIA |
2009 |
351 | FOSTER WHEELER PROJECT | FOSTER WHEELER | FLANGE | A240 GR.321/A516 GR.70/A182 F9 | 12 TONS MALAYSIA |
2009 |
352 | FOSTER WHEELER PROJECT | FOSTER WHEELER E&C SDN BHD | SPACER RING | A285 GR.C/A387 GR.11/GR.9/GR.5 | 10 TONS MALAYSIA |
2009 |
353 | PPCL BPA PROJECT (BOI PROJECT) | PTT PHENOL COMPANY LIMITED | FITTING | A403 WP304L | 21 TONS THAILAND |
2009 |
354 | PPCL BPA PROJECT (BOI PROJECT) | PTT PHENOL COMPANY LIMITED | FITTING/FLANGE | A403 WP304/A105 | 81 TONS THAILAND |
2009 |
355 | BOI PROJECT | PTT POLYETHYLENE COMPANY LIMITED | FLANGE | A105N/A182 F304L/F316L | 90 TONS THAILAND |
2009 |
356 | BOI PROJECT | PTT PHENOL COMPAY LIMITED. | FITTING | A403 WP304 | 33 TONS THAILAND |
2009 |
357 | ENERFLEX BP PROJECT | SPECIAL TECHNICAL SERVICES LLC | FLANGE | SA350 LF2 | 6.8 TONS OMAN |
2009 |
358 | KANSAI-30 VESSELS&HEAT EXCHANGE | KANSAI CHEMICAL ENGINEERING | TUBE/U-TUBE | A213 TP304/304L | 7 TONS MALAYSIA |
2009 |
359 | LANGSAT TERMINAL PROJECT | LANGSAT TERMINAL SDN BHD | FORGED FITTING | A105 | 16 TONS MALAYSIA |
2009 |
360 | LANGSAT TERMINAL PROJECT | LANGSAT TERMINAL SDN BHD | FITTING/FLANGE | A234 WPB/A105 | 438 TONS MALAYSIA |
2009 |
361 | NF3 PLANT OF BIPC | PETROCHEMICAL INDUSTRIES DEVELOPMENT | TUBE | SS316 | 10 TON IRAN |
2009 |
362 | NF3 PLANT OF BIPC | PETROCHEMICAL INDUSTRIES DEVELOPMENT | FITTING | A182 F316/A105 | 9,100 PCS IRAN |
2009 |
363 | NF3 PLANT OF BIPC | PETROCHEMICAL INDUSTRIES DEVELOPMENT | VALVE/CONNECTOR | A182 F316 | 2530 PCS IRAN |
2009 |
364 | NF3 PLANT OF BIPC | PETROCHEMICAL INDUSTRIES DEVELOPMENT | FLANGE | LF3/A105N/F11/LF2 | 192 TON IRAN |
2009 |
365 | NF3 PLANT OF BIPC | PETROCHEMICAL INDUSTRIES DEVELOPMENT | FLANGE/TUBESHEET | F304/LF2/SA266 GR.2/A105 | 183 TON IRAN |
2009 |
366 | TUPI PROJECT | AIBEL LIMITED | FITTING | A403 WP316L | 14 TON THAILAND |
2009 |
367 | TUPI PROJECT | AIBEL LIMITED | FORGED BAR | A694 F52 | 7 TON THAILAND |
2009 |
368 | TUPI PROJECT | AIBEL LIMITED | FORGED PIPE | A671 GR.CC65 CL.22 | 30 TON THAILAND |
2009 |
369 | PSR2 REVAMP PROJECT | FORSTER WHELLER | SAW PIPE | API 5L GR.B PSL 2 | 50 TON MALAYSIA |
2009 |
370 | MELAKA REFINERY PSR2 RAVAMP PROJECT | MALAYSIAN REFINING COMPANY | ERW/SAW PIPE | A672 CC60 CL.22/API 5L GR.B | 65 TON MALAYSIA |
2009 |
371 | KUMANG&TANGGA BARAT CLUSTER DEVELOPMENT PROJECT | SIME DARBY ENGINEERING SDN BHD | ERW PIPE | A671 GR.CC65 CL.22 | 600 TON MALAYSIA |
2009 |
372 | ARTHIT PROJECT | PANTECH | SAW PIPE | A671 CL.22 S2 | 40 TON MALAYSIA |
2009 |
373 | SAUDI KAYAN HDPE PROJECT | DAELIM | SMLS PIPE | A106-B 3 LAYER PE COATING | 60 TON MALAYSIA |
2009 |
374 | LANGSAT TERMINAL PROJECT | LANGSAT TERMINAL SDN BHD | ERW/SAW PIPE | API 5L GR.B PSL 1 | 2,750 TON MALAYSIA |
2009 |
375 | LANGSAT TERMINAL PROJECT | LANGSAT TERMINAL SDN BHD | ERW PIPE | API 5L GR.B | 500 TON MALAYSIA |
2009 |
376 | DE&C PUNJ-LLOYD SSGP PROJECT | DIALOG OTEC SDN BHD | SAW PIPE | API 5L X70 PSL2 | 108 TON MALAYSIA |
2009 |